Building Element/System: D40 Fire Protection Systems


Category: D4010.15330 Wet Pipe Fire Sprinkler System
Items to be Inspected: Pipes and Fittings, Branchlines, Crossmains, Feedmains, Risers

Date Inspected:
Supplier:
Location:

Non - Not Remarks / Due


Conform. N/A Open Close
ITEM / REQUIREMENT Conform. Avail. Corrective Actions Date

A SUBMITTALS:
A.1 Materials
1. Type :
2. Brand :
3. Origin :
4. Type of Joint
5. Conformance to applicable
standards
6. Brand and type marking on
pipe
7. Mill Certificate
A.2 Shopdrawings

B INSTALLATIONS:
Provision of pipe sleeves and
B.1
blockouts
B.2 Pipe shedule
Spacing of sprinkler head
B.3
stubouts
B.4 Sway braces
Spacing of hangers and
B.5
supports : _______
Leveling of branchlines and
B.6
crossmains
Plumbness of hangers and
B.7
supports
B.8 Pipe joints
b.8.1 Threaded
b.8.2 Compression (victaulic)
b.8.3 Welded
B.9 Provision of drain connection
B.10 Painting and labeling
Installation of Floor Control
B.11
Valve Assembly
Provision of drain connection
at Crossmain and Inspector
B.12
Test Connection at
Branchlines
Installation of Alarm Check
B.13
Valve Assembly at feedmains

DCI-QIC rev. 01 Page 1 of 2


QA/QC Inspection Checklist
design coordinates, inc. CP No. __________________
VECTOR THREE
Northgate, Cyberzone, Filinvest Corporate City,
Alabang, Muntinlupa City

Remarks /
Non - Not Due
Conform. N/A Corrective Open Close
ITEM / REQUIREMENT Conform. Avail. Date
Actions
Filler between pipe sleeves
B.14
and pipes
b.14.1 Fire Rated
b.14.2 Non-fire Rated
b.14.3 In accordance with
approved submittal
B.15 Cleaning (flushing)
b.2.7 Is the dying agent
removed from the pump
when returned to
service?
C TESTING:

C.1 Hydrostatic Pressure Test


C.2 Flow Test
C.3 Other Tests

General Notes, Comments and Recommendations:

Inspected by : Noted by : Concurred by :

________________________________ ___________________________________ ________________________________


Construction Project Engineer / Architect Construction Project Manager Supplier

Distribution:

Supplier Customer/ Developer DCI File

Note: A separate Notice to Comply (DCI-NTC) can be issued to the supplier/contractor if the non-conforming item may
take time to rectify and complete.

DCI-QIC rev. 01 Page 2 of 2

Você também pode gostar