Você está na página 1de 2

SCENARIO ANALYSIS OF POWER SYS

Sr.No. Case-1 TRF-1 TRF-2

When CPP is in Line and Power System


1 Needs to be connected to Grid with Only Y N
1 Transformer (Say TRF -1)

When CPP is in Line and Power System


2 Needs to be connected to Grid with Only N Y
1 Transformer (Say TRF -2)

When CPP is not in Line and Power


3 System Needs to Connected to Grid Y N
with Only 1 Transformer (Say TRF-1)

When CPP is not in Line and Power


4 System Needs to Connected to Grid N Y
with Only 1 Transformer (Say TRF-2)

When CPP is not in Line and Power


System Needs to Connected to Grid
5 Y Y
with Both the 1 Transformer
( TRF-1 & TRF-2)
ARIO ANALYSIS OF POWER SYSTEM
CPP TIE
DG B/C Remarks Conclusion
FEEDER - 2
CPP Needs to be
synchronized with the
Y N Y
TRF-1 (Grid There needs to be
VCB) selection criteria on
which transformer
CPP Needs to be needs to be
synchronized with the Synchornized with Grid
Y N Y
TRF-2 (Grid
VCB)

No Synchronization Dead Bus Charging


N N Y
Needed Only

No Synchronization Dead Bus Charging


N N Y
Needed Only

Synch Relay between 2


Synchronization
Transformer and Tap
N N Y Needed between 2
Changer to be kept at
Transformer.
Same Number