Você está na página 1de 4

JENAN REAL ESTATE COMPANY - AL KHOBAR

INITIAL INFRASTRUCTURE REPAIRING/REMAINING & FINAL INFRASTRUCTURE WORKS

S.No ITEM DESCRIPTION Unit QTY U/Rate Amount

A INITIAL INFRA REPAIR WORKS


Supply and install sewer house connection cover frame as per approved
material all supplementary inclusive in ddition to up right extension of 6 "
A1 Nos 228 600 136,800.00
pipe as per approved material and any works deemed necessary to
finalize this job duly.

Supply and install inspection chamber cover frame as per approved


material to adjust the shallow elevation of the existing cover frame to the
A2 walk way designed elevation - demolition for the existing one, conc. Nos 16 1850 29,600.00
material and the additional wall height are inclusive in addition to any
supplementary works deemed necessary to finalize this job duly

Demolish the existing sewer manhole cover frame and cut the manhole
body to attain the required elevation- supply and install sewer manhole
A3 Nos 16 1850 29,600.00
cover frame / manhole neck as per approved material and the approve
method , all inclusive concrete; insulation and etc...

Supply and install 32 mm HDPE pipe as per approved material and


A4 required length to replace damaged potable water house connection - Nos 129 600 77,400.00
all fitting and accessories inclusive in order to finalize this job duly

Supply and install sewer inspection chamber cover frame as per


approved material to replace the damaged one, final finish elevation of
the walk shall be followed as per elevation design, conc. and additional
A5 Nos 8 1850 14,800.00
wall height are inclusive as per required - in addition to demolition for
the existing cover frame and any supplementary works deemed
necessary to finalize this job duly

Supply and install the potable water direct buried gate valve's cover
A6 frame and the related sleeve as required, all supplementary works are Nos 5 2500 12,500.00
inclusive which deemed necessary to finalize this job duly

Supply and replace blocked/ damaged telecommunication PVC sleeve


as per approved material - including identifying the blocked sleeve,
A7 excavation , replacing the sleeve, sand bedding, backfilling, warning tape Lm 4000 68 272,000.00
and compaction - all supplementary works, fitting and accessories are
inclusive which deemed necessary to finalize the job duly

Replace the damaged parts of the street lighting cable as required - type
4*25mm cu/xlpe/swa/pvc - including identifying the failure/ cut by mugger
A8 test or whatever , sand bedding, lay down the cables , backfilling, Lm 3000 125 375,000.00
warning tape , compaction, mugger test, and municipality handing over
inclusive- cable supply not inclusive

Adjusting / replacing the misaligned / damaged pole light foundation as


A9 per required- all material and supplementary works are inclusive which Nos 158 250 39,500.00
deemed necessary to finalize this job duly under municipality jurisdiction

1/6 Page Collection Carried to Summary 987,200.00

Adjust unplumbed fire hydrants as required - all material and


A10 supplementary works are inclusive which deemed necessary to finalize Nos 2 1250 2,500.00
this job duly
Adjust unplumbed guard stile and rail of fire hydrants as required - all
A11 material and supplementary works are inclusive which deemed Nos 2 1200 2,400.00
necessary to finalize the job duly

Supply and install the fire hydrant direct buried gate valve's cover frame
A12 and the related sleeve as required, all supplementary works are inclusive Nos 3 2500 7,500.00
which deemed necessary to finalize this job duly

Scrubbing the internal road existing base course up to the required level
and supply aggregate base as per required in order to attain the
A13 designated compressive strength as per municipality requirements, lab m 41000 23 943,000.00
test inclusive - all unused material shall be carting away from site to an
approved dumping site

A14 Lift station steel gate height/ elevation to be adjusted as required LS 1 2500 2,500.00

B INITIAL INFRA REMAIN WORKS

Asphalting for lift station: supply and apply 2 nos of 5.0 cm asphalt layers
- wearing course and binder course including base course final grading
B1 to the required level / soil improvement as required, tack coats, marking LS 1 95 95.00
and any supplementary works deemed necessary to finalize the job duly
are inclusive

Odor control system termination and commissioning as per required - all


B2 LS 1 2200 2,200.00
inclusive

asphalting for booster pump station: supply and apply 2 nos of 5.0 cm
asphalt layers - wearing course and binder course including base course
B3 final grading to the required level / soil improvement as required, tack LS 1 22000 22,000.00
coats, marking and any supplementary works deemed necessary to
finalize the job duly are inclusive

5 cm initial asphalting for internal roads, tack coat and surface


preparation are inclusive considering the designed surface drainage run
B4 m 41000 22 902,000.00
off and any items deemed necessary to finalize this item duly under
municipality jurisdiction

Supply and install street lighting control panel set 400/230v - 100 amp w/
B5 Nos 2 32000 64,000.00
photo cell - all inclusive termination, testing, support and etc.

