COMPARATIVE SCHEDULE OF COSTS

CASE I. FOR INSTALLATION OF BIGASS FANS


LOCATION UNIT WATTAGE USAGE NUVELC DAILY AVE. MONTHLY No. of Total Cost
(4hrs/day O RATE CONSUMPTION CONSUMPTION Units
) COST COST
(20 days/month)
TONUS POWERFOIL 8 1.5 kW 4 P12.00 P 72.00 P 1,440.00 2 P 2,880.00
PLUS 24
GYM
CHAPEL POWERFOIL 8 1.1 kW 4 P12.00 P 52.80 P 1,056.00 1 P 1,056.00
PLUS 18

CASE II. FOR INSTALLATION OF A/C units (inverter type)


TONUS ACU, 5 tonner 5 kW 4 P12.00 P 240.00 P 4,800.00 8 P 38,400.00
GYM
CHAPEL ACU, 5 tonner 5 kW 4 P12.00 P 240.00 P 4,800.00 4 P 19,200.00

Prepared by: Checked: