T QFM-FSD-009-003
: aot APPLICATION FOR [Revo
oe 4 WATER CONNECTION Date: 03/14/13,
= Page 1 of 1
Field Support Department, Utilities Division, Water Network Section
REF. No DATE:
approv S Department — Engineering Divisi
11 P& ID approved 7 FSEMO) O ~
12 Pipeline Route approved FSENO0) O FSE2(0) Q
1.3 Layout Drawing of Metering Chamber approved FSEM0) 9 FSE200) Qs |
14 GA, Drawing & Bill of Materials approved FSEMD) Q FSE2(D) Q
1.5 Method Statement for Laving & Pressure Test approved FSEM(D) Q FSEI2D) 9
1.8 Pipeline Construction Inspected and approved FSEMD) O FSE/(D)
Checked: | Approved:
| SEI) SEO
| Date: Date:
UPSTREAM — METERING CABINET ~~
2.1 Method Statement for Flushing, Cleaning and Sterilization approved + FSU/3(D) 9
2.2 Flushing & Cleaning with air/ water mixture accepted FSD) &
2.3 Sterilization Accepted FSU3(D)
24° Date of Tie-in
Part Ii (fo be completed by FS Department — Enginecring Division)
| DOUINS TREAT =WETERING CABINET —
1 Method Statement for Flushing, Cleaning and Sterilization approved FSE/2(D)
24 o
22 Elushing & Cleaning with air/ water mixture accepted FSEI2(D) Q
2.3 Sterlization Accepted FSEI2(D) 9)
24 Date of Tie-In
Part IV (fo be completed by FS Department ~ Business Planning Division)
(Meter Number ]Meter Reaaing First Weter Reading Taker BY Date
‘Ene Userr Eu FSP
ESP/21(D) FSP/2(D) ESP(D) WN Operator
| | |
Date: __| Date: | Date: Date
| Note: wy of final apy led form to be forwarded ta_F: 4(D) for ce cos I