Republic of the Philippines

PANGASINAN STATE UNIVERSITY


College of Engineering and Architecture
Urdaneta Campus

Energy Consumption Survey


and Analysis
Energy Management and Engineering
(Elective 2)

The Energy Team Members

Rey Gefferson U. Galano

Esteban Corbe

Rajiv D. Menor

Christian Neil S. Abalos

Eugenio Antonio S. Lavarias, Jr.

BS Mechanical Engineering

Engr. Reynaldo Lomboy

Energy Team Advisor

2nd Semester A.Y. 2014-2015


Copyright2015 Pangasinan State University. All Rights Reserved.

Table of Contents
Acknowledgment

Introduction

Tabulated Data

Data Analysis

The Action Plan

Conclusion

Recommendation

Appendix
Acknowledgement

We are using this opportunity to express our gratitude to everyone who

supported and helped us throughout this survey. We would like to thank our dean

Dr. Suyat, for letting us conduct our survey in the Architecture/ICT building of

Pangasinan State University. We would also like to thank Archi. Castillo, the

chairman of architecture department; Dr. Patacsil, the Chairman of ICT department;

Madam Andres, our school librarian and other faculty members for guiding us in

conducting our survey.

We would like to express our deepest gratitude to Engr. Reynaldo Lomboy,

our Energy Team Advisor, for teaching us everything we need to know to complete

this research report.

Lastly, but most importantly, we would like to thank the Almighty God for

giving us strength, knowledge and wisdom while doing this research report.
Introduction
This survey and analysis aims to obtain data about the electrical energy

consumption of the whole Archi/ICT building from February 16 to March 13 and

provide appropriate action plan to any energy-related problem found during the

survey. This includes the efficiency of the room with respect to the comfort of the

students using it.

The data will be gathered by collecting the power rating of each appliance in

each location (rooms, offices and corridors/hallways) and monitoring their time of

usage. Unfortunately, due to the teams busy schedule with other major course

subject, the team cannot monitor the specified area; the time of usage of some

appliances will be based on the rooms schedule while others will be based on

frequency of usage provided by the faculty instead.


Tabulated Data
Archi/ICT Building 1ST FLOOR

Location: AR 101 Area:31.5m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent Lamp 2 0 24W
Electric Fan 2 2 65W
Outlets 4
Analysis/Notes: Insufficient lightings. Total

Location: AR 102 Area: 31.5m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent Lamp 2 0 24
Electric Fan 1 1 65
Outlets 4
Analysis/Notes: Insufficient lightings. Total

Location: AR 103 Area: 66.5m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent Lamp 5 0 24
Electric Fan 4 3 65
Outlets 9
Analysis/Notes: Insufficient lightings. Total

Location: AR 104 Area: 80.5m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL 2 0 24
Fluorescent Lamp 6 0 24
Electric Fan 6 2
Outlets 4
Analysis/Notes: Insufficient lightings. Total

Location: AR 105 Area: 63m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent Lamp 8 2 24
Electric Fan 4 2 65
Outlets 4
Analysis/Notes: Insufficient lightings.

Location: ROTC Headquarters Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL 1 1 20
Electric Fan 1 1 70
Outlets 4
Analysis/Notes:

Location: CR Male/Female Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL 4 0 24
Pump 1 1 756
Analysis/Notes: Insufficient lightings.

Location: Architecture Department Office Area: 56m2


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL 1 0 24
Fluorescent Lamp 4 2 24
Fluorescent Lamp 1 1 40
Stand Fan (Camel) 1 1 60
Stand Fan (Mitsu 1 1 50
Tech)
Aircon 1 1 1492
Water Dispenser 1 1 90
DVD Player 1 1 12
DVD Portable 1 1 14
Rice Cooker 2 2 400
TV (Flat) 1 1 65
Radio 1 1 250
Outlet 4
Analysis/Notes: No Comment Total

Location: ICT Lec. Room Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent Lamp 8 1 24
Electric Fan 4 2 65
Outlets 6
Analysis/Notes: Insufficient lightings. Total

Location: 1st Floor Hallway Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL (EG) 6 1 20
CFL (HOE) 1 1 18
CFL (Philips) 3 1 24
Outlet
Analysis/Notes: Insufficient lightings. Total

