Você está na página 1de 7

Albario Engineering (Pvt) Ltd

SAMPLES SUMMARY REPORT


{Report Samples Sorted by Status}

Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-2 GEN-GBX#1 #1 Gas Turbine Generator Gearbox 26/11/2012 ACTION

Sample 2 Analysis Comment


Results are unsatisfactory. Negligible wear is occurring. Varnishing index is poor and oil cleanliness results are unsatisfactory.
Carry out electrostatic filtration to clean up oil. Resample at a reduced service interval after corrective action to further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-5 GEN-GBX#2 #2 Gas Turbine Generator Gearbox 26/11/2012 ACTION
Sample 5 Analysis Comment
Results are unsatisfactory. Negligible wear is occurring. Varnishing index is poor and oil cleanliness results are unsatisfactory.
Carry out electrostatic filtration to clean up oil. Resample at a reduced service interval after corrective action to further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-7 GT #3 Gas Turbine 26/11/2012 ACTION
Sample 7 Analysis Comment
Results are unsatisfactory. Negligible wear is occurring. Oil cleanliness results are unsatisfactory. As wear remains negligible,
this may indicate contamination via sampling. Advise evaluating sampling procedures. Resample at a reduced service interval to
further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-8 GEN-GBX#3 #3 Gas Turbine Generator Gearbox 26/11/2012 ACTION
Sample 8 Analysis Comment
Results are unsatisfactory. Negligible wear is occurring. Varnishing index is poor and oil cleanliness results are unsatisfactory.
Carry out electrostatic filtration to clean up oil. Resample at a reduced service interval after corrective action to further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-9 HYS#3 Hydraulic Starter #3 26/11/2012 ACTION
Sample 9 Analysis Comment
Results are unsatisfactory. Negligible wear is occurring. Oil cleanliness results are unsatisfactory. As wear remains negligible,
this may indicate contamination via sampling. Advise evaluating sampling procedures. Resample at a reduced service interval to
further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-13 FGC#1 #1 Fuel Gas Compressor 26/11/2012 ACTION
Sample 13 Analysis Comment
Results are unsatisfactory. Negligible wear is occurring. Oil cleanliness results are unsatisfactory. As wear remains negligible,
this may indicate contamination via sampling. Advise evaluating sampling procedures. Resample at a reduced service interval to
further monitor.

Page 1
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-24 P3010A Gas Turbine No 3 Boiler Feed Pump 26/11/2012 ACTION
"A" Drive End

Sample 24 Analysis Comment


Results are unsatisfactory. Sample contains >1.0% emulsified moisture. Change oil ASAP. Flush system before recharging.
Inspect for source of moisture ingress and rectify. Resample at a reduced service interval after corrective action to further
monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-48 P5210A Raw Water Pump A 26/11/2012 MONITOR

Sample 48 Analysis Comment


Equipment requires monitoring. Viscosity is high for specified oil type. Check recorded viscosity against OEM recommendations.
Resample at a reduced service interval to further monitor.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-1 GT #1 Gas Turbine 26/11/2012 SATISFACTORY

Sample 1 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-3 HYS#1 Hydraulic Starter #1 26/11/2012 SATISFACTORY
Sample 3 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-4 GT #2 Gas Turbine 26/11/2012 SATISFACTORY
Sample 4 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-6 HYS#2 Hydraulic Starter #2 26/11/2012 SATISFACTORY
Sample 6 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-10 ACOMP#1 Air Compressor #1 26/11/2012 SATISFACTORY
Sample 10 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-11 ACOMP#2 Air Compressor #2 26/11/2012 SATISFACTORY
Sample 11 Analysis Comment
Results are generally satisfactory.

Page 2
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-12 ST Steam Turbine 26/11/2012 SATISFACTORY

Sample 12 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-14 EDFP Emergency Diesel Fire Pump 26/11/2012 SATISFACTORY

Sample 14 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-15 BSD Black Start Diesel 26/11/2012 SATISFACTORY
Sample 15 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-16 P1010A Gas Turbine No 1 Boiler Feed Pump 26/11/2012 SATISFACTORY
"A" Drive End
Sample 16 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-17 P1010A Gas Turbine No 1 Boiler Feed Pump 26/11/2012 SATISFACTORY
"A" Non Drive En
Sample 17 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-18 P1010B Gas Turbine No 1 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Drive End
Sample 18 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-19 P1010B Gas Turbine No 1 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Non Drive En
Sample 19 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-20 P2010A Gas Turbine No 2 Boiler Feed Pump 26/11/2012 SATISFACTORY
"A" Drive End
Sample 20 Analysis Comment
Results are generally satisfactory.

