Escolar Documentos
Profissional Documentos
Cultura Documentos
03
Edisi :1
BILL OF MATERIAL No.Rev :2
Hal :1
Customer : PT. No.BOM : EN.B.13.
Project : No.PPH :
No. Drawing : Rev. :0
Description Qty Berat Sat Area Ttl Berat
No. Sat. Keterangan
Part Name Mat'l spec. Dimension (mm) (indeks) Kg m kg
I Set BOM untuk 1 Set
A RINCIAN MATERIAL
380.53
* Waste 5% 19.03
* Jasa Supplier :
- Hardening Set
- Chrom Pcs
- Honing Pcs
- Machinning ( turning ) Pcs
* Painting :
- Sandblasting SA 2.5 20 micron 6.31 M2
- Wire brush 6.31 M2
- Primer 40 micron 6.31 M2
- Finish 40 micron 6.31 M2
- Tahan panas 40 micron 6.31 M2
TOTAL
C RINCIAN ALAT BANTU
1 Alat penunjang forming :
- Mesin cutting bend saw 1.00 Unit - - Jam
- Mesin cutting torch 1.00 Unit - - Jam
- Mesin cutting plasma 1.00 Unit - - Jam
- Mesin sharing cutting 1.00 Unit - - Jam
- Mesin bending 1.00 Unit - - Jam
- Mesin flanging 1.00 Unit - - Jam
- Mesin bodem 1.00 Unit - - Jam
- Mesin roll plate 1.00 Unit - - Jam
- Mesin roll pipa 1.00 Unit - - Jam
2 Alat penunjang fabrikasi :
- Mesin trafo las 1.00 Unit - - Jam
- Mesin bor impact besar 1.00 Unit - - Jam
- Mesin bor impact kecil 1.00 Unit - - Jam
- Mesin bor magnet tangan 1.00 Unit - - Jam
- Mesin gerinda tangan 4" 1.00 Unit - - Jam
- Mesin gerinda tangan 7" 1.00 Unit - - Jam
- Chain block 1 s/d 3 ton 1.00 Unit - - Jam
- Chain block 5 s/d 10 ton 1.00 Unit - - Jam
- Level block 3/4 ton 1.00 Unit - - Jam
- Level block 1 1/2 ton 1.00 Unit - - Jam
- Jack hammer electric 1.00 Unit - - Jam
- Jack hammer pneumatic 1.00 Unit - - Jam
- Jack hydraulic 50 ton 1.00 Unit - - Jam
- Kunci impact (Socket) 1.00 Unit - - Jam
3 Alat penunjang machining :
- Mesin bubut kecil 1.00 Unit - - Jam
- Mesin bubut sedang 1.00 Unit - - Jam
- Mesin bubut besar panjang 5 mtr 1.00 Unit - - Jam
- Mesin bubut besar panjang 8 mtr 1.00 Unit - - Jam
- Mesin bubut kodok 1.00 Unit - - Jam
- Mesin bubut extra besar 1.00 Unit - - Jam
- Mesin bubut CNC 1.00 Unit - - Jam
- Mesin bor frais 1.00 Unit - - Jam
TOTAL
D RINCIAN PEKERJAAN
Jam Kerja NORMAL : Jam Normal : Jumlah Hari :
1 Man day's forming :
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting bend saw 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting torch 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin cutting plasma 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin sharing cutting 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bending 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin flanging 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bodem 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin roll plate 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin roll pipa 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
2 Man day's fabrikasi :
a. Manpower PT. Sinar Sakti Jaya
- Supervisor 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Stainless steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Cast steel, Bronze, Kuningan) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Carbon steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Fitter/ Rigger 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
b. Manpower Subkon
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Stainless steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Welder (Carbon steel) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Fitter/ Rigger 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
3 Man day's machining :
- Supervisor 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Foreman 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut kecil 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut sedang 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut besar panjang 5 meter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut besar panjang 8 meter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut kodok 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut extra besar 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bubut CNC 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bor frais 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin bor radial 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin scrap 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin milling 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin milling panjang (Planner) 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin stick 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin corter 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator mesin punch 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Operator line boring 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
- Helper 7.0 Jam X 1.0 Hari 1.00 Orang 7.00 7.00 Jam
TOTAL
Tanggal dibuat :
( ) ( ) ( Prasetyo )
