SALARIO
ITEM CLASIFICACIN BASICO
PROMEDIO
(Bs./Da) Bs.
1,192.290 5,961.45
2,000.000 4,000.00
1,192.290 9,538.32
1,382.190 8,293.14
1,264.900 5,059.60
1,466.370 7,331.85
1,192.290 5,961.45
1,423.660 7,118.30
1,192.290 5,961.45
1,228.060 1,228.06
1,423.660 2,847.32
1,423.660 2,847.32
1,382.190 1,382.19
1,423.660 2,847.32
1327.88
FORMATO IV.6
1,626,994,345 100%
Monto Total de la Oferta o del Rengln de la Oferta (No
incluye IVA)
GASTOS ADMINISTRATIVOS
DESCRIPCIN %
A GASTOS GENERALES DE OBRA 1%
B SERVICIOS ADMINISTRATIVOS Y TCNICOS 0%
C GASTOS ASOCIADOS A LA LABOR INDIRECTA 1%
D EQUIPO Y PERSONAL AUXILIAR 20%
E INSTALACIONES PROVISIONALES 6%
F ADMINISTRACIN OFICINA PRINCIPAL 27%
G IMPUESTOS MUNICIPALES 45%
% SOBREC LABOR
TOTAL
TOTAL B
C GASTOS ASOCIADOS A LABOR INDIRECTA
EQUIPOS DE SEGURIDAD LABOR
INDIRECTA UNIDAD CANTIDAD pu Bs./DIA
CASCO( 1 POR PERSONA AL AO) UND 10 6500 1
BRAGA DE SEGURIDAD(4 X PERSONA) UND 12 35000 1
LENTE(2 X MESXPERSONA) UND 360 450 1
BOTA DE SEGURIDAD(4 X PERSONA AL AO) UND 15 45000 1
GUANTES( 1 PZA X SEMANA X PERSONA) UND 180 600 1
MASCARILLA( 1 UND X DIA X PERSONA) UND 500 430 1
CINTURN DE SEGURIDAD(1 C/6 MESES) UND 6 4500 1
CHALECO SALVAVIDAS UND 6 20500 1
PROTECTOR AUDITIVO( 2 X MES X PERSONA) UND 360 300 1
DETECTOR DE GASES PZA
TOTAL C
DESCRIPCIN unidad cantidad das Bs/da
G IMPUESTOS %
IMPUESTOS MUNICIPALES (TASA PARA CARDN: 2% % DEL SUB-TOTAL DE LA OFERTA SIN GASTOS REEMBOLSABLES) 2%
IMPUESTOS MUNICIPALES(TASA PARA AMUAY: 3% DEL SUB-TOTAL DE LA OFERTA SIN GASTOS REEMBOLSABLES) 3%
TIMBRES FISCALES (0,1 % DEL SUB-TOTAL DEL MONTO DE LA OFERTA SIN GASTOS REEMBOLSABLES
TOTAL G
TOTAL COSTOS INDIRECTOS DE LA OBRA:
TOTAL
-
-
78,000.00
-
-
102,000.00
102,000.00
540,000.00
280,800.00
18,000.00
175,769.12
1,296,569.12
TOTAL
0.00
0.00
1.30
0.00
TOTAL
65,000
420,000
162,000
675,000
108,000
215,000
27,000
123,000
108,000
-
1,903,000
TOTAL
25,200,000.00
0.00
3,780,000.00
630,000.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
540,000.00
540,000.00
540,000.00
540,000.00
540,000.00
0.00
0.00
0.00
130%
3,510,000.00
33,120,000.00
TOTAL
1,625,000.00
750,000.00
1,500,000.00
3,000,000.00
500,000.00
2,225,000.00
0.00
9,600,000.00
43,974,719.09
32,539,886.90
40,674,858.62
1,626,994.34
74,841,739.87
164,736,028.08
13.11%
ESQUEMA DE PRECIOS UNITARIOS
MANTENIMIENTO DE LAS
BOYAS DEL CENTRO DE
REFINACIN PARAGUAN"
ID DESCRIPCIN ACTIVIDAD
Pgina 11 de 177
ESQUEMA DE PRECIOS UNITARIOS
MANTENIMIENTO DE LAS
BOYAS DEL CENTRO DE
REFINACIN PARAGUAN"
ID DESCRIPCIN ACTIVIDAD
7 Estudios batimtricos.
Reubicar boyas a coordenadas del canal
8
de navegacin.
9 Barreras de contencin.
9.1 Instalar barreras de contencin.
9.2 Remover barreras de contencin.
Pgina 12 de 177
ESQUEMA DE PRECIOS UNITARIOS
MANTENIMIENTO DE LAS
BOYAS DEL CENTRO DE
REFINACIN PARAGUAN"
ID DESCRIPCIN ACTIVIDAD
Pgina 13 de 177
ESQUEMA DE PRECIOS UNITARIOS
MANTENIMIENTO DE LAS
BOYAS DEL CENTRO DE
REFINACIN PARAGUAN"
ID DESCRIPCIN ACTIVIDAD
Pgina 14 de 177
PDVSA PETRLEO, S.A.
CENTRO DE REFINACIN PARAGUAN
PROCESO DE CONTRATACIN N:
DESCRIPCION DEL PROCESO: "SERVICIOS DE MANTENIMIENTO SUBMARINO, LIMPIEZA DE ESTACIONES
BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO DE LAS B
DEL CENTRO DE REFINACIN PARAGUAN"
ESTRUCTURA GENERAL
H-H
1.- LABOR DIRECTA
1.1.- COSTO DEL PERSONAL 175,769
1.2.- HERRAMIENTAS
3.- MATERIALES
1/1
TOTAL OFERTA Bs.:
Firma:
1/1
L DE LA OFERTA
GENERAL
Bs.
