Você está na página 1de 39

No.Dok : FR.EN.01.

03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg
I Set BOM untuk 1 Set

A RINCIAN MATERIAL

Plate MS 12.0 mm x 195 x 3,000 1.00 Pcs 55.11 1.17 55.11


Plate SUS 304 12.0 mm x 1,220 x 1,330 1.00 Pcs 154.31 3.25 154.31
Plate Bronze 5.0 mm x 40 x 224 1.00 Pcs 0.00 0.02 0.00
Plate Nylon 5.0 mm x 40 x 230 1.00 Pcs 0.00 0.02 0.00
As S45C / St 41 50 x 200 1.00 Pcs 3.08 0.03 3.08
Pipe / Hollow Cor SC 46 OD 500 ID 450 x 500 1.00 Pcs 146.42 0.79 146.42
As VCN 150 50 x 200 1.00 Pcs 3.08 0.03 3.08
As SUS 304 50 x 200 1.00 Pcs 3.11 0.03 3.11
Plate MS 5.0 mm x 500 1.00 Pcs 7.71 0.20 7.71
Plate SUS 304 5.0 mm x 500 1.00 Pcs 7.71 0.79 7.71
Bearing SKF / FYH / NTN 1.00 Pcs / Set
Flange / DN JIS 5K / JIS 10K/ ANSI 1.00 Pcs
Pin Belah / Pin Tanam 1.00 Pcs
Seal / Oil Seal Karet / Gland Packing / Klinger Seal 1.00 Pcs
Nepple Grease 0 /45/ 90 1/8" / 3/8" / 1/2" 1.00 Pcs
Sprocket RS 40/80/100/120/150/180/ Nikken Z ? 1.00 Pcs
Chain RS 40/80/100/120/150/180/20 Nikken 1.00 Boks
Hex. Bolt + NT + SW M20 x 120 8.8 / 4.6 / SUS 1.00 Pcs

380.53

* Waste 5% 19.03

* Jasa Supplier :
- Hardening Set
- Chrom Pcs
- Honing Pcs
- Machinning ( turning ) Pcs

* Painting :
- Sandblasting SA 2.5 20 micron 6.31 M2
- Wire brush 6.31 M2
- Primer 40 micron 6.31 M2
- Finish 40 micron 6.31 M2
- Tahan panas 40 micron 6.31 M2

TOTAL 6.31 380.53


B RINCIAN CONSUMABLE
1 Filler Metal F/ GTAW AWS SFA. A5.9 ER 309 dia. 2,4mm - Kg
2 Electrode F/ FCAW AWS SFA A5.20 E71T-1 dia. 1,2mm - Kg
3 Kawat las GA 24 dia. 3,2mm / dia. 4,0mm - Kg
4 Kawat las RD 718 dia. 2,6mm - Kg
5 Kawat las RD 718 dia. 3,2mm / dia. 4,0mm - Kg
6 Kawat las RD 260 dia. 2,0mm - Kg
7 Kawat las RD 260 dia. 2,6mm - Kg
8 Kawat las RD 260 dia. 3,2mm / dia. 4,0mm - Kg
9 Kawat las RD 360 dia. 2,6mm - Kg
10 Kawat las RD 360 dia. 3,2mm / dia. 4,0mm - Kg
11 Kawat las RC 52 dia. 2,6mm - Kg
12 Kawat las LB 52 dia. 3,2mm / dia. 4,0mm - Kg
13 Kawat las LB 52 U dia. 2,6mm - Kg
14 Kawat las RC 52 U dia. 3,2mm / dia. 4,0mm - Kg
15 Kawat las RC 52 U dia. 2,6mm - Kg
16 Kawat las RC 52 U dia. 3,2mm / dia. 4,0mm - Kg
17 Kawat las NSN 308 dia. 2,6mm - Kg
18 Kawat las NSN 308 dia. 3,2mm / dia. 4,0mm - Kg
19 Kawat las NSN 309 dia. 2,6mm - Kg
20 Kawat las NSN 309 dia. 3,2mm / dia. 4,0mm - Kg
21 Kawat las NSN 316 dia. 2,6mm - Kg
22 Kawat las NSN 316 dia. 3,2mm / dia. 4,0mm - Kg
23 Kawat las CIN 1 dia. 2,6mm - Kg

