Escolar Documentos
Profissional Documentos
Cultura Documentos
TREATMENT
FOR A
Video Game
Rogue Spy
PREPARED
BY
Karl Turner
Slide
Sutton
Surrey
SM3 9PS
enquiries@slidegaming.sutton.sch.uk
27/02/2017
Rogue Spy will open with the protagonist MK breaking into a rundown factory
alongside fellow spies Atrox and Prash, they continue to clear rooms by killing
the gang members and saving a hostage who turns out to be a fellow spy and
therefore nifty with a gun. They continues to bust down doors and clear the
facilities until MK and the Hostage catch up to find the suspicious death of
college Prash.
Cut to
MK and the Hostage outside the factory where player is directed to call
friend Pablo to come and pick them up, the game tutorial begins and the
player learns the game basics.
Once he fills Pablo in with the details, they decide they must break into the
MI5 building to look deeper into past cases to see if theres any clue as the
why Atrox supposedly killed Atrox. They start the planning process.
He takes the files but decides its to big of a job to face alone so organises
a meeting with Jude the leader of the gang whos warehouse they cleared
out in the first job, as they now have shared interests. They link up and
Jude provides off the grid shelter in return for inside information.
Throughout the game Jude helps MK plan heist in return for small favours.
When the time is right they will pull off the final heist.
We have made a number of decisions that appeal to this audience. They are:
The genre of action adventure
The complex storyline
The customisable characterisation
The realistic city location
Budget
Audience Research:
10 hours at 80 an hour = 800
Market Research
10 hours at 80 an hour = 800
Planning meeting
3 hours at 120 an hour = 360
Script development
Fixed charge of 2000
Subtotal:
3960
Production Contingency @10%
396
4356
Total production budget:
4500
Schedule
The script will be produced within the timescale that will be indicated by our
production schedules. Slide will ensure that all development facilities adhere to
health and safety standards. The finished Rogue Spy will be available for testing
at an appropriate time in order for any changes to be made before the suggested
release date.
Sources of requirements
A copy of all research and planning will be produced via online format.
A trial version of Rogue Spy will be supplied for inspection and discussion.
The completed Rogue Spy will not be released until the client is
completely satisfied with content.
Slide Ltd
27/02/2017