Você está na página 1de 2

SIBCA ELECTRONIC EQUIPMENT CO LLC

P.O. BOX:19318, AL AIN UAE


Tel: 03 751 8080 Fax: 03 751 9280

Contractor Site Survey Report

Ref. No: SIBCA/CBS/00/04 Date: 18/11/2016

Client:Musanada Contractor Name:Sibca Electronic Equipment Co. LLC.


Project:Mezyad School Location:
Mezyad
System:Central Battery PC (BMS Room) Make/Model:

Contractor Representative Name: Contractor Representative


Sunil Kumar.T.K. Mobile No:971 566032549

Documentation Attached Attached? Total pages including this


Photos YES
02

Site Survey Description:


We Visited the Site& observed the following:-
Central Battery workstation PC was found in a switched off state.
The VGA cable connecting the workstation PC and desktop monitor is found missing.
After we turned ON the Workstation PC, access to Windows OS is found password locked

The details of the defects are as given in the following pages :-


SIBCA ELECTRONIC EQUIPMENT CO LLC
P.O. BOX:19318, AL AIN UAE
Tel: 03 751 8080 Fax: 03 751 9280

SNo. DEFECT NOTIFIED PROPOSED RECTIFICATION MEASURES

Central Battery workstation PC was found in a Central Battery Workstation PC to be kept as


switched off state. turned ON permanently.
1
The VGA cable connecting the workstation PC and VGA cable for connecting the PC with monitor to
monitor is found missing. be arranged

After turning ON the Workstation PC, access to Since PC OS password is unknown. Windows OS
Windows OS is found password locked. So we were to be reconfigured and Inotec program to be re-
unable to check the operational status of the Inotec installed if required. Also, the IP network
software program connectivity between the PC and the central battery
panels to be verified with ADEC IT team.

Prepared By:

Contractor Representative Signature.

Date:18/11/2016