115,973,557.44 659.80621
699,271.30 3.9783513
56,011,206.56 318.66352
172,684,035.30
34,028,208
14,002,802 79.66588
49,101,940
63,104,742
986,603,561 5613.0654
986,603,561 1,256,420,546
196,252,931
174,320,868
1,626,994,344.97
81,349,717
195,239,321
32,539,887
48,809,830
1/1
1,984,933,100.86 11,293
###
Da / mes / ao
Emisin de la oferta: ____/___/_____
1/1
Estructura de Costos de Labor Directa. - Convencin Cole
Contratista:
10-Sep-13 INICIO
4-Sep-14 FIN
Sbados 51.00 D
Domingos 51.00
Induccin Seguridad
Contingencia 4.00 0
Tipo de Jornada
LUNES A VIERNES
Tiempo de Ejecucin
12.00 MESE(ES)
Horas Trabajadas
Das
Costos Fijos Bs. Bs./SB
Ayuda Sustitutiva de Vivienda 2,520.00 1.90
Transporte 0.00
Herramientas 0.00
"SERVICIOS DE MANTENIMIENTO SUBMARINO, LIMPIEZA DE ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIEN
OBRA DE LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 50% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
EQUIPO DE BUCEO AUTONOMO(SCUBA) 50% 2.00 60,316.70
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 2.00 165.99
Obrero 100% 2.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
EQUIPO DE BUCEO AUTONOMO(SCUBA) 100% 2.00 60,316.70
CAMARA DE VIDEO DIGITAL 100% 1.00 2,692.71
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 2.00 165.99
Obrero 100% 2.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 50% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 2.00 165.99
Obrero 100% 4.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 4.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 4.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 25% 1.00 4,308.34
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
0.00
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 25% 1.00 6,731.77
0.00
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 1.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 25% 1.00 4,308.34
PEERO 25% 1.00 6,731.77
0.00
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 1.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 25% 1.00 4,308.34
PEERO 25% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
TROMPO MEZCLADOR DE CONCRETO 50% 1.00 646.25
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Capataz 50% 1.00 165.99
Albail 100% 2.00 165.99
Obrero 100% 4.00 165.99
Cabillero (Fab.Est.Met) 100% 1.00 165.99
Operador 50% 1.00 165.99
Chofer 50% 1.00 165.99
"SERVICIOS DE MANTENIMIENTO SUBMARINO, LIMPIEZA DE ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIEN
OBRA DE LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 50% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Capataz 50% 1.00 165.99
Pintor 100% 6.00 165.99
Obrero 100% 8.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
EQUIP SAND BLAST C/COMPRESOR 750 CFM 100% 1.00 4,631.46
EQUIPO PARA APLICACIN DE PINTURA (PAILA ETC) 100% 1.00 2,315.73
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 25% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
EQUIP SAND BLAST C/COMPRESOR 750 CFM 50% 1.00 4,631.46
EQUIPO PARA APLICACIN DE PINTURA (PAILA ETC) 50% 1.00 2,315.73
MAQ DE SOLDAR 400A 50% 2.00 4,577.61
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
CAMION 350 50% 1.00 780.89
EQUIP SAND BLAST C/COMPRESOR 750 CFM 50% 1.00 4,631.46
EQUIPO PARA APLICACIN DE PINTURA (PAILA ETC) 50% 1.00 2,315.73
MAQ DE SOLDAR 400A 100% 2.00 4,577.61
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Capataz 50% 1.00 165.99
Obrero 100% 4.00 165.99
Fabricador de Estructuras 100% 1.00 165.99
Pintor 100% 2.00 165.99
Ayudante de Soldador 100% 2.00 165.99
Soldador 100% 2.00 165.99
Ayudante de Fabricador 100% 2.00 165.99
Total Personas Directas 13.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
Factor de sobrecosto Labor Indirecta
ANALISIS DE PRECIOS UNITARIOS
20
Inspeccionar sistema de 2.51 120.46 8.00 Rendimiento (unid/Dia):
proteccin catdica. Turnos 1.00 Unidad ACT Cantidad:
Materiales:
Cod. Descripcion Unidad Cantidad Costo/Unit.