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 1


No.Dok : FR.EN.01.03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg
24 Kawat las CIN 1 dia. 3,2mm / dia. 4,0mm - Kg
25 Kawat las CIN 2 dia. 2,6mm - Kg
26 Kawat las CIN 2 dia. 3,2mm / dia. 4,0mm - Kg
27 Kawat las CIN 3 dia. 2,6mm - Kg
28 Kawat las CIN 3 dia. 3,2mm / dia. 4,0mm - Kg
29 Kawat las HV 350 dia. 3,2mm / dia. 4,0mm - Kg
30 Kawat las HV 450 dia. 3,2mm / dia. 4,0mm - Kg
31 Kawat las HV 600 dia. 3,2mm / dia. 4,0mm - Kg
32 Kawat las NSG dia. 3,2mm / dia. 4,0mm - Kg
33 Kawat las 360 U dia. 2,6mm - Kg
34 Kawat las 360 U dia. 3,2mm / dia. 4,0mm - Kg
35 Kawat las ARGON NSN 308 LR dia. 1.6mm/ 2.0mm/2.4mm - Kg
36 Kawat las ARGON NSN 316 LR dia. 1.6mm/ 2.0mm/2.4mm - Kg
37 Kawat las ARGON NTG 308 LR dia. 1.6mm/ 2.0mm/2.4mm - Kg
38 Gas argon - Tbg
39 Gas oksigen - Tbg
40 Gas LPG 50 Kg - Tbg
41 Batu gurinda poles 16 x 25 - Pcs
42 Batu gurinda poles 25 x 25 - Pcs
43 Batu gurinda clean n strip 4" - Pcs
44 Batu gurinda poles 4" / flexible 4" - Pcs
45 Batu gurinda poles 7" / flexible 7" - Pcs
46 Batu gurinda potong (CT) 4" - Pcs
47 Batu gurinda potong (CT) 7" - Pcs
48 Batu gurinda cutting (CT) 14" - Pcs
49 Batu gurinda buffing amplas - Pcs
50 Batu gurinda buffing - Pcs
51 Pelitur kemudi No.072 - Tbg
52 Plastik Pelindung SUS - Roll

TOTAL
C RINCIAN ALAT BANTU
1 Alat penunjang forming :
- Mesin cutting bend saw 1.00 Unit - - Jam
- Mesin cutting torch 1.00 Unit - - Jam
- Mesin cutting plasma 1.00 Unit - - Jam
- Mesin sharing cutting 1.00 Unit - - Jam
- Mesin bending 1.00 Unit - - Jam
- Mesin flanging 1.00 Unit - - Jam
- Mesin bodem 1.00 Unit - - Jam
- Mesin roll plate 1.00 Unit - - Jam
- Mesin roll pipa 1.00 Unit - - Jam
2 Alat penunjang fabrikasi :
- Mesin trafo las 1.00 Unit - - Jam
- Mesin bor impact besar 1.00 Unit - - Jam
- Mesin bor impact kecil 1.00 Unit - - Jam
- Mesin bor magnet tangan 1.00 Unit - - Jam
- Mesin gerinda tangan 4" 1.00 Unit - - Jam
- Mesin gerinda tangan 7" 1.00 Unit - - Jam
- Chain block 1 s/d 3 ton 1.00 Unit - - Jam
- Chain block 5 s/d 10 ton 1.00 Unit - - Jam
- Level block 3/4 ton 1.00 Unit - - Jam
- Level block 1 1/2 ton 1.00 Unit - - Jam
- Jack hammer electric 1.00 Unit - - Jam
- Jack hammer pneumatic 1.00 Unit - - Jam
- Jack hydraulic 50 ton 1.00 Unit - - Jam
- Kunci impact (Socket) 1.00 Unit - - Jam
3 Alat penunjang machining :
- Mesin bubut kecil 1.00 Unit - - Jam
- Mesin bubut sedang 1.00 Unit - - Jam
- Mesin bubut besar panjang 5 mtr 1.00 Unit - - Jam
- Mesin bubut besar panjang 8 mtr 1.00 Unit - - Jam
- Mesin bubut kodok 1.00 Unit - - Jam
- Mesin bubut extra besar 1.00 Unit - - Jam
- Mesin bubut CNC 1.00 Unit - - Jam
- Mesin bor frais 1.00 Unit - - Jam

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 2


No.Dok : FR.EN.01.03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg
- Mesin bor radial 1.00 Unit - - Jam
- Mesin scrap 1.00 Unit - - Jam
- Mesin stick 1.00 Unit - - Jam
- Mesin milling panjang (Planner) 1.00 Unit - - Jam
- Mesin milling 1.00 Unit - - Jam
- Mesin horizontal milling 1.00 Unit - - Jam
- Mesin milling hobbing 1.00 Unit - - Jam
- Mesin corter 1.00 Unit - - Jam
- Mesin Punch 1.00 Unit - - Jam
- Mesin line boring 1.00 Unit - - Jam
4 Alat penunjang handling & transportasi :
- Mobil pick-up 1.00 Unit - - Shift
- Mobil truk single 1.00 Unit - - Shift
- Mobil truk double 1.00 Unit - - Shift
- Sewa mobil 1.00 Unit - - Shift

