REFERENCE ARCHITECTURE
PROJECT:
MEAT PROCESSING COMPANY
CONTRACTOR:
AMDH SL
ARCHITECT:
JOANA LUARI
Street. Konferenca e Pezes
ish Misto Mame
Tirana Albania
email: mitar.martinovic1@gmail.com
email: arstroka@gmail.com
email: joanaluari@hotmail.com
REFERENCE ARCHITECTURE
ARCHITECT:
JOANA LUARI
1. PRESENT SITUATION
The design task aims to project a Meat Processing factory. The facility location
of the industrial building is chosen in Sierra Leone, Africa. The area is about 850 m2.
The place is placed near a powerful car axis, easy reachable to other businesses and
people and has a flat relief which is very helpful to be worked on.
The selected industry is not heavy industry, so it fulfills the condition defined
by urban planning studies for the area as a zone of light industry, food.
Entrance to the area is placed to the east, through secondary road surrounding
the square, perpendicular to the main road, so that vehicular heavy tonnage does not
affect traffic into the city.
The factory is placed in the ground floor and has the relevant dimension : 20 x
40 m. The administration is placed in the second floor, 20x 10 m.
In the coverings and cladding of the building will be used Ital PANNELLI, in
light color, white to be more explicit.
The social part, it is based on norms and conditions, which are present below:
In the factory will be working X workers and labor will be organised in 2 times.
80% of the labors will be females, 20% males.
The mense is projected for 10 people and is thought te be in the first floor.
Administration area is projected for two offices, administrator room, meeting room,
three toilets and three bedrooms with toilets inside.
For the above data I'm based on the manual of Ernst Neufert.
VENTILATION
As mentioned above, ventilation is provided by an intern system for the factory, and
the administration ventilation is achieved through openings in the facade of glass.
Lighting
This industry needs an average lighting after not do fine work. This is achieved
through large windows horizontal light scattering in a uniform shape.
REMOVAL OF WATER
Removal of water is realized through pvc tubes placed in coverage which are placed
inside the columns, and that the discharge water at the base and then to city network.
In the social facilities, the roof slope goes 8% which carries collections of rain water
in the gutters located at the corner of roof.
HEAT
Heating of the premises performed through the boiler placed in the north-eastern part
of the plot.
In the areas of vertical movement, except the stairs are designed with sloping Pandus
7% for the movement of persons with veanta.
Water supply is realized through the city water network, and through a water
reservoir.
CONTRACTOR ARCHITECT