Você está na página 1de 4

JOB SAFE PRACTICES (JSPS) (5.19.3 /5.

20)

Job Safe Practices (JSPs) No. ( JSP 08 )


Page 1 of 4

Company / Dept/ Division: HHI/ Comm Employee Job /Profession: HSE Officer Task: Overhead crane operation

Job Safe Practices Analysis HAZARDS


CONTROL
IN EACH STEP, WHAT COULD
REQUIRED TO OBSERVATION
STEP# List All Steps in Performing this task CAUSE INJURY, LOSS, DAMAGE
MINIMIZE/ELIMINATE HAZARD
INTERRUPTION, OR POLLUTION?
1. Setting up of crane at location. Access could be obstructed by Coordinate with the client
other temporary facilities or and other subcontractor
activities. those are working near.
Make sure the crane is
Improper setup of crane. capable to bear the force
while lifting of load.
Make sure the swing radius
of crane is not obstructing
the facilities which are
nearby.
2. Lifting of load for installation. Crane could be overrun due to For heavy lifting means a
overload. load is weighted more than
40 ton or the capacity of
crane is exceeding 85%
should be done under
engineering lift procedure.
The weight of the load
should be identified before
do the lifting and be ensured
the crane is ok to lift.
If the weight of the
equipment is unknown than
a trial lift should be done to
identify the weight of
equipment.
Crane capacity must be
calculated at the maximum
radius of lift and make sure
its below 85% of cranes
Job Safety Practices (JSPs) Form: Rev.1
JOB SAFE PRACTICES (JSPS) (5.19.3 /5.20)

rated capacity.
The lifting gears may break during Select right lifting gear for
the lift or hoisting period. the job; consider the lifting
lug and the situation of
lifting field.
The lifting gears must have
an SWL which is greater than
the weight of load
(Equipment).
Inspect the lifting gears
before start rigging.
Install softeners in between
sling and sharp edges of
load if the sling passes
through any sharp edges.
3. Pick and Carry of load The load could be fall The lifting area must be
properly isolated till the
erection point.
No one is allowed to stand
under suspended load.
Crane could overturn The surface must not be
uneven where the crane has
to move on.
Dont move ahead on a
descending slope.
Damage to underground facilities Plant map should be
reviewed to identify the
buried facilities.
Thick metal plate must put
on the surface where
underground facilities are
there.
4. Swinging of boom The load could be hit any facilities Rigging supervisor or riggers
which are nearby. must make sure the swing
radius of crane is free from
any kind of obstruction.
Only the assigned rigger
must organize the lifting.
Job Safety Practices (JSPs) Form: Rev.1
JOB SAFE PRACTICES (JSPS) (5.19.3 /5.20)

The riggers must do signal


the crane by foreseeing the
final installation point.
The crane operator should
not make a move without
any signal from the
respective rigger.
Sufficient number of tag line
must be installed to control
the load.
The load could be fall during the Make sure all safety latches
hoisting period. in hook block and chain
blocks are properly put in.
The lifting radius should be
isolated with barricades and
signs be posted.
Only the personal involved in
the lifting and erection work
stay in the working area.
Never stand or work under
suspended load at any
reason.
5. Holding of suspended load for installation. The load could be fall from the Isolate the area below the
installation point. installation point.
Only assigned workers must
be in the installation point.
Never stand or work under
suspended load.

SAFETY EQUIPMENT REQUIRED TO DO THIS JOB


Hard Hats? Hearing Protection? ________ Barricades Other (List):
Safety Shoes Work Vests? Fire Extinguisher _______________________________________________
Safety Goggles( Safety Harness? ________ Lock-Out Tag Out ________ _________________________________.
Face Shield? ________ Cotton Gloves Hot Work Permit? ________
Leather Gloves? ________ ________ Entry Permit? ________

LAST REVIEW DATE: REVISION NO.01

Job Safety Practices (JSPs) Form: Rev.1


JOB SAFE PRACTICES (JSPS) (5.19.3 /5.20)

NEST REVIEW DATE:


COMPILED BY: DATE:
ADOPTED BY (SUPERVISOR): DATE:
APPROVED BY (MANAGER): DATE:

Job Safety Practices (JSPs) Form: Rev.1