TOTAL
D RINCIAN PEKERJAAN
Jam Kerja NORMAL : Jam Normal : Jumlah Hari :
1 Man day's forming :
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting bend saw 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting torch 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting plasma 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin sharing cutting 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bending 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin flanging 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bodem 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin roll plate 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin roll pipa 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
2 Man day's fabrikasi :
a. Manpower PT. Sinar Sakti Jaya
- Supervisor 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Stainless steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Cast steel, Bronze, Kuningan) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Carbon steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Fitter/ Rigger 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
b. Manpower Subkon
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Stainless steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Carbon steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Fitter/ Rigger 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
3 Man day's machining :
- Supervisor 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut kecil 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut sedang 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut besar panjang 5 meter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut besar panjang 8 meter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut kodok 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut extra besar 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut CNC 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bor frais 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bor radial 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin scrap 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin milling 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin milling panjang (Planner) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin stick 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin corter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin punch 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator line boring 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 3


No.Dok : FR.EN.01.03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg
4 Man day's painting :
- Painter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
5 Man day's handling & transportasi :
- Driver 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Shift
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Shift

Jam Kerja OVER TIME : Jam Normal : Jumlah Hari :


1 Man day's forming :
- Foreman 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin cutting bend saw 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin cutting torch 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin cutting plasma 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin sharing cutting 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bending 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin flanging 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bodem 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin roll plate 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin roll pipa 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
2 Man day's fabrikasi :
a. Manpower PT. Sinar Sakti Jaya
- Supervisor 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Foreman 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Welder (Stainless steel) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Welder (Cast steel, Bronze, Kuningan) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Welder (Carbon steel) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Fitter/ Rigger 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
b. Manpower Subkon
- Foreman 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Welder (Stainless steel) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Welder (Carbon steel) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Fitter/ Rigger 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
3 Man day's machining :
- Supervisor 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Foreman 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut kecil 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut sedang 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut besar panjang 5 meter 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut besar panjang 8 meter 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut kodok 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut extra besar 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bubut CNC 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bor frais 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin bor radial 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin scrap 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin milling 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin milling panjang (Planner) 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin stick 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin corter 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator mesin punch 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Operator line boring 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
4 Man day's painting :
- Painter 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Jam
5 Man day's handling & transportasi :
- Driver 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Shift
- Helper 5.5 Jam X 1.0 Hari 1.00 Orang 5.50 5.50 Shift

TOTAL

Tanggal dibuat :

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 4


No.Dok : FR.EN.01.03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg

Dibuat, Diperiksa Disetujui,


Ka. Dept . Engineering Ka. Div. Engineering

( ) ( ) ( Prasetyo )

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 5


Column1
Column1
6201
6202
6203
6204

14.85

03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 6


03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 7
03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 8
03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 9
03/10/2017 file:///var/www/apps/conversion/tmp/scratch_4/347728694.xls Page 10
KAWAT LAS LB 52-U 3.2mm JANGAN DIRUBAH

NO DIAMETER (D) PANJANG (L) LAYER KAWAT LAS

1 170 3 10 53.4

KAWAT LAS LB 52-U 2,6mm JANGAN DIRUBAH

NO DIAMETER (D) PANJANG (L) LAYER Kawat las

1 200 50 3 589.3

INSERT YOUR PROBLEM


JANGAN DIRUBAH !!!

HASIL (Kg) SAFETY (Kg)

1.780952381 2

JANGAN DIRUBAH !!!

HASIL (Kg) SAFETY (Kg)

12.2767857143 14
JUMLAH GIGI = 25

RS 25 RS 35 RS 40 RS 50 RS 60

PCD 50.51 75.77 101.02 126.28 151.53

OD 53.69 80.53 107.37 134.22 161.06

INSERT YOUR PROBLEM


RS 80 RS 100 RS 120 RS 140 RS 160

202.05 252.56 303.07 353.58 404.09

214.75 268.43 322.12 375.80 429.49


TEBAL
OD
[in (mm)]
DIMENSI
DN inchi SCH SCH
(mm) SCH 40s/40 80s/80
SCH 5 SCH 30 SCH 120 SCH 160
10s/10
( INCHI) /STD /XS
0.035 0.049 0.057 0.068 0.095
6
10.29 (0.889) (1.245) (1.448) (1.727) (2.413)
0.049 0.065 0.073 0.088 0.119
8
13.72 (1.245) (1.651) (1.854) (2.235) (3.023)
0.049 0.065 0.073 0.091 0.126
10
17.15 (1.245) (1.651) (1.854) (2.311) (3.200)
0.065 0.083 0.109 0.147
15
21.34 (1.651) (2.108) (2.769) (3.734)
0.065 0.083 0.113 0.154
20
26.67 (1.651) (2.108) (2.870) (3.912)
0.065 0.109 0.133 0.179
1 25
33.40 (1.651) (2.769) (3.378) (4.547)
0.065 0.109 0.117 0.140 0.191
1 32
42.16 (1.651) (2.769) (2.972) (3.556) (4.851)
0.065 0.109 0.125 0.145 0.200
1 40
48.26 (1.651) (2.769) (3.175) (3.683) (5.080)
0.065 0.109 0.125 0.154 0.218 0.250 0.343
2 50
60.33 (1.651) (2.769) (3.175) (3.912) (5.537) (6.350) (8.712)
0.083 0.120 0.188 0.203 0.276 0.300 0.375
2 65
73.02 (2.108) (3.048) (4.775) (5.156) (7.010) (7.620) (9.525)
0.083 0.120 0.188 0.216 0.300 0.350 0.438
3 80
88.90 (2.108) (3.048) (4.775) (5.486) (7.620) (8.890) (11.125)
0.083 0.120 0.188 0.226 0.318
3 90
101.60 (2.108) (3.048) (4.775) (5.740) (8.077)

DN OD Wall thickness
[2] [in (mm)] [in (mm)]
DIMENSI
SCH SCH
SCH 40s/40 80s/80
SCH 5 SCH 20 SCH 30 SCH 60
10s/10
(INCHI) /STD /XS
0.083 0.120 0.188 0.237 0.281 0.337
4 100
114.30 (2.108) (3.048) (4.775) (6.020) (7.137) (8.560)
0.247 0.355
4 115
127.00 (6.274) (9.017)
0.109 0.134 0.258 0.375
5 125
141.30 (2.769) (3.404) (6.553) (9.525)
0.109 0.134 0.280 0.432
6 150
168.27 (2.769) (3.404) (7.112) (10.973)
0.109 0.148 0.250 0.277 0.322 0.406 0.500
8 200
219.08 (2.769) (3.759) (6.350) (7.036) (8.179) (10.312) (12.700)
XXS


0.294
(7.468)
0.308
(7.823)
0.358
(9.093)
0.382
(9.703)
0.400
(10.160)
0.436
(11.074)
0.552
(14.021)
0.600
(15.240)
0.636
(16.154)

ickness
mm)]

SCH 100 SCH 120 SCH 140 SCH 160


XXS[5]
0.437 0.531 0.674
(11.100) (13.487) (17.120)
0.710
(18.034)
0.500 0.625 0.750
(12.700) (15.875) (19.050)
0.562 0.718 0.864
(14.275) (18.237) (21.946)
0.593 0.718 0.812 0.906 0.875
(15.062) (18.237) (20.625) (23.012) (22.225)
128.3
KETERANGAN Berat Sat
P (mm) B.J. Qty Sat.
Kg