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Electricista 100% 2.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 25% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Electricista 100% 2.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 1.00 165.99
Obrero 100% 2.00 165.99
Marino 100% 1.00 165.99
Electricista 100% 2.00 165.99
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
SISTEMA DE VIDEO GRABACION 100% 1.00 4,039.06
PEERO 100% 1.00 6,731.77
EQUIPO DE BUCEO AUTONOMO(SCUBA) 100% 2.00 60,316.70
CILINDROS DE AIRE COMPRIMIDO 100% 2.00 430.83
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Buzo 100% 12.00 165.99
Marino 100% 4.00 165.99
Capataz 100% 4.00 165.99
0.00% 0.00
Total Personas Directas 20.00
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
Factor de sobrecosto Labor Indirecta
Total Mano de Obra Indirecta
Costo Uni. Mano de Obra indirecta
ANALISIS DE PRECIOS UNITARIOS
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
EQUIPO PARA TOPOGRAFIA 100% 1.00 646.25
LANCHA TIPO PILOTAJE 100% 1.00 5,385.42
BOTE DE GOMA 100% 1.00 963.99
CAMIONETA PICKUP 100% 1.00 4,308.34
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Capataz 100% 1.00 165.99
Topografo 100% 2.00 165.99
Obrero 50% 4.00 165.99
0.00% 0.00
Total Personas Directas 5.00
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
Factor de sobrecosto Labor Indirecta
ANALISIS DE PRECIOS UNITARIOS
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 6.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
Factor de sobrecosto Labor Indirecta
Total Mano de Obra Indirecta
ANALISIS DE PRECIOS UNITARIOS
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 6.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
Factor de sobrecosto Labor Indirecta
ANALISIS DE PRECIOS UNITARIOS
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 6.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
ANALISIS DE PRECIOS UNITARIOS
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
0.00%
Total Personas Directas 4.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
ANALISIS DE PRECIOS UNITARIOS
Precio Total
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
0.00%
Total Personas Directas 4.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
ANALISIS DE PRECIOS UNITARIOS
Precio Total
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 25% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
0.00%
Total Personas Directas 4.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
ANALISIS DE PRECIOS UNITARIOS
Precio Total
"SERVICIOS DE MANTENIMIENTO SUBMARINO, LIMPIEZA DE ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIEN
OBRA DE LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 6.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
ANALISIS DE PRECIOS UNITARIOS
Precio Total
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 50% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 4.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 6.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
ANALISIS DE PRECIOS UNITARIOS
Precio Unitario
Precio Total
"SERVICIOS DE MANTENIMIENTO SUBMARINO, LIMPIEZA DE ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIEN
OBRA DE LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
Total Materiales
Costo Unitario Materiales
Equipos:
Cod. Descripcion %Util Cantidad Costo/ Hora
CAMIONETA PICKUP 100% 1.00 4,308.34
PEERO 100% 1.00 6,731.77
0.00
HERRAMIENTAS MENORES
Total Equipos
Costo Unitario Equipos
Mano de Obra Directa:
Cod. Descripcion %Util Cantidad Costo/ Hora
Obrero 100% 2.00 165.99
Capataz 50% 1.00 165.99
Buzo 100% 2.00 165.99
0.00%
Total Personas Directas 4.50
FSL= 2.9730
Total Mano de Obra
Costo Uni. Mano de Obra
Mano de Obra Indirecta:
Cod. Descripcion %Util Cantidad Costo/ Hora
GERENCIA DE OBRA 8.00% 1.00 800.00
SUPERVISION 20.00% 1.00 650.00
Total Personas 2.00
ANALISIS DE PRECIOS UNITARIOS
3.40
9.41
180
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48,960.00
195,840.00
0.00
244,800.00
1,360.00
Total Costo
329,588.00
514,981.00
9,228,455.00
0.00
0.00
0.00
2,448.00
10,075,472.00
55,974.84
Total Costo
50,792.00
50,792.00
0.00
0.00
0.00
0.00
101,584.00
302,009.23
403,593.23
2,242.18
Total Costo
39,168.00
79,560.00
118,728.00
0.00
118,728.00
659.60
60,236.63
9,408.96
69,645.59
8,357.48
78,003.07
78,003.07
14,040,551.05
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.42
13.22
240
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
46,464.00
185,856.00
0.00
232,320.00
968.00
Total Costo
625,570.00
488,727.00
17,515,970.00
390,981.00
0.00
0.00
0.00
2,323.20
19,023,571.20
79,264.88
Total Costo
48,202.00
48,202.00
0.00
0.00
0.00
0.00
96,404.00
286,609.09
383,013.09
1,595.89
Total Costo
37,171.20
75,504.00
112,675.20
0.00
112,675.20
469.48
82,298.25
12,854.99
95,153.23
11,418.39
106,571.62
106,571.62
25,577,189.35
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.00
28.00
280
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
44,800.00
179,200.00
0.00
224,000.00
800.00
Total Costo
172,333.00
269,271.00
0.00
0.00
0.00
0.00
0.00
2,240.00
443,844.00
1,585.16
Total Costo
26,558.00
53,115.00
13,279.00
0.00
0.00
0.00
92,952.00
276,346.30
369,298.30
1,318.92
Total Costo
35,840.00
72,800.00
108,640.00
0.00
108,640.00
388.00
4,092.08
639.18
4,731.26
567.75
5,299.01
5,299.01
1,483,723.91
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
45.17
1.06
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10,839.96
43,359.85
0.00
54,199.82
18,066.61
Total Costo
97,296.00
152,025.00
0.00
0.00
0.00
0.00
0.00
542.00
249,863.00
83,287.67
Total Costo
3,748.00
14,994.00
3,748.00
0.00
0.00
0.00
22,490.00
66,862.77
89,352.77
29,784.26
Total Costo
8,671.97
17,614.94
26,286.91
0.00
26,286.91
8,762.30
139,900.83
21,852.51
161,753.34
19,410.37
181,163.71
181,163.71
543,491.14
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
22.84
2.10
Costo/Total
0.00
28,500.00
0.00
0.00
0.00
0.00
0.00
5,481.96
21,927.84
0.00
55,909.80
18,636.60
Total Costo
49,204.00
76,882.00
0.00
0.00
0.00
0.00
0.00
274.10
126,360.10
42,120.03
Total Costo
1,896.00
7,583.00
1,896.00
0.00
0.00
0.00
11,375.00
33,817.88
45,192.88
15,064.29
Total Costo
4,385.57
8,908.18
13,293.75
0.00
13,293.75
4,431.25
80,252.17
12,535.39
92,787.56
11,134.50
103,922.06
103,922.06
311,766.18
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
0.66
48.58
120
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,324.17
25,296.70
0.00
31,620.87
263.51
Total Costo
85,146.00
133,040.00
0.00
0.00
0.00
0.00
0.00
316.21
218,502.21
1,820.85
Total Costo
3,280.00
6,561.00
3,280.00
0.00
0.00
0.00
13,121.00
39,008.73
52,129.73
434.41
Total Costo
5,059.34
10,276.78
15,336.12
0.00
15,336.12
127.80
2,646.57
413.39
3,059.97
367.20
3,427.17
3,427.17
411,259.89
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
1.30
18.50
24
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,491.33
9,965.32
0.00
12,456.65
519.03
Total Costo
44,723.00
34,940.00
0.00
0.00
0.00
0.00
0.00
124.57
79,787.57
3,324.48
Total Costo
0.00
3,446.00
1,723.00
0.00
0.00
0.00
5,169.00
15,367.44
20,536.44
855.68
Total Costo
1,993.06
4,048.41
6,041.48
0.00
6,041.48
251.73
4,950.92
773.33
5,724.26
686.93
6,411.19
6,411.19
153,868.49
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
7.08
3.39
11
Costo/Total
0.00
0.00
330,000.00
0.00
0.00
0.00
0.00
6,231.53
24,926.14
0.00
361,157.67
32,832.52
Total Costo
111,865.00
0.00
0.00
0.00
0.00
0.00
0.00
311.58
112,176.58
10,197.87
Total Costo
0.00
8,620.00
4,310.00
0.00
0.00
0.00
12,930.00
38,440.89
51,370.89
4,670.08
Total Costo
4,985.23
10,126.24
15,111.47
0.00
15,111.47
1,373.77
49,074.24
7,665.40
56,739.63
6,808.77
63,548.40
63,548.40
699,032.40
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.00
12.00
66
Costo/Total
0.00
0.00
891,000.00
0.00
0.00
0.00
0.00
10,560.00
42,240.00
0.00
943,800.00
14,300.00
Total Costo
47,392.00
0.00
0.00
0.00
0.00
0.00
0.00
528.00
47,920.00
726.06
Total Costo
0.00
14,607.00
7,303.00
0.00
0.00
0.00
21,910.00
65,138.43
87,048.43
1,318.92
Total Costo
8,448.00
17,160.00
25,608.00
0.00
25,608.00
388.00
16,732.98
2,613.69
19,346.67
2,321.59
21,668.26
21,668.26
1,430,104.97
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
4.80
5.00
50
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19,183.04
76,732.18
0.00
95,915.22
1,918.30
Total Costo
344,362.00
538,066.00
0.00
0.00
0.00
0.00
0.00
959.15
883,387.15
17,667.74
Total Costo
0.00
26,534.00
13,267.00
0.00
0.00
0.00
39,801.00
118,328.37
158,129.37
3,162.59
Total Costo
15,346.44
31,172.45
46,518.88
0.00
46,518.88
930.38
23,679.01
3,698.66
27,377.67
3,285.33
30,663.01
30,663.01
1,533,150.27
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.78
2.88
65
Costo/Total
0.00
0.00
604,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
604,500.00
9,300.00
Total Costo
778,140.00
0.00
0.00
