Escolar Documentos
Profissional Documentos
Cultura Documentos
= = 10.52632
= =
1.732
1000
= 0.5
1.732 11
= .
=
1000
=
1.732
1000
= 10.52632
1.732 11
= .
1000
= = 0.5
1.732 0.433
= .
1
Engr. Qazi Arsalan hamid [PRACTICAL PROTECTION ENGINEERING BASIC]
=
1000
= 10.52632
1.732 0.433
= .
CT Ratios:
= 26.24
= 120% 26.24
= 31.488
CT ratio is 200/1, pick up at relay will be
.
>= = = . .
= 552.5
552.5
= = = 17.5
120 % 31.488
If our time grading is 0.3sec, and our expected tripping
time is 0.3sec also (which means our t=0.6sec), our
2
Engr. Qazi Arsalan hamid [PRACTICAL PROTECTION ENGINEERING BASIC]
3
Engr. Qazi Arsalan hamid [PRACTICAL PROTECTION ENGINEERING BASIC]
At 200/1,
.
>= = = .
=
20%
552.5
= = 52.639
40% 26.24
0.14
= 0.02
1
0.14
0.6 =
52.6390.02 1
= 0.35355
Instantaneous setting for earth fault will be 5 times of
PSM
= 5 52.639
= 263.1955
CT Ratio is 200/1,
.
= = .