MATERIAL
1 Pipe med. dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.22
2 Pipe sch.10 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.00
3 Pipe sch.40 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.27
4 Pipe sch.80 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.62
5 Pipe med. dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.58
6 Pipe sch.10 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.28
7 Pipe sch.40 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.68
8 Pipe sch.80 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 2.19
9 Pipe med. dia. 1" SS 400 L- 1000 - 1.00 Btg 2.44
10 Pipe sch.10 dia. 1" SS 400 L- 1000 - 1.00 Btg 2.09
11 Pipe sch.40 dia. 1" SS 400 L- 1000 - 1.00 Btg 2.50
12 Pipe sch.80 dia. 1" SS 400 L- 1000 - 1.00 Btg 3.24
13 Pipe med. dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 3.14
14 Pipe sch.10 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 2.69
15 Pipe sch.40 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 3.39
16 Pipe sch.80 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 4.46
17 Pipe med. dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 3.62
18 Pipe sch.10 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 3.11
19 Pipe sch.40 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 4.05
20 Pipe sch.80 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 5.41
21 Pipe med. dia. 2" SS 400 L- 1000 - 1.00 Btg 5.09
22 Pipe sch.10 dia. 2" SS 400 L- 1000 - 1.00 Btg 3.93
23 Pipe sch.20 dia. 2" SS 400 L- 1000 - 1.00 Btg 4.51
24 Pipe sch.40 dia. 2" SS 400 L- 1000 - 1.00 Btg 5.44
25 Pipe sch.80 dia. 2" SS 400 L- 1000 - 1.00 Btg 7.49
26 Pipe med. dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 6.52
27 Pipe sch.10 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 5.26
28 Pipe sch.20 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 7.60
29 Pipe sch.40 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 8.64
30 Pipe sch.80 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 11.41
31 Pipe med. dia. 3" SS 400 L- 1000 - 1.00 Btg 8.47
32 Pipe sch.10 dia. 3" SS 400 L- 1000 - 1.00 Btg 6.46
33 Pipe sch.20 dia. 3" SS 400 L- 1000 - 1.00 Btg 9.37
34 Pipe sch.40 dia. 3" SS 400 L- 1000 - 1.00 Btg 11.29
35 Pipe sch.80 dia. 3" SS 400 L- 1000 - 1.00 Btg 15.27
36 Pipe sch.10 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 7.41
37 Pipe sch.40 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 13.57
38 Pipe sch.80 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 18.63
39 Pipe med. dia. 4" SS 400 L- 1000 - 1.00 Btg 12.10
40 Pipe sch.10 dia. 4" SS 400 L- 1000 - 1.00 Btg 8.37
41 Pipe sch.20 dia. 4" SS 400 L- 1000 - 1.00 Btg 13.22
42 Pipe sch.40 dia. 4" SS 400 L- 1000 - 1.00 Btg 16.07
43 Pipe sch.80 dia. 4" SS 400 L- 1300 - 1.00 Btg 29.02
44 Pipe med. dia. 5" SS 400 L- 1000 - 1.00 Btg 16.20
45 Pipe sch.10 dia. 5" SS 400 L- 1000 - 1.00 Btg 11.56
46 Pipe sch.20 dia. 5" SS 400 L- 1000 - 1.00 Btg 17.13
47 Pipe sch.40 dia. 5" SS 400 L- 1000 - 1.00 Btg 21.77
48 Pipe sch.80 dia. 5" SS 400 L- 1000 - 1.00 Btg 30.97
49 Pipe med. dia. 6" SS 400 L- 1000 - 1.00 Btg 19.20
50 Pipe sch.10 dia. 6" SS 400 L- 1000 - 1.00 Btg 13.82
51 Pipe sch.20 dia. 6" SS 400 L- 1000 - 1.00 Btg 22.08
52 Pipe sch.40 dia. 6" SS 400 L- 1000 - 1.00 Btg 28.26
53 Pipe sch.80 dia. 6" SS 400 L- 1000 - 1.00 Btg 42.56
54 Pipe sch.10 dia. 8" SS 400 L- 1000 - 1.00 Btg 19.96
55 Pipe sch.20 dia. 8" SS 400 L- 1000 - 1.00 Btg 33.31
56 Pipe sch.40 dia. 8" SS 400 L- 1000 - 1.00 Btg 42.54
57 Pipe sch.80 dia. 8" SS 400 L- 1000 - 1.00 Btg 64.63
58 Pipe sch.10 dia. 10" SS 400 L- 1000 - 1.00 Btg 27.78
59 Pipe sch.20 dia. 10" SS 400 L- 1000 - 1.00 Btg 41.76
60 Pipe sch.40 dia. 10" SS 400 L- 1000 - 1.00 Btg 60.30
61 Pipe sch.80 dia. 10" SS 400 L- 1000 - 1.00 Btg 95.81
62 Pipe sch.10 dia. 12" SS 400 L- 1000 - 1.00 Btg 35.98
63 Pipe sch.20 dia. 12" SS 400 L- 1000 - 1.00 Btg 49.72
64 Pipe sch.40 dia. 12" SS 400 L- 1000 - 1.00 Btg 79.72
65 Pipe sch.80 dia. 12" SS 400 L- 1000 - 1.00 Btg 131.85
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.

0.04 264.00 0.04 LB-52 1.22 -


0.04 264.00 0.04 LB-52 1.00 -
0.04 264.00 0.04 LB-52 1.27 -
0.04 264.00 0.04 LB-52 1.62 -
0.06 340.00 0.05 LB-52 1.58 -
0.06 340.00 0.05 LB-52 1.28 -
0.06 340.00 0.05 LB-52 1.68 -
0.06 340.00 0.05 LB-52 2.19 -
0.08 428.00 0.06 LB-52 2.44 -
0.08 428.00 0.06 LB-52 2.09 -
0.08 428.00 0.06 LB-52 2.50 -
0.08 428.00 0.06 LB-52 3.24 -
0.10 540.00 0.08 LB-52 3.14 -
0.10 540.00 0.08 LB-52 2.69 -
0.10 540.00 0.08 LB-52 3.39 -
0.10 540.00 0.08 LB-52 4.46 -
0.12 628.00 0.09 LB-52 3.62 -
0.12 628.00 0.09 LB-52 3.11 -
0.12 628.00 0.09 LB-52 4.05 -
0.12 628.00 0.09 LB-52 5.41 -
0.16 760.00 0.11 LB-52 5.09 -
0.16 760.00 0.11 LB-52 3.93 -
0.16 760.00 0.11 LB-52 4.51 -
0.16 760.00 0.11 LB-52 5.44 -
0.16 760.00 0.11 LB-52 7.49 -
0.20 960.00 0.13 LB-52 6.52 -
0.20 960.00 0.13 LB-52 5.26 -
0.20 960.00 0.13 LB-52 7.60 -
0.20 960.00 0.13 LB-52 8.64 -
0.20 1,440.00 0.29 LB-52 11.41 -
0.24 1,132.00 0.16 LB-52 8.47 -
0.24 1,132.00 0.16 LB-52 6.46 -
0.24 1,132.00 0.16 LB-52 9.37 -
0.24 1,132.00 0.16 LB-52 11.29 -
0.24 1,698.00 0.34 LB-52 15.27 -
0.28 1,280.00 0.18 LB-52 7.41 -
0.28 1,280.00 0.18 LB-52 13.57 -
0.28 1,920.00 0.39 LB-52 18.63 -
0.32 1,440.00 0.20 LB-52 12.10 -
0.32 1,440.00 0.20 LB-52 8.37 -
0.32 1,440.00 0.20 LB-52 13.22 -
0.32 1,440.00 0.20 LB-52 16.07 -
0.42 2,160.00 0.44 LB-52 29.02 -
0.40 1,780.00 0.25 LB-52 16.20 -
0.40 1,780.00 0.25 LB-52 11.56 -
0.40 1,780.00 0.25 LB-52 17.13 -
0.40 1,780.00 0.25 LB-52 21.77 -
0.40 2,670.00 0.54 LB-52 30.97 -
0.48 2,120.00 0.29 LB-52 19.20 -
0.48 2,120.00 0.29 LB-52 13.82 -
0.48 2,120.00 0.29 LB-52 22.08 -
0.48 3,180.00 0.64 LB-52 28.26 -
0.48 3,180.00 0.64 LB-52 42.56 -
0.64 2,800.00 0.39 LB-52 19.96 -
0.64 2,800.00 0.39 LB-52 33.31 -
0.64 4,200.00 0.85 LB-52 42.54 -
0.64 4,200.00 0.85 LB-52 64.63 -
0.80 3,440.00 0.48 LB-52 27.78 -
0.80 3,440.00 0.48 LB-52 41.76 -
0.80 8,600.00 1.74 LB-52 60.30 -
0.80 10,320.00 2.08 LB-52 95.81 -
0.96 4,060.00 0.56 LB-52 35.98 -
0.96 4,060.00 0.56 LB-52 49.72 -
0.96 10,150.00 2.05 LB-52 79.72 -
0.96 12,180.00 2.46 LB-52 131.85 -
Berat Sat
KETERANGAN P (mm) L (mm) Qty Sat.
Kg

MATERIAL
1 L 40.40.4 MS L- 1000 - 1.00 Btg 2.42
2 L 50.50.5 MS L- 425 - 4.00 Btg 1.60
3 L 60.60.5 MS L- 1000 - 1.00 Btg 4.55
4 L 60.60.6 MS L- 1000 - 1.00 Btg 5.42
5 L 65.65.6 MS L- 1000 - 1.00 Btg 5.92
6 L 70.70.7 MS L- 1000 - 1.00 Btg 7.38
7 L 75.75.6 MS L- 1000 - 1.00 Btg 6.87
8 L 75.75.8 MS L- 1000 - 1.00 Btg 9.03
9 L 80.80.8 MS L- 1000 - 1.00 Btg 9.67
10 L 90.90.9 MS L- 1000 - 1.00 Btg 12.20
11 L 100.100.10 MS L- 1000 - 1.00 Btg 15.10
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.

0.21 480.00 0.07 LB-52 2.42 -


0.43 2,400.00 0.33 LB-52 6.41 -
0.20 720.00 0.10 LB-52 4.55 -
0.24 720.00 0.10 LB-52 5.42 -
0.26 780.00 0.11 LB-52 5.92 -
0.28 840.00 0.12 LB-52 7.38 -
0.30 900.00 0.13 LB-52 6.87 -
0.40 900.00 0.13 LB-52 9.03 -
0.32 960.00 0.13 LB-52 9.67 -
0.36 1,080.00 0.15 LB-52 12.20 -
0.40 1,200.00 0.17 LB-52 15.10 -
KETERANGAN P (mm) L (mm) Qty Sat.