14.85
1 170 3 10 53.4
1 200 50 3 589.3
1.780952381 2
12.2767857143 14
JUMLAH GIGI = 25
RS 25 RS 35 RS 40 RS 50 RS 60
DN OD Wall thickness
[2] [in (mm)] [in (mm)]
DIMENSI
SCH SCH
SCH 40s/40 80s/80
SCH 5 SCH 20 SCH 30 SCH 60
10s/10
(INCHI) /STD /XS
0.083 0.120 0.188 0.237 0.281 0.337
4 100
114.30 (2.108) (3.048) (4.775) (6.020) (7.137) (8.560)
0.247 0.355
4 115
127.00 (6.274) (9.017)
0.109 0.134 0.258 0.375
5 125
141.30 (2.769) (3.404) (6.553) (9.525)
0.109 0.134 0.280 0.432
6 150
168.27 (2.769) (3.404) (7.112) (10.973)
0.109 0.148 0.250 0.277 0.322 0.406 0.500
8 200
219.08 (2.769) (3.759) (6.350) (7.036) (8.179) (10.312) (12.700)
XXS
0.294
(7.468)
0.308
(7.823)
0.358
(9.093)
0.382
(9.703)
0.400
(10.160)
0.436
(11.074)
0.552
(14.021)
0.600
(15.240)
0.636
(16.154)
ickness
mm)]
MATERIAL
1 Pipe med. dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.22
2 Pipe sch.10 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.00
3 Pipe sch.40 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.27
4 Pipe sch.80 dia. 1/2" SS 400 L- 1000 - 1.00 Btg 1.62
5 Pipe med. dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.58
6 Pipe sch.10 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.28
7 Pipe sch.40 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 1.68
8 Pipe sch.80 dia. 3/4" SS 400 L- 1000 - 1.00 Btg 2.19
9 Pipe med. dia. 1" SS 400 L- 1000 - 1.00 Btg 2.44
10 Pipe sch.10 dia. 1" SS 400 L- 1000 - 1.00 Btg 2.09
11 Pipe sch.40 dia. 1" SS 400 L- 1000 - 1.00 Btg 2.50
12 Pipe sch.80 dia. 1" SS 400 L- 1000 - 1.00 Btg 3.24
13 Pipe med. dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 3.14
14 Pipe sch.10 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 2.69
15 Pipe sch.40 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 3.39
16 Pipe sch.80 dia. 1-1/4" SS 400 L- 1000 - 1.00 Btg 4.46
17 Pipe med. dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 3.62
18 Pipe sch.10 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 3.11
19 Pipe sch.40 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 4.05
20 Pipe sch.80 dia. 1-1/2" SS 400 L- 1000 - 1.00 Btg 5.41
21 Pipe med. dia. 2" SS 400 L- 1000 - 1.00 Btg 5.09
22 Pipe sch.10 dia. 2" SS 400 L- 1000 - 1.00 Btg 3.93
23 Pipe sch.20 dia. 2" SS 400 L- 1000 - 1.00 Btg 4.51
24 Pipe sch.40 dia. 2" SS 400 L- 1000 - 1.00 Btg 5.44
25 Pipe sch.80 dia. 2" SS 400 L- 1000 - 1.00 Btg 7.49
26 Pipe med. dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 6.52
27 Pipe sch.10 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 5.26
28 Pipe sch.20 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 7.60
29 Pipe sch.40 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 8.64
30 Pipe sch.80 dia. 2-1/2" SS 400 L- 1000 - 1.00 Btg 11.41
31 Pipe med. dia. 3" SS 400 L- 1000 - 1.00 Btg 8.47
32 Pipe sch.10 dia. 3" SS 400 L- 1000 - 1.00 Btg 6.46
33 Pipe sch.20 dia. 3" SS 400 L- 1000 - 1.00 Btg 9.37
34 Pipe sch.40 dia. 3" SS 400 L- 1000 - 1.00 Btg 11.29
35 Pipe sch.80 dia. 3" SS 400 L- 1000 - 1.00 Btg 15.27
36 Pipe sch.10 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 7.41
37 Pipe sch.40 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 13.57
38 Pipe sch.80 dia. 3-1/2" SS 400 L- 1000 - 1.00 Btg 18.63
39 Pipe med. dia. 4" SS 400 L- 1000 - 1.00 Btg 12.10
40 Pipe sch.10 dia. 4" SS 400 L- 1000 - 1.00 Btg 8.37
41 Pipe sch.20 dia. 4" SS 400 L- 1000 - 1.00 Btg 13.22
42 Pipe sch.40 dia. 4" SS 400 L- 1000 - 1.00 Btg 16.07
43 Pipe sch.80 dia. 4" SS 400 L- 1300 - 1.00 Btg 29.02
44 Pipe med. dia. 5" SS 400 L- 1000 - 1.00 Btg 16.20
45 Pipe sch.10 dia. 5" SS 400 L- 1000 - 1.00 Btg 11.56
46 Pipe sch.20 dia. 5" SS 400 L- 1000 - 1.00 Btg 17.13
47 Pipe sch.40 dia. 5" SS 400 L- 1000 - 1.00 Btg 21.77
48 Pipe sch.80 dia. 5" SS 400 L- 1000 - 1.00 Btg 30.97
49 Pipe med. dia. 6" SS 400 L- 1000 - 1.00 Btg 19.20
50 Pipe sch.10 dia. 6" SS 400 L- 1000 - 1.00 Btg 13.82
51 Pipe sch.20 dia. 6" SS 400 L- 1000 - 1.00 Btg 22.08
52 Pipe sch.40 dia. 6" SS 400 L- 1000 - 1.00 Btg 28.26
53 Pipe sch.80 dia. 6" SS 400 L- 1000 - 1.00 Btg 42.56
54 Pipe sch.10 dia. 8" SS 400 L- 1000 - 1.00 Btg 19.96
55 Pipe sch.20 dia. 8" SS 400 L- 1000 - 1.00 Btg 33.31
56 Pipe sch.40 dia. 8" SS 400 L- 1000 - 1.00 Btg 42.54
57 Pipe sch.80 dia. 8" SS 400 L- 1000 - 1.00 Btg 64.63
58 Pipe sch.10 dia. 10" SS 400 L- 1000 - 1.00 Btg 27.78
59 Pipe sch.20 dia. 10" SS 400 L- 1000 - 1.00 Btg 41.76
60 Pipe sch.40 dia. 10" SS 400 L- 1000 - 1.00 Btg 60.30
61 Pipe sch.80 dia. 10" SS 400 L- 1000 - 1.00 Btg 95.81
62 Pipe sch.10 dia. 12" SS 400 L- 1000 - 1.00 Btg 35.98
63 Pipe sch.20 dia. 12" SS 400 L- 1000 - 1.00 Btg 49.72
64 Pipe sch.40 dia. 12" SS 400 L- 1000 - 1.00 Btg 79.72
65 Pipe sch.80 dia. 12" SS 400 L- 1000 - 1.00 Btg 131.85
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.
