DISTRIBUTION KEY

Distribution key can be used to split:

- Depreq & ordrest> place in BOM


- PIR > place in BOM or ref key

Parameter distribution key in BOM

Planned Order
Depreq is split in days from 10.04 to 17.04
Planned order is converted into prod order
Distribution key for component consumption
Determines the split to be used for distributing the run schedule quantity (into partial quantities) over the
validity period of the planned order or the production order. In so doing, the relationship between time and
the consumption of components is established.

Use
This means that the MRP controller can plan a daily supply of partial quantities (distributed over the validity
period of the RS header) for repetitive manufacturing.

config