0.00
0.00
0.00
0.00
778,140.00
11,971.38
Total Costo
29,979.00
0.00
0.00
0.00
0.00
0.00
0.00
29,979.00
89,127.57
119,106.57
1,832.41
Total Costo
11,559.21
23,479.64
35,038.84
0.00
35,038.84
539.06
23,642.85
3,693.01
27,335.87
3,280.30
30,616.17
30,616.17
1,990,051.04
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
1.45
11.05
150
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,375.54
69,502.17
0.00
86,877.71
579.18
Total Costo
467,873.00
182,763.00
0.00
0.00
0.00
0.00
0.00
650,636.00
4,337.57
Total Costo
18,026.00
18,026.00
0.00
0.00
0.00
0.00
0.00
36,052.00
107,182.60
143,234.60
954.90
Total Costo
13,900.43
28,235.26
42,135.69
0.00
42,135.69
280.90
6,152.56
961.03
7,113.59
853.63
7,967.22
7,967.22
1,195,083.10
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
1.25
12.80
150
Costo/Total
0.00
0.00
180,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
180,000.00
1,200.00
Total Costo
100,977.00
157,776.00
0.00
0.00
0.00
0.00
0.00
258,753.00
1,725.02
Total Costo
15,561.00
15,561.00
0.00
0.00
0.00
0.00
0.00
31,122.00
92,525.71
123,647.71
824.32
Total Costo
12,000.00
24,375.00
36,375.00
0.00
36,375.00
242.50
3,991.84
623.53
4,615.36
553.83
5,169.20
5,169.20
775,379.51
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.90
8.28
70
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16,240.00
64,960.00
0.00
81,200.00
1,160.00
Total Costo
72,883.00
113,879.00
0.00
0.00
0.00
0.00
0.00
812.00
187,574.00
2,679.63
Total Costo
0.00
22,463.00
11,232.00
0.00
0.00
0.00
33,695.00
100,175.24
133,870.24
1,912.43
Total Costo
12,992.00
26,390.00
39,382.00
0.00
39,382.00
562.60
6,314.66
986.35
7,301.01
876.12
8,177.13
8,177.13
572,399.22
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
19.41
3.50
10
Costo/Total
0.00
0.00
125,000.00
0.00
0.00
0.00
0.00
15,525.53
62,102.13
0.00
202,627.67
20,262.77
Total Costo
98,366.00
7,377.00
0.00
338,135.00
0.00
0.00
0.00
776.28
444,654.28
44,465.43
Total Costo
1,895.00
7,579.00
15,159.00
3,790.00
1,895.00
1,895.00
0.00
32,213.00
95,769.25
127,982.25
12,798.22
Total Costo
12,420.43
25,228.99
37,649.42
0.00
37,649.42
3,764.94
81,291.36
12,697.71
93,989.07
11,278.74
105,267.81
105,267.81
1,052,678.10
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
0.22
527.42
572
Costo/Total
0.00
0.00
112,500.00
250,000.00
0.00
0.00
0.00
10,064.43
40,257.73
0.00
412,822.17
721.72
Total Costo
18,690.00
29,203.00
0.00
0.00
0.00
0.00
0.00
503.22
48,396.22
84.61
Total Costo
720.00
8,641.00
11,521.00
0.00
0.00
0.00
0.00
20,882.00
62,082.19
82,964.19
145.04
Total Costo
8,051.55
16,354.70
24,406.25
0.00
24,406.25
42.67
994.04
155.27
1,149.30
137.92
1,287.22
1,287.22
736,290.69
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
4.42
13.58
11
Costo/Total
0.00
23,000.00
75,200.00
50,000.00
100,000.00
260,000.00
0.00
3,889.36
15,557.46
0.00
527,646.82
47,967.89
Total Costo
27,928.00
21,819.00
30,022.00
15,011.00
0.00
0.00
0.00
194.47
94,974.47
8,634.04
Total Costo
0.00
538.00
4,304.00
1,076.00
2,152.00
0.00
0.00
0.00
8,070.00
23,992.11
32,062.11
2,914.74
Total Costo
3,111.49
6,320.22
9,431.71
0.00
9,431.71
857.43
60,374.10
9,430.43
69,804.54
8,376.58
78,181.12
78,181.12
859,992.32
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
2.10
51.43
100
Costo/Total
10,200.00
46,000.00
75,200.00
62,500.00
75,000.00
16,250.00
7,500.00
16,800.00
67,200.00
0.00
376,650.00
3,766.50
Total Costo
16,755.00
52,358.00
36,022.00
18,011.00
71,207.00
0.00
0.00
840.00
195,193.00
1,951.93
Total Costo
0.00
1,291.00
10,328.00
2,582.00
5,164.00
5,164.00
5,164.00
5,164.00
34,857.00
103,629.86
138,486.86
1,384.87
Total Costo
13,440.00
27,300.00
40,740.00
0.00
40,740.00
407.40
7,510.70
1,173.17
8,683.87
1,042.06
9,725.93
9,725.93
972,593.41
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
21.51
5.02
3
Costo/Total
15,000.00
10,200.00
165,600.00
25,500.00
0.00
75,200.00
0.00
5,162.70
20,650.80
0.00
317,313.50
105,771.17
Total Costo
20,595.00
1,866.00
11,070.00
5,535.00
43,764.00
0.00
0.00
258.13
83,088.13
27,696.04
Total Costo
397.00
3,174.00
793.00
1,587.00
1,587.00
1,587.00
1,587.00
10,712.00
31,846.78
42,558.78
14,186.26
Total Costo
4,130.16
8,389.39
12,519.55
0.00
12,519.55
4,173.18
151,826.65
23,715.32
175,541.97
21,064.96
196,606.93
196,606.93
589,820.79
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
15.06
3.19
8
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9,637.03
38,548.11
0.00
48,185.14
6,023.14