MATERIAL
1 L 40.40.4 MS L- 1000 - 1.00 Btg 2.42
2 L 50.50.5 MS L- 425 - 4.00 Btg 1.60
3 L 60.60.5 MS L- 1000 - 1.00 Btg 4.55
4 L 60.60.6 MS L- 1000 - 1.00 Btg 5.42
5 L 65.65.6 MS L- 1000 - 1.00 Btg 5.92
6 L 70.70.7 MS L- 1000 - 1.00 Btg 7.38
7 L 75.75.6 MS L- 1000 - 1.00 Btg 6.87
8 L 75.75.8 MS L- 1000 - 1.00 Btg 9.03
9 L 80.80.8 MS L- 1000 - 1.00 Btg 9.67
10 L 90.90.9 MS L- 1000 - 1.00 Btg 12.20
11 L 100.100.10 MS L- 1000 - 1.00 Btg 15.10
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.
MATERIAL
1 WF150.75.5.7 MS L- 1000 - 1.00 Btg
2 WF200.100.5,5.8 MS L- 1000 - 1.00 Btg
3 WF250.125.6.9 MS L- 1000 - 1.00 Btg
4 WF300.150.6,5.9 MS L- 1000 - 1.00 Btg
5 WF350.175.7.11 MS L- 1000 - 1.00 Btg
6 WF400.200.8.13 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.
MATERIAL
1 HB100.100.6.8 MS L- 1000 - 1.00 Btg
2 HB150.150.7.10 MS L- 1000 - 1.00 Btg
3 HB200.200.8.12 MS L- 1000 - 1.00 Btg
4 HB250.250.9.14 MS L- 1000 - 1.00 Btg
5 HB300.300.10.15 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.
MATERIAL
1 UNP 80.45.6 MS L- 1000 - 1.00 Btg
2 UNP 100.50.6 MS L- 1000 - 1.00 Btg
3 UNP 120.55.6 MS L- 1000 - 1.00 Btg
4 UNP 125.65.6 MS L- 1000 - 1.00 Btg
5 UNP 140.60.7 MS L- 1000 - 1.00 Btg
6 UNP 150.75.7,5 MS L- 1000 - 1.00 Btg
7 UNP 200.80.7,5 MS L- 1000 - 1.00 Btg
Berat Sat Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
Kg m m' kg Las Rp. Rp.
I MATERIAL
1 CNP 100.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 4.06 0.48
2 CNP 100.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 5.50 0.48
3 CNP 125.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 4.51 0.53
4 CNP 125.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 6.17 0.53
5 CNP 150.50.20.2,3 L- 1000 (MS) - - 1.00 Btg 5.00 0.58
6 CNP 150.50.20.3,2 L- 1000 (MS) - - 1.00 Btg 6.77 0.58
Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m' kg Las Rp. Rp.
I MATERIAL
1 Chk. Plate 2 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 59.00
2 Chk. Plate 3 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 76.96
3 Chk. Plate 3 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 82.09
4 Chk. Plate 4 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 102.62
5 Chk. Plate 5 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 115.44
6 Chk. Plate 5 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 128.27
7 Chk. Plate 6 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 153.92
8 Chk. Plate 8 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 205.23
9 Chk. Plate 9 mm (4'x8') (MS) 1,220 2,440 8,618 1.00 Lbr 230.89
Ttl Luas Pjg las Kwt las Jenis Harga Sat. Total Harga
Vol. Unit
m m' kg Las Rp. Rp.
Date,
Prepared by, Approved by, Aknowledge
Estimator Head of Dept production
( ) Sahono Suwito ( )
36 of 1
PENAWARAN HARGA
Nama Pekerjaan :
Customer : PT.
No. SP D-013
40 micron
40 micron
Gunung Putri, ..
Dibuat oleh,
The torque available at the driven wheel or pulley can be expressed as
where
T = torque (Nm)
F = force (N)
where