Você está na página 1de 5

Item Descripcin Und. Metrado Precio (S/.) Parcial (S/.

)
01 OBRAS PROVISIONALES 4,937.46
01.01 CARTEL DE IDENTIFICACION DE OBRA 5.40 X 3.60 M und 1.00 797.70 797.70
01.02 ALMACEN, OFICINA Y CASETA DE GUARDIANA glb 1.00 1,000.00 1,000.00
01.03 MANTENIMIENTO DE TRANSITO mes 2.00 1,569.88 3,139.76
02 TRABAJOS PRELIMINARES 7,926.51
02.01 TRAZO, NIVELACION PERMANENTE Y REPLANTEO FINAL m2 1,890.71 1.20 2,268.85
02.02 DEMOLICIN DE VEREDAS EXISTENTES m2 646.59 8.75 5,657.66
03 VEREDAS 180,236.63
03.01 MOVIMIENTO DE TIERRAS 31,300.64
03.01.01 CORTE SUPERFICIAL MANUAL HASTA H = 0.10M m3 223.52 25.09 5,608.12
03.01.02 PREPARACIN DE SUBRASANTE PARA VEREDAS C/PLANCHA m2 1,890.71 3.62 6,844.37
03.01.03 AFIRMADO E = 4" COMPACTADO PARA VEREDAS m2 1,890.71 8.06 15,239.12
03.01.04 ELIMINACIN DE MATERIAL EXCEDENTE C/VOLQUETE 15M3 DM= m3 358.75 10.06 3,609.03
03.02 OBRAS DE CONCRETO SIMPLE 142,334.57
VEREDA DE CONCRETO FC=175kg/cm2 E=4" ACAB.
03.02.01 FROTACHADO, BRUNAD. INC/VACIADO, REGLADO, CURADO, m2 1,869.11 51.70 96,632.99
ENCOFRADO Y DESENCOFRADO 1:2
RAMPA DE CONCRETO FC= 175KG/CM2 E=4" ACAB.FROCHADO,
BRUNAD.INC/VACIADO,REGLADO, CURADO,
03.02.02 ENCOFRADO Y DESENCOFRADO 1:2 m2 21.60 49.23 1,063.37
SARDINEL SUMERGIDO CONCRETO FC=175KG/CM(0.10X0.20)
PARA VEREDASCURADO,
03.02.03 ENCOFRADO Y DESENCOFRADO 1:2 m 1,262.75 35.35 44,638.21

03.03 JUNTAS 3,411.71


03.03.01 JUNTAS ASFALTICAS m 478.50 7.13 3,411.71
03.04 OTROS 3,189.71
03.04.01 PINTURA DE VEREDAS m2 252.55 12.63 3,189.71
04 SEGURIDAD Y SALUD LABORAL 3,563.30
04.01 EQUIPAMIENTO DE PROTECCION INDIVIDUAL glb 1.00 3,563.30 3,563.30
ITEM DESCRPCION UND METRADO P. UNIT. S/.

"MEJORAMIENTO E IMPLEMENTACION DE LOS SERVICIOS DEL


CAMAL MUNICIPAL DEL DISTRITO DE HUARMEY, PROVINCIA DE
HUARMEY- ANCASH"(I ETAPA)
OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
COLUMNAS
VIGAS
LOSA MACIZA
CISTERNA
TANQUE SEPTICO
CAMARAS DE REJAS
ALBAILERIA
ESTRUCTURA METALICA
SEGURIDAD EN OBRA Y MITIGACION AMBIENTAL
REVOQUES , ENLUCIDOS Y MOLDURAS
PISOS Y PAVIMENTOS
CARPINTERIA METALICA
INSTALACIONES SANITARIAS
MOVIMIENTO DE TIERRAS
TUBERIAS
TUBERIA DE AGUA FRIA
TUBERIA DE DESAGUE Y VENTILACION
SALIDAS
SALIDAS DE AGUA
SALIDAS DE DESAGUE Y VENTILACION
ACCESORIOS
ACCESORIOS DE AGUA
ACCESORIOS DE DESAGUE
EQUIPAMIENTO
VARIOS
OTROS
MOVIMIENTO DE TIERRAS
CAJAS, DUCTOS
INSTALACIONES ELECTRICAS
TABLEROS Y CUCHILLAS
CONDUCTORES Y/O CABLES
SUMINISTRO E INSTALACIONES DE LUMINARIAS
VARIOS
POZO CONEXION A TIERRA EN SISTEMA C/ALUM.
TOMACORRIENTE

Costo Directo
Gastos Generales 10.00%
Utilidad 8.00%
Sub Total
Impuesto General a las Ventas 18.00%
Total Final
MES 1 MES 2
PARCIAL S/.
PARCIAL % PARCIAL %

2,825.00 2,825.00 100.00%


5,291.99 5,291.99 100.00%
8,281.16 8,281.16 100.00%
6,366.70 6,366.70 100.00%
23,923.35 23,923.35 100.00%
4,719.11
3,736.87
2,307.99
5,902.61
4,230.53
3,026.24
4,295.73 4,295.73 100.00%
11,888.31 11,888.31 100.00%
4,880.76 2,440.38 50.00% 2,440.38 50.00%
6,424.17 6,424.17 100.00%
17,596.76 17,596.76 100.00%
9,957.24 9,957.24 100.00%
8,469.56 8,469.56 100.00%
2,966.08
5,503.48
2,403.46
3,100.02
4,812.89 4,812.89 100.00%
1,749.34
3,063.55
7,375.89 7,375.89 100.00%
2,882.95
4,492.94
1,044.14 1,044.14 100.00%
5,701.76 5,701.76 100.00%
2,676.10 2,676.10 100.00%
198.89 198.89 100.00%
107.30 107.30 100.00%
1,535.80 1,535.80 100.00%
1,591.79 1,591.79 100.00%
5,226.22 5,226.22 100.00%
2,082.47 2,082.47 100.00%
1,087.65 1,087.65 100.00%

1,087.65

143,641.63 53,424.31 90,217.32


14,364.16 5,342.43 9,021.73
11,491.33 4,273.94 7,217.39
169,497.12 63,040.69 106,456.44
30,509.48 11,347.32 19,162.16
200,006.60 74,388.01 37.19% 125,618.60 62.81% 100% 200,006.60
CRONOGRAMA VALORIZADO DE OBRA
PROYECTO :"MEJORAMIENTO E IMPLEMENTACION DE LOS SERVICIOS DEL CAMAL MUNICIPAL DEL DISTRITO DE HUARMEY, PROVINCIA DE HUARMEY- ANCASH"(I ETAPA)
PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE HUARMEY PLAZO DE EJECUCIN : 60 DIAS CALENDARIO
UBICACIN :BUENOS AIRES DISTRITO: HUARMEY PROVINCIA: HUARMEY DEPARTEMAENTO: ANCASH

FECHA : JUNIO DEL 2016

MES 1 MES 2 TOTAL


ITEM DESCRPCION UND METRADO P. UNIT. S/. PARCIAL S/.
PARCIAL PARCIAL VALORIZADO
01.00.00 OBRAS PROVISIONALES 2,825.00 2,825.00 2,825.00
02.00.00 TRABAJOS PRELIMINARES 5,291.99 5,291.99 5,291.99
03.00.00 MOVIMIENTO DE TIERRAS 8,281.16 8,281.16 8,281.16
04.00.00 OBRAS DE CONCRETO SIMPLE 6,366.70 6,366.70 6,366.70
05.00.00 OBRAS DE CONCRETO ARMADO 23,923.35 23,923.35 23,923.35
05.01.00 COLUMNAS 4,719.11
05.02.00 VIGAS 3,736.87
05.03.00 LOSA MACIZA 2,307.99
05.04.00 CISTERNA 5,902.61
05.05.00 TANQUE SEPTICO 4,230.53
05.06.00 CAMARAS DE REJAS 3,026.24
06.00.00 ALBAILERIA 4,295.73 2,147.87 2,147.87 4,295.73
07.00.00 ESTRUCTURA METALICA 11,888.31 11,888.31 11,888.31
08.00.00 SEGURIDAD EN OBRA Y MITIGACION AMBIENTAL 4,880.76 2,440.38 2,440.38 4,880.76
01.00.00 REVOQUES , ENLUCIDOS Y MOLDURAS 6,424.17 6,424.17 6,424.17
02.00.00 PISOS Y PAVIMENTOS 17,596.76 17,596.76 17,596.76
03.00.00 CARPINTERIA METALICA 9,957.24 9,957.24 9,957.24
01.00.00 INSTALACIONES SANITARIAS 8,469.56 8,469.56 8,469.56
01.01.00 MOVIMIENTO DE TIERRAS 2,966.08
01.02.00 TUBERIAS 5,503.48
01.02.01 TUBERIA DE AGUA FRIA 2,403.46
01.02.02 TUBERIA DE DESAGUE Y VENTILACION 3,100.02
02.00.00 SALIDAS 4,812.89 4,812.89 4,812.89
02.01.00 SALIDAS DE AGUA 1,749.34
02.02.00 SALIDAS DE DESAGUE Y VENTILACION 3,063.55
03.00.00 ACCESORIOS 7,375.89 7,375.89 7,375.89
03.01.00 ACCESORIOS DE AGUA 2,882.95
03.02.00 ACCESORIOS DE DESAGUE 4,492.94
04.00.00 EQUIPAMIENTO 1,044.14 1,044.14 1,044.14
05.00.00 VARIOS 5,701.76 5,701.76 5,701.76
06.00.00 OTROS 2,676.10 2,676.10 2,676.10
01.00.00 MOVIMIENTO DE TIERRAS 198.89 198.89 198.89
02.00.00 CAJAS, DUCTOS 107.30 107.30 107.30
03.00.00 INSTALACIONES ELECTRICAS 1,535.80 1,535.80 1,535.80
04.00.00 TABLEROS Y CUCHILLAS 1,591.79 1,591.79 1,591.79
05.00.00 CONDUCTORES Y/O CABLES 5,226.22 5,226.22 5,226.22
06.00.00 SUMINISTRO E INSTALACIONES DE LUMINARIAS 2,082.47 2,082.47 2,082.47
07.00.00 VARIOS 1,087.65 1,087.65 1,087.65
POZO CONEXION A TIERRA EN SISTEMA C/ALUM.
07.01.00 1,087.65
TOMACORRIENTE

Costo Directo 6.6667E+134 143,641.63 51,276.45 92,365.18 143,641.63


Gastos Generales 10.00% 14,364.16 5,127.64 9,236.52 14,364.16
Utilidad 8.00% 11,491.33 4,102.12 7,389.21 11,491.33
Sub Total 169,497.12 60,506.21 108,990.91 169,497.12
Impuesto General a las Ventas 18.00% 30,509.48 10,891.12 19,618.36 30,509.48
Total Final 200,006.60 71,397.33 128,609.27 200,006.60
Porcentaje de avance 100% 35.70% 64.30% 100%
Porcentaje Acumuado 35.70% 100.00%

Você também pode gostar