Archi/ICT Building 2nd FLOOR

Location: 2nd Floor Hallway Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
CFL (unrated) 6 0 ~
CFL (Philips) 6 2 24
Stand Fan 1 1 280
Outlet 2
Analysis/Notes: Insufficient lightings. Total
Location: Business Assistance Center Area:
Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Computer Monitor 19 19 72
Computer Power 19 19
Supply
Projector 1 1 550
Aircon 1 1 1120
Stand Fan 1 1 60
Water Dispenser 1 1 380
CFL 2 2 24
Outlet 24
Analysis/Notes: Insufficient lightings.

Location: ICT Office Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Netbook 2 2
Laptop 6 6
Water Dispenser 1 1 380
Aircon 1 1 1492
Canon mp237 1 1
Printer
Computer Power 1 1 300
Supply
Computer Monitor 1 1 330
TV 1 1 120
Component DVD 1 1 60
LG
DVD Xenon 1 1 20
Speaker LG 2 2 60
Fluorescent 2 2 24
Wi-fi Router 1 1 7.65
Wi-fi Router HUB 1 1 12.5
Speaker MPQ 1 1 300
Genius Speaker 1 1 41.8
Outlet 12
Analysis/Notes: Total

Location: ICT Lab 1 Area:


Appliances/Load/Outl Total No. of Rating Usage Consumption
ets No. of Working (Watts) (hours) (Watt-hour)
Units Units
Computer Power 25 25 600
Supply Styling
Computer Monitor 25 25 330
AOC
Fluorescent 2 1 24
CFL 3 3 20
Aircon Carrier 1 1 1492
Wi-Fi Router 1 1 1.44 640
Speaker 1 1 1
Printer EPSON 1 1 66
Projector 1 1 550
Outlet 36
Analysis/Notes: Total

Location: ICT Lab 2 Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Computer Power 15 14 600
Supply
Computer Monitor 15 14 330
Fluorescent 2 2 24
CFL 2 2 20
Aircon 1 1 1492 640
Wi-Fi Router 1 1 1.44 640
Projector 1 1 550
Laptop 1 1 35
Outlet 15
Analysis/Notes: Total

Location: ICT Lab 3 Area:


Appliances/Load/Outlet Total No. of Rating Usage Consumption
s No. of Working (Watts) (hours) (Watt-hour)
Units Units
Computer Power 21 21 600
Supply Samsung
Computer Monitor AOC 11 11 330
Computer Monitor AOC 1 1 330
Flat
Computer Monitor 5 5 396
MLite
Computer Monitor 4 4 330
AlphaScan Sampo
Fluorescent 4 3 24
CFL 3 3 20
Aircon 1 1 1492
Wi-Fi Router 1 1 1.44
Laptop 1 1 220
Projector 1 1 550
Outlet 18
Analysis/Notes:

Location: ICT Lab 4 Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Computer Power 20 20 600
Supply
Computer Monitor 17 17 330
AOC
Computer Monitor 1 1 66
Acer
Computer Monitor 2 2 550
AOC
Fluorescent 2 0 24
CFL 4 4 20
Aircon 1 1 1492
Projector 1 1 704
Outlet 10
Analysis/Notes: Total

Location: ICT Lab 5 Area:


Appliances/Load/Outlet Total No. of Rating Usage Consumption
s No. of Working (Watts) (hours) (Watt-hour)
Units Units
Computer Power 13 13 600
Supply
Giant
Computer Monitor 12 12 330
Computer Power 4 4
Supply Office Station
Computer Monitor 1 1 440
Diamond
Computer Monitor Acer 5 5 66
Fluorescent 6 4 24
CFL 6 2 20
Aircon 2 2 2HP
Laptop 1 1 440
Projector 1 1 550
Outlet 26
Notes: Computer systems are too old to be used by the
students

Location: Cyber Center Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Computer Power 23 23 600
Supply
Computer Monitor 23 23 330
CFL 8 8 20
Aircon 2 2 1492
Fluorescent 2 1 24
Vacuum Cleaner 1 1 1600
Printer (Brother) 3 2 77
Printer (Forgo) 1 1 84
Battery Charger 1 1 4
Wi-Fi Router 2 2 1.44
Electric Fan 2 2 65
(Standard)
Outlet 44
Analysis/Notes:

Archi/ICT 3rd Floor

Location: Library Area:


Appliances/Load/Outl Total No. of Rating Usage Consumption
ets No. of Working (Watts) (hours) (Watt-hour)
Units Units
CFL 45 35
Aircon National 2 2 1492
Aircon Carrier* 2 2
Aircon Panasonic 1 1 1210
Aircon Hitachi 3 2 Model#
RA
120mA
Computer Power 10 10 600
Supply
Computer Monitor 10 10 154
Computer Power 1 1 770
Supply ASTONE
Computer Monitor 1 1 330
Speaker 1 1 66
Electric Fan Standard 1 1 63
Electric Fan Camel 2 2 75
Printer HP Laser Jet 1 1
Printer Canon 1 1 50
Laminator 1 1 420
Outlet
Analysis/Notes: Total

Location: 3rd Floor Hallway Area:


Appliances/Load/O Total No. No. of Rating Usage Consumption
utlets of Units Working (Watts) (hours) (Watt-hour)
Units
Fluorescent 2 2 24 0 0
Analysis/Notes: Total
Data Summary
Location: 1st Floor Consumption (kilowatt-hour)
AR 101 4680
AR 102 7020
AR 103 9360
AR 104 14040
AR 105 19224
ICT Lecture Room 2310
Architecture Department Office 310760
ROTC Office 1800
Comfort Room 134280
Hallway 0
Total 503474

Location: 2nd Floor Consumption (kilowatt-hour)


ICT Lab 1 976237.96
ICT Lab 2 1008489.76
ICT Lab 3 1337035.2
ICT Lab 4 960352
ICT Lab 5 113400
ICT Department Office 611056
Business Assistance Office 150936
Cyber Center 1764291.2
Hallway 7680
Total 6929478.12
Location: 3rd Floor Consumption (kilowatt-hour)
Library
Hallway
Total

Floor Consumption (kilowatt-hour)


1st Floor - Architecture Department
2nd Floor ICT Department
3rd Floor - Library
Total

Data Analysis
Based on the tabulated data, it shows that most of the power consumption of

the building is from rooms in the second floor, where a lot of computer systems and

air conditioning systems are being used simultaneously throughout the day. This is

due to the fact that most computer-related subjects are being thought in these

facilities and air conditioning system is recommended for the maintaining the

computers in good condition and prevent overheating.

One of the rooms in the second floor, specifically ICT Lab 5 contains obsolete

and old model of computer systems which are not being used anymore due to their

poor performance compared to the newer computer systems in the other rooms.

It is also found that the rooms in first floor of the building lack lightings and

other appliance such as electric fans are not functional which could result in

discomfort of the students having class in these rooms. Considering that most if not

all of the students in these rooms are BS architecture students whose major
subjects are related to drawing, poor lightings has a big impact in their

performance.

The library also has some defective compact fluorescent lamps that may

affect the il experience of the students and other personnel reading in the library.

The Action Plan


Implementation Evaluation
Progr
Ti Evid
Objectiv Activities Expected ess
In charge m Resources enc
e / Action Output Indic
e e
ator
Posters
advising the
turning-off of
To
appliances Reduced
reduce The 1
Posting when leaving Energy
Energy Whole da
Advisory the room (with Consumpti
Consum Team y
the approval of on
ption
the
department
chairman)
The Increase in
Whole energy
To Replace Compact
Team 1 consumptio
improve ment of Fluorescent
(with the w n but
lightings broken Lamps from
guidance ee better
in the 1st fluoresce university
of an k performanc
floor nt lamps budget
electricia e of
n) students
To Replace The 1 Electric Fans Increase in
improve ment of Whole w from university energy
ventilati broken Team ee budget consumptio
(with the n but
on in guidance better
electric
the 1st of an k performanc
fans
floor electricia e of
n) students
Replace The
Computer
ment of Whole 1
Systems from
the Team da
To university
compute (with the y
improve budget
rs OR guidance
ICT Lab
Removal of the
5 1
of the computer
da
compute engineers
y
rs )
Conclusion

Recommendation