Você está na página 1de 1

80

5' 5 24 25 26 27 28 29
Owner/Developer

DUR Hospitality
Company Name
40

Diplomatic Quarter -Abdullah bin


Huthafa Al Sahmi Street
Riyadh,Kingdom of Saudi Arabia
P: 966.11.481.6666
F: 966.11.480.1666
20

www.dur.sa
10

Marriott Hotel
0

MATCHLINE
Diplomatic Quarter &
Ma
SEE 1 / A11-L1B DT
108-A
STORE DT
DT
Marriott Executive
-2850 FFL ST-01 LG-311 108-A
Apartments Diplomatic
-2850 FFL -2850 FFL 108-A
-2850 FFL
DS 195 200 DS 140 LG-56 H72
2625 5632 2908 3800 200 DT
H71
Quarter
6- A 2- A
108-A
DS H70
RAMP DN 3A
H69
H68
7800 2300
3510
6825
EQ EQ Design Consultant
788 7500 H67
HOTEL RAMP 3 X 2500
EXIT EQ EQ H66
888 5000
2 X 2500 H65
2199
3688

Y
N'

DRIVEWA
6000
Marina Plaza, Level 10

-
-
5000 M Offices 1004+1006
1675

337 625
7500 EQ E Dubai Marina, Dubai UAE
EQ EQ Q t 971 4 382 5200
3 X 2500
Na 7500 778
LINE OF BUILDING ABOVE 888 PO Box 112955
3 X 2500 EQ EQ
7500
RAMP UP TO RAMP DN FROM HOTEL 3 X 2500 Engineering Consultant
GROUND GROUND ENTRANCE 279
Ted Jacob Engineering Group
4100

150 7787 150 12974 H47 8511


H48 H49
. . Tameem House, Level 16, Tecom
H50 Dubai, UAE
H51
H52 P: 971.4.450.3999
H53 7500 .
676
Pa H54 3 X 250

5500
0
H55 EQ EQ
Landscape Architect

PERKINS+WILL
4400

H56 Marina Plaza, Offices 1004+1006


30450

2500
H01 H57 Dubai Marina, Dubai UAE
H58 P: 971.4.382.5200
.
H46 H45 H44 H59 N
Qa H43

1000
H42 H60
H41
H40

5500
H39
H02
H38
244 H37
7500
EQ EQ H36
3 X 2500
578 7500
H35
3 X 2500 EQ EQ
515 5000 H34
P
8500

H03

7732
LINE OF LIGHTWELL ABOVE 2 X 2500 2780 H33
428
H32
7500
H31
EQ EQ

Y
DRIVEWA
6000
H04 556
7500
5000 335 151 343 SPEED HUMP
3 X 2500 7500
3 X 2500
EQ EQ (REFER TO CIVIL DRAWINGS) EQ E
Q
7500 343
Q
200

Ra 4575
-2850 FL
3 X 2500 EQ EQ
5000 PETROL / OIL INTERCEPTORS
558
OIL/PETROL INTERCEPTER
ELEC. 3 X 2500 (REFER TO STRUCTURAL AND (REFER TO MECHANICAL AND
2644 STRUCTURAL DRAWINGS
2359

ROOM DS
169 MECHANICAL DRAWINGS)
LG-162 7- A
7500
190 190

-2850 FFL H05 H06 333 SUMP PITT


H07 3 X 2500
200
4950

H08 EQ EQ
4865

4090 H09 (REFER TO STRUCTURAL AND


H10 SUMP PIT (REFER TO
H11 MECHANICAL DRAWINGS)

5500
IT ROOM
DS
7- A
H12 75 00 MECHANICAL AND
H13
2525

LG-163 3 X 250
0 341 STRUCTURAL DRAWINGS
H14
-2850 FFL
275 14101 220 DA EQ EQ
H15
Sa 20- A
7500
275

H16
H17 3 X 25
00
H18 EQ
3503

H19
LA-10
LA-9 H20
H21
C D E

.07

DA R
237

H22
7037

H23
-2900 FFL

H
3545

1
A04-51
B F
460
0

DB
A G
300

4400 S
5800

CARPARK
4971

EXTRACT
LG-164 N
Qibla
DC
300

3
3183 212.9
3200

DD For
Construction
MARCH, 2016
5800

Revisions
DE

4150 2.67
2.09
2.09

2.09

2.10
1 FOR CONSTRUCTION MARCH16
5' 5 24 25' O FOR CONSTRUCTION 24NOV15

26' 2.10 NO ISSUE DATE


Sheet Information
27' Job Number 213433
2.10
28' Drawn VS
Checked SJ
29'
c:\temp\213433_DIPLOMATIC QUARTER HOTEL- ARCH-DD_MahfouzJ.rvt

Approved LS

Title
30'
LOWER GROUND LEVEL - PART A
1 1 : 100
LOWER GROUND
D1 D2 D3 D4 LEVEL-PART A

SEE 1 / A11-L1G
GENERAL NOTE:
Sheet

MATCHLINE
TO REFERENCE WALL TYPE INFORMATION
1a

A11-L1A
A20-0
3/27/2016 9:36:43 PM

REFER DWG A851-09

FOR ALL FINISHES, REFERENCE ROOM


SPACE NUMBER - Eg. LG-60 TO ROOM FINISH
Issued for Construction
SCHEDULE DWG'S NO'S A65 -01 to -04
Copyright 2012 Perkins+Will

Você também pode gostar