MATERIAL
1 WF150.75.5.7 MS L- 1000 - 1.00 Btg
2 WF200.100.5,5.8 MS L- 1000 - 1.00 Btg
3 WF250.125.6.9 MS L- 1000 - 1.00 Btg
4 WF300.150.6,5.9 MS L- 1000 - 1.00 Btg
5 WF350.175.7.11 MS L- 1000 - 1.00 Btg
6 WF400.200.8.13 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.

14.00 0.63 1,800.00 0.25 LB-52 14.00 -


21.33 0.83 2,400.00 0.48 LB-52 21.33 -
29.60 1.04 3,000.00 0.61 LB-52 29.60 -
36.70 1.24 3,600.00 0.73 LB-52 36.70 -
49.60 1.44 4,200.00 0.85 LB-52 49.60 -
66.00 1.65 6,400.00 1.29 LB-52 66.00 -
KETERANGAN P (mm) L (mm) Qty Sat.

MATERIAL
1 HB100.100.6.8 MS L- 1000 - 1.00 Btg
2 HB150.150.7.10 MS L- 1000 - 1.00 Btg
3 HB200.200.8.12 MS L- 1000 - 1.00 Btg
4 HB250.250.9.14 MS L- 1000 - 1.00 Btg
5 HB300.300.10.15 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.

17.17 0.63 1,800.00 0.36 LB-52 17.17 -


31.50 0.94 2,700.00 0.55 LB-52 31.50 -
49.92 1.25 3,600.00 0.73 LB-52 49.92 -
72.42 1.56 4,500.00 0.91 LB-52 72.42 -
94.00 1.86 5,400.00 1.09 LB-52 94.00 -
KETERANGAN P (mm) L (mm) Qty Sat.

MATERIAL
1 UNP 80.45.6 MS L- 1000 - 1.00 Btg
2 UNP 100.50.6 MS L- 1000 - 1.00 Btg
3 UNP 120.55.6 MS L- 1000 - 1.00 Btg
4 UNP 125.65.6 MS L- 1000 - 1.00 Btg
5 UNP 140.60.7 MS L- 1000 - 1.00 Btg
6 UNP 150.75.7,5 MS L- 1000 - 1.00 Btg
7 UNP 200.80.7,5 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.

8.33 0.34 1,020.00 0.14 LB-52 8.33 -


9.37 0.40 1,200.00 0.17 LB-52 9.37 -
13.40 0.46 1,440.00 0.20 LB-52 13.40 -
13.40 0.51 1,500.00 0.21 LB-52 13.40 -
16.00 0.52 1,560.00 0.22 LB-52 16.00 -
18.67 0.60 1,800.00 0.25 LB-52 18.67 -
24.67 0.72 2,160.00 0.30 LB-52 24.67 -
Berat Sat Ttl Luas
No. KETERANGAN P (mm) L (mm) B.J. Qty Sat.
Kg m

I MATERIAL
1 CNP 100.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 4.06 0.48
2 CNP 100.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 5.50 0.48
3 CNP 125.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 4.51 0.53
4 CNP 125.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 6.17 0.53
5 CNP 150.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 5.00 0.58
6 CNP 150.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 6.77 0.58
Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m' kg Las Rp. Rp.

960.00 0.13 LB-52 4.06 -


960.00 0.13 LB-52 5.50 -
1,060.00 0.15 LB-52 4.51 -
1,060.00 0.15 LB-52 6.17 -
1,160.00 0.16 LB-52 5.00 -
1,160.00 0.16 LB-52 6.77 -
Berat Sat
No. KETERANGAN P (mm) L (mm) B.J. Qty Sat.
Kg

I MATERIAL
1 Chk. Plate 2 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 59.00
2 Chk. Plate 3 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 76.96
3 Chk. Plate 3 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 82.09
4 Chk. Plate 4 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 102.62
5 Chk. Plate 5 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 115.44
6 Chk. Plate 5 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 128.27
7 Chk. Plate 6 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 153.92
8 Chk. Plate 8 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 205.23
9 Chk. Plate 9 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 230.89
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.

