Você está na página 1de 1

GENERAL NOTES

1. This Drawing is not to be scaled.


2. All dimensions shown are in millimeters and do not take into
account applied finishes unless specifically indicated otherwise.
3. Any omissions or discrepancies found shall be reported to the
Architect / Engineer immediately.
4. Levels are given in meters to three decimal places above survey
datum.
5. This drawing is to be read in conjunction with the relevant section
of the specification and schedules.
6. The contractor shall submit full shop / setting out drawing for
approval (based on site dimensions) prior to commencement of
any site works, placing of orders, manufacture of fittings, fixtures
and components.

KEY PLAN

FINISH FLOOR LEVEL +0.480 = F.F.L. +8.40 ON SITE


REVISIONS

No. DATE DESCRIPTION BY


C0 15-06-15 CONSTRUCTION ISSUE.

DESIGN ARCHITECTS & MEP ENGINEERS

Godwin Austen Johnson


Architects
STRUCTURAL ENGINEERS

BUREAU OF ENGINEERING STUDIES


CONSULTING ENGINEERS
P.O. Box: 123606.101 Detroit House, Motor City, Dubai.
Tel: +9714 4572075 Fax: +9714 4572076
Email: best@bestconsultingengineers.com

OWNER

EDUTECH HOLDINGS LIMITED

ISSUED FOR

CONSTRUCTION ISSUE.
PROJECT

JVT SCHOOL
Plot No. JVT05SCP001
Jumeirah Village Triangle, Dubai, UAE
DRAWING TITLE

FOUNDATION PLAN PART-1

Drawn GK Checked MAR Approved

Date 22-09-2014 Scale 1:100

Project No. Zone Drawing No. Rev.

3350/DXB573 S-103 C0
Authority Dwg. No. Consecutive No.

This drawing, the designs and details shown are the copyright of
GODWIN AUSTEN JOHNSON and shall not be copied or reproduced in
any form without their written consent.

T +971 4 3237555 E mail@gaj-uae.ae


F +971 4 3237717 W www.gaj-uae.ae
PO Box 7185 Dubai United Arab Emirates

A1 Original Sheet FILE PATH : W:\17.UAE-DXB\DXB-573-Fortis School-GAJ-Ajai Mankani-school\701-Submissions\2015-06-13-Construction issue-C0\CAD\S-103-FOUNDATION PLAN PART-1.dwg
Size

Você também pode gostar