Você está na página 1de 4
TANK FARM & ASSOCIATED WORKS PROJECT MALIGAS SIMALUNGUN - NORTH SUMATERA, [Doc. No: PLMB-UOI-160026-ITP-007 INSPECTION AND TEST PLAN Rev.No :0 Page _: 01 Of 03 MAJU BERSAMA CLIENT : PT. UNILEVER OLEOCHEMICAL INDONESIA, TITLE : STORAGE TANK 1500 MT PROJECT NAME : TANK FARM & ASSOCIATED WORKS PROJECT LOCATION : SEI MANGKEI, MALIGAS SIMALUNGUN - NORTH SUMATERA JOB NO : 160026 0 31-Mel-16 Issued For Construction ‘Wat $ =e D 05-Apr-16 Issued For Approval ¢ OF -AprA6 Issued For Approval 5 24-Feb-A6 issued For Approval A. 15-Feb-16 issued For Approval RGA_[AR. DI R DATE DESCRIPTION Propd | Checkd | Appra | Client as INSPECTION AND TEST PLAN (ITP ) Oniteame DET ESTO OOETERT Fist ere By Taare ev a Pu FREER a #1 VOL Cusoner FT _UNLEVER OLEOCHEMIGAT HOOWEST Propet Tile STORAGE TANK 100. SbuSPPR No. = a00as dee Tose Tag No = INSPECTION ACTIVITES, SION AND DATE al remacrwnes REFERENCE oocuNent | ACCEPTANCE verrying | epart| pu PRAPANCA RP vor camer | oocumenrimeronr | nvoLvE| car SRE ar | SE car] SNE oa] S| DATE DATE DATE DATE “9 [SECTION + (Before anutacurng) 1 [sign Engineering Revew _ oe | Speareaton t Spec, Rea, Standard ite! acaason Shorseontnaob2)" | ames — | APmaLOmBan Spe | cag | R RA 8 | Drawing (General Arrangement Tender Docunert ae |: Stop OreungsCuting Scheme abcaon raving 12 WES aiteaions FOR "ASME Seek APIEED Cromreiargep | ASMEsECK | Arporeewrsiran | mod | M RA R RA 3 [ver Goaetar Awe sec, WS. awe] Pr apace ‘ASME SECIK wear ee | PA swa 7] Raw ara! Resa apesion | Pie (Shel, Tp. Boton) | Pipe tor Note Farge for Nozle ue | Ete Popomicentene, | Ase seca | Maio! Tacoatiy “ ww. na Gasket raving. Tolerance, SOP Report amit ceniteate| oC 15 Revita cereale Of ae | Visual & Dmensona Check OFMteal | Review mi Cosine Weng Corsunable TH [ang Cang Forng, Davina, Grog & alg |: Pit or Sel: Botom Top | ange | Piper Nazi & Neck - ema! Pipe en Spec seve eaesrrae Drawing, Cuts Pa, Drewing | wanting cutng pian | ac | minia RA RA |: Rect Pate “Mento cong, Coon apres Roar Seuese Intra’ Exel Suppor atl & Dienst! Check 2.0 [SECTION 2 (During Manufacturing ) 25 |rtup Crock sual & Dimensional beer weldng) ~ [ain Tene Tecvors Drang, Wels Map, ‘aries | Weling contoi Recor] P4 | quran RA RA c Nase Trace, WP | sro tow atom gt Page 10f 3 as INSPECTION AND TEST PLAN (ITP) . nthe Dae Ne PEDO TESOSTTE DOT Prepared 5, Reviewed 8, Appives By ew. @ PLE PRAPANCA Re PT vor Custer PT UNREVER OLE OGHEWICAL NOGRES Project Tite ‘STORAGE TANK 1500 MT JobSISPPR No “Te0008. Date Syste Tag NO. = jane INSPECTION ACTIVITIES, SIGN AND DATE ACCEPTANCE verrvine | DEPART PLME PRAPANCA RIP vot No. Tremactivmes REFERENCE DOCUMENT | ACGEFTANCE | | VERIFYING ST RVOLVE cat | SONET cat | SORE | car alike DATE DATE DATE DATE varce;tibe Lovins, Contarpoint Paawing: Teaco, ert ‘APls0 Flatess & Orentaton | Prod | WRIA RA RA oct Report 3 [visual Choc tr walang foreach pars [Assved Drawing, Wels 8 jai MP] aptoso Wecing ConvoiRecos| ac | MRA RA RA 24 [Non Destuete Test (NDE) 24 3]RT 10% Fer aera Cos 124 2}P7 For But Joint Annu To Annular (Backing Sip) 100% ‘erica Jit A 20% Intesecton Jt (T-i AL 40% Manne al Vile 40% | dit Reet Te Reo 109% Pr For Lap Joint ‘Annuar To Botem Plate 20% P1850 Drawing, SOP ‘Batm To Beton 20% ‘APL650 ASME SEC V NOE report oc | m RA R ASME SEC 124 2)PT For Filet ont Wee Renformance Pad To Bctom Pate 100% | bran sump 100% | Jn Root Strocture Te Root 10% | Sint Reinfrmance Pad Te Roo! 40% ‘ort Raiformanee To Neck 100% ‘ort Neck Manrot 100% [24.s}NDE Operetor 75 |Fil Viual & Dimaneibal Cheek Daina Elevation Leveing AnutarBetor Tank apiss0 apies0 Dimensional Check |. Piumoness. Rounds, & Peaking bending Repos oo] M 8 A R orieemuanos Paezet 3 INSPECTION AND TEST PLAN (ITP ) tndaoer Dan FE DO ROSTEST Fra Rema ewe Rew a a PRAPANTA a UO} Conamer FL UNTEVER OLEOCHERICAT ROORESA Proce Te STORAGE TANK 1500 Scouserm no, etme ee piece TaaNo. 7 Heer. TRSPESTION ACTMTIES, SGN AND DATE Accerrance verrvnc — |osrarr| Pima PRAPANCA RiP v3 No rreM acrivmies ererence vocuvent | ACCEPTANCE | | VERIFYING | DEPART Sr SET Say] SNE} TEE | care DATE DATE: one To [SECTIONS 35 nero rst, ol | Prom Fe neal Cot tensor Dawg ut | apres ryoromaeTetRepon | Prod | Ft wat or Tank &Santaret Ever 1 Course IRiterrestResot” | ‘ae 2.2 Vooum Tet Fr tino Bote 10% [vacuo Text Reson » wr we Vaeuom Fest ar Aas To Arar 00% | acu Tet For Rerforance Pa To bata 10% [Vacuum Tat Per nar To ton Pate 1% 32 ae fr eant Cian Spee raving. SOP | cient Spec Drang, | Piesing & Paton gor pos 37 ag ioe eee cian Spec Drang Pani} cient Soue Drawing, | Pang Report i ® im soe Prod Pane ian RE rawr BOF] Toe DANTE | —PunETTReeT | OC Sor 2:5 |Manutetsra Osta Repo (HOR) lem spest Davina | cen: Sone oR em | om R R ® Coma oe ate: abbreviation 1 Simpl operation mus be sgn anda, «PLM = Povarea Langgeng Maj Sarat W = Wines Uol = PT Uniever Oeseremicalindonese R= Revaw Occumert nine seealianss Pageaot 3

Você também pode gostar