5.95 14,640.00 2.03 LB-52 59.00 kg -


5.95 14,640.00 2.03 LB-52 76.96 kg -
5.95 14,640.00 2.03 LB-52 82.09 kg -
5.95 14,640.00 2.03 LB-52 102.62 kg -
5.95 14,640.00 2.03 LB-52 115.44 kg -
5.95 14,640.00 2.03 LB-52 128.27 kg -
5.95 14,640.00 2.03 LB-52 153.92 kg -
5.95 21,960.00 4.44 LB-52 205.23 kg -
5.95 21,960.00 4.44 LB-52 230.89 kg -
Customer : PT.
Project :
Sales :
MANPOWER SCHEDULE / MACHINE SCHEDULE
Estimator :
DAYS / HOURS Total Remarks
No. Manpower / Machine Manpower Tot. Days
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Qty Sat. Qty Sat.
A Forming :
- Cutting Tourch Machine Orang 0 Hours
- Roll Plate Machine Orang 0 Hours
- Roll Pipe Machine Orang 0 Hours
- Bodem Machine Orang 0 Hours
- Flanging Machine Orang 0 Hours
- Sharing Cut Machine Orang 0 Hours
- Bending Machine Orang 0 Hours
B Fabrication :
- Supervisor Orang 0 Hours
- Quality control Orang 0 Hours
- Safety Orang 0 Hours
- Foreman Orang 0 Hours
- Fitter Orang 0 Hours
- Welder Orang 0 Hours
- Helper Orang 0 Hours
C Machining :
- Supervisor Orang 0 Hours
- Quality control Orang 0 Hours
- Foreman Orang 0 Hours
- Small Lathe Machine Orang 0 Hours
- Medium Lathe Machine Orang 0 Hours
- Big Lathe Machine Orang 0 Hours
- Long Lathe Machine Orang 0 Hours
- Lathe Frog Machine Orang 0 Hours
- Extra Big Lathe Machine Orang 0 Hours
- CNC Lathe Machine Orang 0 Hours
- Frais Machine Orang 0 Hours
- Drilling Machine Orang 0 Hours
- Stick Machine Orang 0 Hours
- Milling machine Orang 0 Hours
- Long milling machine (Planner) Orang 0 Hours
- Corter Machine Orang 0 Hours
- Punch machine Orang 0 Hours
- Helper Orang 0 Hours
D Dismantle :
- Supervisor Orang 0 Hours
- Quality control Orang 0 Hours
- Safety Orang 0 Hours
- Foreman Orang 0 Hours
- Fitter Orang 0 Hours
- Welder Orang 0 Hours
- Helper Orang 0 Hours
E Erection :
- Supervisor Orang 0 Hours
35 of 1
Customer : PT.
Project :
Sales :
MANPOWER SCHEDULE / MACHINE SCHEDULE
Estimator :
DAYS / HOURS Total Remarks
No. Manpower / Machine Manpower Tot. Days
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Qty Sat. Qty Sat.
- Quality control Orang 0 Hours
- Safety Orang 0 Hours
- Foreman Orang 0 Hours
- Fitter Orang 0 Hours
- Welder Orang 0 Hours
- Helper Orang 0 Hours
F Painting :
- Painter Orang 0 Hours
- Helper Orang 0 Hours
G Delivery :
- Driver Orang 0 Hours
- Helper Orang 0 Hours
Orang 0 Hours

Date,
Prepared by, Approved by, Aknowledge
Estimator Head of Dept production

( ) Sahono Suwito ( )

Note : 1. Man power schedule dihitung berdasarkan jam normal


2. Supervisor membawahi minimal 20 orang
3. Foreman membawahi minimal 10 orang
4. Pekerjaan machining dihitung berdasarkan per jam
5. Fabikasi / Bongkar / Pasang untuk 1 (Satu) group terdiri dari :
- Fitter : Orang
- Welder : Orang
- Helper : Orang
6. Roll Plate / Roll pipe / Bodem / Flanging machine untuk 1 (Satu) group terdiri dari :
- Operator : Orang
- Helper : Orang
7. Shearing cut / Bending machine untuk 1 (Satu) group terdiri dari :
- Operator : Orang
- Helper : Orang

36 of 1
PENAWARAN HARGA

Nama Pekerjaan :

Customer : PT.

No. SP D-013

NO DESKRIPSI VOLUME SATUANHARGA SATUAN TOTAL KETERANGAN

1 Wire brush 80.28 M2 Rp Rp

2 Painting primer 80.28 M2 Rp Rp

40 micron

3 Painting finish 80.28 M2 Rp Rp

40 micron

TOTAL PENAWARAN HARGA


Rp.

Gunung Putri, ..
Dibuat oleh,
The torque available at the driven wheel or pulley can be expressed as

T = (F2 - F1) ra (1)

where

T = torque (Nm)

F = force (N)

r = radius wheel or pulley

The available power can be expressed as

P = T a = (F2 - F1) ra (2)

where

P = power transmitted (Watts)

= angular velocity (rad/s)

Você também pode gostar