Page 3
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-21 P2010A Gas Turbine No 2 Boiler Feed Pump 26/11/2012 SATISFACTORY
"A" Non Drive En

Sample 21 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-22 P2010B Gas Turbine No 2 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Drive End

Sample 22 Analysis Comment


Results are generally satisfactory. Previous high moisture content not present in sample.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-23 P2010B Gas Turbine No 2 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Non Drive En
Sample 23 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-25 P3010A Gas Turbine No 3 Boiler Feed Pump 26/11/2012 SATISFACTORY
"A" Non Drive En
Sample 25 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-26 P3010B Gas Turbine No 3 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Drive End

Sample 26 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-27 P3010B Gas Turbine No 3 Boiler Feed Pump 26/11/2012 SATISFACTORY
"B" Non Drive En
Sample 27 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-28 P5510A Machinery Cooling Water Pump A 26/11/2012 SATISFACTORY
Sample 28 Analysis Comment
Results are generally satisfactory. Viscosity results are more typical of an ISO 46 grade oil. Check recorded viscosity against
OEM recommendations.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-29 P5510B Machinery Cooling Water Pump B 26/11/2012 SATISFACTORY
Sample 29 Analysis Comment
Results are generally satisfactory.

Page 4
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-30 T0254-F18 (A1) Fin Fan Gearbox F18 26/11/2012 SATISFACTORY

Sample 30 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-31 T0254-F19 (A2) Fin Fan Gearbox F19 26/11/2012 SATISFACTORY

Sample 31 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-32 T0254-F20 (A3) Fin Fan Gearbox F20 26/11/2012 SATISFACTORY
Sample 32 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-33 T0254-F21 (A4) Fin Fan Gearbox F21 26/11/2012 SATISFACTORY
Sample 33 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-34 T0254-F22 (B1) Fin Fan Gearbox F22 26/11/2012 SATISFACTORY
Sample 34 Analysis Comment
Results are generally satisfactory. Increase in ferrous wear and PQ index noted.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-35 T0254-F23 (B2) Fin Fan Gearbox F23 26/11/2012 SATISFACTORY
Sample 35 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-36 T0254-F24 (B3) Fin Fan Gearbox F24 26/11/2012 SATISFACTORY

Sample 36 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-37 T0254-F25 (B4) Fin Fan Gearbox F25 26/11/2012 SATISFACTORY

Sample 37 Analysis Comment


Results are generally satisfactory.

Page 5
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-38 ML5721A Phosphate Pump "A" 26/11/2012 SATISFACTORY

Sample 38 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-39 ML5710B Elimin-Ox Deoxygenation Pump "A" 26/11/2012 SATISFACTORY

Sample 39 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-40 ML5721A Phosphate Pump "B" 26/11/2012 SATISFACTORY
Sample 40 Analysis Comment
Results are generally satisfactory. Oil appears to have been changed/topped up.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-41 ML5710B Elimin-Ox Deoxygenation Pump "B" 26/11/2012 SATISFACTORY
Sample 41 Analysis Comment
Results are generally satisfactory. Increase in PQ index noted.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-42 ML5721A Phosphate Pump "C" 26/11/2012 SATISFACTORY
Sample 42 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-43 ML5710B Elimin-Ox Deoxygenation Pump "C" 26/11/2012 SATISFACTORY
Sample 43 Analysis Comment
Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-44 5110A Fuel Oil Pump Gearbox "A" 26/11/2012 SATISFACTORY

Sample 44 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-45 5110B Fuel Oil Pump Gearbox "B" 26/11/2012 SATISFACTORY

Sample 45 Analysis Comment


Results are generally satisfactory.

Page 6
Date Received: 12/12/2012 Site: Habibullah Coastal Power Plant Job No.: PG84234

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-46 P5220A Demineralised Water Pump A 26/11/2012 SATISFACTORY

Sample 46 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-47 P5220B Demineralised Water Pump B 26/11/2012 SATISFACTORY

Sample 47 Analysis Comment


Results are generally satisfactory.

Lab Reference Eq. Code Eq. Description Date Sampled Oil Status
PG84234-49 P5210B Raw Water Pump B 26/11/2012 SATISFACTORY
Sample 49 Analysis Comment
Results are generally satisfactory.

Page 7