Total Costo
86,499.00
135,155.00
0.00
0.00
0.00
0.00
0.00
481.85
222,135.85
27,766.98
Total Costo
3,333.00
6,665.00
3,333.00
6,665.00
0.00
0.00
19,996.00
59,448.11
79,444.11
9,930.51
Total Costo
7,709.62
15,660.17
23,369.79
0.00
23,369.79
2,921.22
46,641.86
7,285.46
53,927.32
6,471.29
60,398.61
60,398.61
483,188.88
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
7.84
6.12
130
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81,536.00
326,144.00
0.00
407,680.00
3,136.00
Total Costo
731,843.00
285,876.00
0.00
0.00
0.00
0.00
0.00
4,076.80
1,021,795.80
7,859.97
Total Costo
28,195.00
56,391.00
28,195.00
56,391.00
0.00
0.00
169,172.00
502,948.36
672,120.36
5,170.16
Total Costo
65,228.80
132,496.00
197,724.80
0.00
197,724.80
1,520.96
17,687.08
2,762.72
20,449.81
2,453.98
22,903.78
22,903.78
2,977,491.88
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
28.23
1.70
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18,069.66
72,278.64
0.00
90,348.30
11,293.54
Total Costo
162,188.00
253,418.00
0.00
0.00
0.00
0.00
0.00
903.48
416,509.48
52,063.69
Total Costo
6,249.00
12,497.00
6,249.00
12,497.00
0.00
0.00
37,492.00
111,463.72
148,955.72
18,619.46
Total Costo
14,455.73
29,363.20
43,818.92
0.00
43,818.92
5,477.37
87,454.05
13,660.32
101,114.38
12,133.69
113,248.06
113,248.06
905,984.49
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
55.00
2.91
1000
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,400,000.00
17,600,000.00
0.00
22,000,000.00
22,000.00
Total Costo
11,847,923.00
11,107,428.00
18,512,380.00
331,741,850.00
2,369,585.00
0.00
0.00
220,000.00
375,799,166.00
375,799.17
Total Costo
5,477,515.00
1,825,838.00
1,825,838.00
0.00
0.00
0.00
0.00
9,129,191.00
27,141,084.84
36,270,275.84
36,270.28
Total Costo
3,520,000.00
7,150,000.00
10,670,000.00
0.00
10,670,000.00
10,670.00
444,739.44
69,468.30
514,207.74
61,704.93
575,912.67
575,912.67
575,912,671.78
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
110.00
0.36
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,800.00
211,200.00
0.00
264,000.00
44,000.00
Total Costo
85,305.00
710,875.00
127,247.00
568,700.00
0.00
0.00
0.00
2,640.00
1,494,767.00
249,127.83
Total Costo
21,910.00
43,820.00
43,820.00
0.00
0.00
0.00
0.00
109,550.00
325,692.15
435,242.15
72,540.36
Total Costo
42,240.00
85,800.00
128,040.00
0.00
128,040.00
21,340.00
387,008.19
60,450.68
447,458.87
53,694.99
501,153.87
501,153.87
3,006,923.19
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
19.90
2.61
11
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,515.10
70,060.41
0.00
87,575.52
7,961.41
Total Costo
145,117.00
226,746.00
0.00
0.00
0.00
0.00
0.00
875.76
372,738.76
33,885.34
Total Costo
22,363.00
2,795.00
11,182.00
0.00
0.00
0.00
0.00
36,340.00
108,038.82
144,378.82
13,125.35
Total Costo
14,012.08
28,462.04
42,474.13
0.00
42,474.13
3,861.28
58,833.38
9,189.77
68,023.16
8,162.76
76,185.92
76,185.92
838,045.09
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
0.33
157.58
3300
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
87,120.00
348,480.00
0.00
435,600.00
132.00
Total Costo
721,812.00
1,127,831.00
0.00
0.00
0.00
0.00
0.00
4,356.00
1,853,999.00
561.82
Total Costo
111,236.00
13,904.00
55,618.00
0.00
0.00
0.00
0.00
180,758.00
537,393.53
718,151.53
217.62
Total Costo
69,696.00
141,570.00
211,266.00
0.00
211,266.00
64.02
975.46
152.37
1,127.83
135.34
1,263.17
1,263.17
4,168,446.15
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
0.28
185.71
3300
Costo/Total
0.00
0.00
12,350.00
0.00
0.00
0.00
0.00
73,920.00
295,680.00
0.00
381,950.00
115.74
Total Costo
612,446.00
956,948.00
0.00
0.00
0.00
0.00
0.00
3,696.00
1,573,090.00
476.69
Total Costo
94,382.00
11,798.00
47,191.00
0.00
0.00
0.00
0.00
153,371.00
455,971.98
609,342.98
184.65
609,527.63
184.71
Total Costo
59,136.00
120,120.00
179,256.00
0.00
179,256.00
54.32
831.46
129.87
961.34
115.36
1,076.70
1,076.70
3,553,097.95
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
0.45
80.00
900
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32,400.00
129,600.00
0.00
162,000.00
180.00
Total Costo
387,750.00
605,860.00
0.00
0.00
0.00
0.00
0.00
1,620.00
995,230.00
1,105.81
Total Costo
59,755.00
7,469.00
0.00
0.00
0.00
0.00
0.00
67,224.00
199,856.95
267,080.95
296.76
267,377.71
297.09
Total Costo
25,920.00
52,650.00
78,570.00
0.00
78,570.00
87.30
1,670.20
260.88
1,931.08
231.73
2,162.81
2,162.81
1,946,530.95
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
1.00
36.00
124
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
9,920.00
39,680.00
0.00
49,600.00
400.00
Total Costo
118,719.00
92,749.00
0.00
0.00
0.00
0.00
0.00
496.00
211,964.00
1,709.39
Total Costo
18,295.00
2,287.00
0.00
0.00
0.00
0.00
0.00
20,582.00
61,190.29
81,772.29
659.45
82,431.74
664.77
Total Costo
7,936.00
16,120.00
24,056.00
0.00
24,056.00
194.00
2,968.16
463.63
3,431.79
411.81
3,843.60
3,843.60
476,606.39
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
1.00
36.00
760
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60,800.00
243,200.00
0.00
304,000.00
400.00
Total Costo
727,630.00
284,230.00
0.00
0.00
0.00
0.00
0.00
3,040.00
1,014,900.00
1,335.39
Total Costo
112,132.00
14,017.00
0.00
0.00
0.00
0.00
0.00
126,149.00
375,040.98
501,189.98
659.46
501,849.44
660.33
Total Costo
48,640.00
98,800.00
147,440.00
0.00
147,440.00
194.00
2,589.72
404.51
2,994.24
359.31
3,353.55
3,353.55
2,548,695.10
1.50
34.67
124
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
14,880.00
59,520.00
0.00
74,400.00
600.00
Total Costo
123,285.00
192,632.00
0.00
0.00
0.00
0.00
0.00
744.00
316,661.00
2,553.72
Total Costo
18,999.00
2,375.00
9,499.00
0.00
0.00
0.00
0.00
30,873.00
91,785.43
122,658.43
989.18
123,647.61
997.16
Total Costo
11,904.00
24,180.00
36,084.00
0.00
36,084.00
291.00
4,441.88
693.82
5,135.70
616.28
5,751.98
5,751.98
713,245.59
2/21/2017
E ESTACIONES DE BOMBAS, BARRERAS DE CONTENCIN EN LNEAS COSTERAS E INSPECCIN Y MANTENIMIENTO
E LAS BOYAS DEL CENTRO DE REFINACIN PARAGUAN"
11.50
4.52
30
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
27,600.00
110,400.00
0.00
138,000.00
4,600.00
Total Costo
228,673.00
178,651.00
0.00
0.00
0.00
0.00
0.00
1,380.00
408,704.00
13,623.47
Total Costo
35,240.00
4,405.00
17,620.00
0.00
0.00
0.00
0.00
57,265.00
170,248.85
227,513.85
7,583.79
Total Costo
22,080.00
44,850.00
66,930.00
0.00
66,930.00
2,231.00
28,038.26
4,379.58
32,417.84
3,890.14
36,307.98
36,307.98
1,089,239.35
10.20
3.53
30
Costo/Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24,480.00
97,920.00
0.00
122,400.00
4,080.00
Total Costo
292,967.00
457,761.00
0.00
0.00
0.00
0.00
0.00
1,224.00
751,952.00
25,065.07
Total Costo
22,574.00
5,644.00
22,574.00
0.00
0.00
0.00
0.00
50,792.00
151,004.62
201,796.62
6,726.55
Total Costo
19,584.00
39,780.00
59,364.00
0.00
59,364.00
1,978.80
37,850.42
5,912.24
43,762.66
5,251.51
49,014.16
TABULADOR SALARIAL
NOMINA DIARIA
508.00 254,000.00
1.10 550.00
1.50 750.00
15.60 7,800.00
38.93 19,463.33
5.90 2,950.00
130.00 65,000.00
2.53 1,265.12
70.00 35,000.00
500.00 250,000.00
56.00 28,000.00
7.00 3,500.00
102.00 51,000.00
8.00 4,000.00
24.00 12,000.00
32.00 16,000.00
64.00 32,000.00
82.00 41,000.00
30.00 15,000.00
44.00 22,000.00
54.00 27,000.00
13.00 6,500.00
1.17 585.00
1.30 650.00
3.00 1,500.00
29.00 14,500.00
37.00 18,500.00
270.00 135,000.00
308.00 154,000.00
170.00 85,000.00
20.00 10,000.00
970.00 485,000.00
1,048.00 524,000.00
32.00 16,000.00
38.00 19,000.00
199.00 99,500.00
70.00 35,000.00
110.00 55,000.00
130.00 65,000.00
156.00 78,000.00
167.00 83,500.00
250.00 125,000.00
Factor 2
MAT_ P.U
330.00 165,000.00
0.49 245.18
24.00 12,000.00
36.00 18,000.00
5.30 2,650.00
-
-
-
-
25.00 12,500.00
13.70 6,850.00
7.00 3,500.00
12.60 6,300.00
24.40 12,200.00
6.00 3,000.00
2.60 1,300.00
8.80 4,400.00
3.80 1,900.00
2.20 1,100.00
1.36 680.00
1.05 525.00
3.40 1,700.00
4.20 2,100.00
13.60 6,800.00
6.00 3,000.00
7.00 3,500.00
9.00 4,500.00
7.00 3,500.00
19.00 9,500.00
40.00 20,000.00
14.60 7,300.00
30.00 15,000.00
24.00 12,000.00
8.00 4,000.00
15.00 7,500.00
30.00 15,000.00
520.00 260,000.00
50.00 25,000.00
10.00 5,000.00
130.00 65,000.00
1,100.00 550,000.00
Factor 2
MAT_ P.U
11.40 5,700.00
17.00 8,500.00
7.90 3,950.00
92.40 46,200.00
2.50 1,250.00
208.00 104,000.00
265.00 132,500.00
460.00 230,000.00
330.00 165,000.00
2.42 1,210.00
1.04 520.00
3.60 1,800.00
1.90 950.00
4.40 2,200.00
-
-
13.70 6,850.00
15.70 7,850.00
9.00 4,500.00
6.20 3,100.00
16.00 8,000.00
1.98 990.00
1.40 700.00
7.00 3,500.00
29.00 14,500.00
64.00 32,000.00
930.00 465,000.00
570.00 285,000.00
691.60 345,800.00
17.00 8,500.00
3.85 1,923.08
110.00 55,000.00
24.00 12,000.00
70.00 35,000.00
50.00 25,000.00
16.00 8,000.00
17.00 8,500.00
31.60 15,800.00
60.00 30,000.00
1.60 800.00
308.00 154,000.00
2.80 1,400.00
8.00 4,000.00
500.00 250,000.00
Factor 2
MAT_ P.U
500.00 250,000.00
300.00 150,000.00
140.00 70,000.00
5.00 2,500.00
6.90 3,450.00
6.20 3,100.00
370.00 185,000.00
470.90 235,450.00
13.60 6,800.00
370.00 185,000.00
97.00 48,500.00
48.00 24,000.00
110.00 55,000.00
22.00 11,000.00
480.00 240,000.00
140.00 70,000.00
53.00 26,500.00
800.00 400,000.00
90.00 45,000.00
136.00 68,000.00
0.10 48.00
0.14 70.00
500.00 250,000.00
2.80 1,400.00
59.00 29,500.00
130.00 65,000.00
156.00 78,000.00
91.60 45,800.00
30.80 15,400.00
10.40 5,200.00
6.60 3,300.00
28.00 14,000.00
140.02 70,008.75
50.00 25,000.00
20.00 10,000.00
25.00 12,500.00
37.00 18,500.00
44.00 22,000.00
70.00 35,000.00
80.00 40,000.00
308.00 154,000.00
420.00 210,000.00
Factor 2
MAT_ P.U
162.00 81,000.00
250.00 125,000.00
708.00 354,000.00
487.00 243,500.00
348.00 174,000.00
264.00 132,000.00
290.00 145,000.00
188.00 94,000.00
167.00 83,500.00
116.80 58,400.00
1,300.00 650,000.00
1.60 800.00
1.80 900.00
520.00 260,000.00
3.10 1,550.00
48.00 24,000.00
5.00 2,500.00
6.80 3,400.00
308.00 154,000.00
3.00 1,500.00
1.60 800.00
130.00 65,000.00
100.00 50,000.00
0.54 270.00
16.00 8,000.00
1,370.00 685,000.00
264.00 132,000.00
136.00 68,000.00
10.80 5,400.00
17.00 8,500.00
56.00 28,000.00
14.00 7,000.00
3.60 1,800.00
42.00 21,000.00
131.60 65,800.00
112.00 56,000.00
60.00 30,000.00
130.00 65,000.00
156.00 78,000.00
50.00 25,000.00
350.00 175,000.00
Factor 2
MAT_ P.U
140.00 70,000.00
70.00 35,000.00
749.00 374,500.00
592.00 296,000.00
3.50 1,750.00
5.00 2,500.00
1.30 650.00
105.60 52,800.00
300.00 150,000.00
690.00 345,000.00
628.00 314,000.00
570.00 285,000.00
480.00 240,000.00
402.00 201,000.00
350.00 175,000.00
59.62 29,808.00
74.52 37,260.00
22.36 11,178.00
89.42 44,712.00
104.33 52,164.00
44.71 22,356.00
7.00 3,500.00
3.60 1,800.00
3.00 1,500.00
1.72 860.00
1.10 550.00
90.00 45,000.00
348.00 174,000.00
390.00 195,000.00
-
50,000.00 25,000,000.00
110.00 55,000.00
36.00 18,000.00
32.00 16,000.00
56.80 28,400.00
10.80 5,400.00
6.20 3,100.00
5.80 2,900.00
4.48 2,240.00
1.80 900.00
1.09 545.00
Factor 2
MAT_ P.U
30.00 15,000.00
1.30 650.00
1.90 950.00
3.00 1,500.00
70.00 35,000.00
130.90 65,450.00
0.90 450.00
2.80 1,400.00
-
1.20 600.00
1.68 840.00
30.00 15,000.00
47.00 23,500.00
13.00 6,500.00
6.90 3,450.00
0.90 450.00
0.84 420.00
19.00 9,500.00
22.80 11,400.00
13.00 6,500.00
4.82 2,410.00
13.00 6,500.00
10.90 5,450.00
7.00 3,500.00
26.00 13,000.00
16.80 8,400.00
9.00 4,500.00
34.00 17,000.00
56.00 28,000.00
13.00 6,500.00
77.00 38,500.00
22.00 11,000.00
19.00 9,500.00
14.90 7,450.00
37.00 18,500.00
30.80 15,400.00
56.00 28,000.00
16.25 8,125.00
73.00 36,500.00
39.80 19,900.00
9.10 4,550.00
46.00 23,000.00
-
Factor 2
MAT_ P.U
9.40 4,700.00
12.60 6,300.00
11.40 5,700.00
5.60 2,800.00
8.40 4,200.00
15.00 7,500.00
1.05 525.00
508.00 254,000.00
198.00 99,000.00
24.00 12,000.00
50.00 25,000.00
120.00 60,000.00
57.00 28,500.00
30.00 15,000.00
154.00 77,000.00
198.00 99,000.00
37.00 18,500.00
240.00 120,000.00
24.00 12,000.00
270.00 135,000.00
710.00 355,000.00
260.00 130,000.00
430.00 215,000.00
Suministro vigas metlicas tales como : UPN-140, angulos L2x2x1/4,
L21/2X21/2X1/4, planchas de 3/8, L4x 4 x 3/8, pletinas de 3x3/8, cabillas
3/8, planchas de . pernos de conexin A-325 de 5/8 y/o galvanizados en
caliente.
Suministro de pernos 5/8x 2 X2 con tuercas y arandela galvanizados
caliente A-325 .
laminas de fibrocemento onduladas y ganchos de 1/4x10
canales de fibrocemento , ganchos de 1/4x10
laminas de laminas translucidas color verde onduladas
ganchos de fijacin de 5/16 x 10 galvanizados,
Fondo Epxi modificado, Epxi Poliamida,
Resina Isoftlica reforzada con Fibra de Vidrio
Reparacin de bajantes de Canales de Agua de Lluvia por medio de Resina
Isoftlica Reforzada de e= 8 mm; Esta Partida incluye la Limpieza de todo
residuo de polvo, etc. existente en la tubera.
ngulos de 3X3X7mm esp, Angulo de 11/2X11/2x7mm, ngulos 1X1 X 4mm,
ngulos 2X2X7mm Galvanizados
Malla Electrosoldada de 4 x 4 TRUKSON.
Tubera de 4 e= 10mm para bajantes de canales de drenaje. codos/Bajante de
4 de 45 y tres (3) abrazaderas/Bajante de flejes para fijacin del tubo igual al
existente.
BELZONA MOLECULAR
PACAS DE REDES CAMARONERAS, VERDE, SIN NUDO, DE HILO DE 12 X 100 X 400M ALLAS DE 38 KG
BOYAS BARRILITO N 7
ROLLOS DE MECATE DE 3/8" (10,2kG)
PINTURA EPOXICA MARINA
PINTURA ANTIVEGETATIVA
ARENA SILICE
FIBRA DE VIDRIO
PINTURA DE FONDO
PINTURA EPOXICA
ANTIFOULING
BATERIAS
GRILLETES
GRILLETES SWIVELS