1 Needs to be connected to Grid with Only Y N 1 Transformer (Say TRF -1)
When CPP is in Line and Power System
2 Needs to be connected to Grid with Only N Y 1 Transformer (Say TRF -2)
When CPP is not in Line and Power
3 System Needs to Connected to Grid Y N with Only 1 Transformer (Say TRF-1)
When CPP is not in Line and Power
4 System Needs to Connected to Grid N Y with Only 1 Transformer (Say TRF-2)
When CPP is not in Line and Power
System Needs to Connected to Grid 5 Y Y with Both the 1 Transformer ( TRF-1 & TRF-2) ARIO ANALYSIS OF POWER SYSTEM CPP TIE DG B/C Remarks Conclusion FEEDER - 2 CPP Needs to be synchronized with the Y N Y TRF-1 (Grid There needs to be VCB) selection criteria on which transformer CPP Needs to be needs to be synchronized with the Synchornized with Grid Y N Y TRF-2 (Grid VCB)
No Synchronization Dead Bus Charging
N N Y Needed Only
No Synchronization Dead Bus Charging
N N Y Needed Only
Synch Relay between 2
Synchronization Transformer and Tap N N Y Needed between 2 Changer to be kept at Transformer. Same Number