Backfilling &compaction for parcel "d" as per the approved engineering


B6 m 18920 14 264,880.00
methodology
Electric House Connection: Installation of cable 4 core 70 mm &
Electrical Meter of 150 amp, cable termination to both feeder pillar &
B7 electric meter. The work shall include excavation, backfilling, sand Nos 228 750 171,000.00
supply, warning tape and any items deemed necessary to finalize the
job duly- cable and electric meter are excluded.
install pole light foundation as per approved design and municipality
B8 Nos 2 1200 2,400.00
criteria

2/6 Page Collection Carried to Summary 2,386,475.00

Provide reinforced concrete and lean concrete cast in situ as required for
RMU support foundation as per approved design and concrete design
B9 mix, RMU mounting inclusive as per approved method under SCECO LS 1 8000 8,000.00
jurisdiction, all supplementary works and material are inclusive which
deemed necessary to finalize the job duly.

Extend mv cable type 3 core 300 mm from defined RMU's at parcel "d"
to parcel "e" - excavation; sand bidding ; warning tap; backfilling;
B10 Lm 800 600 480,000.00
required duct bank; cable termination for all terminals are inclusive
excluding mv cable supply.

C FINAL INFRASTRUCTURE WORKS:

Supply and install interlocking tiles set on sand bed as per approved
C1 section. Work shall include all required material, backfilling to attain the m 10000 65 650,000.00
designed level, compaction, pointing and joints inclusive

Supply and Lay Concrete walkway broom finish as per municipality


requirements. Work shall include all required material, backfilling to
C2 m 28000 56 1,568,000.00
attain the designed level, compaction, rendering, joints and curing
inclusive

Supply and Install Concrete Curb Stone as per municipality


C3 requirements. Work shall include all required material, concrete bed , Lm 8000 80 640,000.00
backfilling to attain the designed level, compaction, pointing inclusive

Supply and Installation of 5 cm thk final asphalting for internal roads.


C4 Work shall include tack coat inclusive and supplementary items deemed m 41000 65 2,665,000.00
necessary to finalize this item duly under municipality jurisdiction

Interlocking tiles crossing humps all material, sand bidding, concrete


C5 works, curbs, compaction, asphalting and over side drain as required are Nos 3 18500 55,500.00
inclusive

Road Traffic Signage and Street Names: 0.00

Supply and Installation of Stop signage as per the drawings. Work shall
C6 include complete sign with post, accessories, concrete found & Nos 60 600 36,000.00
supplementary works to finalize the job duly.

Supply and Installation of Parking signage as per the drawings and


C7 specifications. Work shall include complete sign with post, accessories, Nos 8 1200 9,600.00
concrete foundation & supplementary works to finalize the job duly.

Initial Infra Repair-Remaining Final Infra Tender BOQ (Rev.02) 1 Of 4 Initial Infra Remaining/Reparing Final Infra Works
JENAN REAL ESTATE COMPANY - AL KHOBAR
INITIAL INFRASTRUCTURE REPAIRING/REMAINING & FINAL INFRASTRUCTURE WORKS

S.No ITEM DESCRIPTION Unit QTY U/Rate Amount

Supply and Installation of Speed limit signage as per the drawings and
C8 specifications. Work shall include complete sign with post, accessories, Nos 56 850 47,600.00
concrete foundation & supplementary works to finalize the job duly.

Supply and Installation of Pedestrian crossing signage as per the


drawings and specifications. Work shall include complete sign with
C9 Nos 73 850 62,050.00
post,. accessories, concrete foundation & supplementary works to
finalize the job duly.

3/6 Page Collection Carried to Summary 6,221,750.00

Supply and Installation of Handicapped signage as per the drawings and


C10 specifications. Work shall include complete sign with post, accessories, Nos 17 850 14,450.00
concrete foundation & supplementary works to finalize the job duly.

Initial Infra Repair-Remaining Final Infra Tender BOQ (Rev.02) 2 Of 4 Initial Infra Remaining/Reparing Final Infra Works
JENAN REAL ESTATE COMPANY - AL KHOBAR
INITIAL INFRASTRUCTURE REPAIRING/REMAINING & FINAL INFRASTRUCTURE WORKS

S.No ITEM DESCRIPTION Unit QTY U/Rate Amount

Supply and Installation of Turn signage as per the drawings and


C11 specifications. Work shall include complete sign with post, accessories, Nos 4 850 3,400.00
concrete foundation & supplementary works to finalize the job duly.

Supply and Installation of Street names as per the drawings and


C12 specifications. Work shall include complete sign with post, accessories, Nos 60 2500 150,000.00
concrete foundation & supplementary works to finalize the job duly.

Supply and Installation of Garden signage as per the drawings and


C13 specifications. Work shall include complete sign with post, accessories, LS 1 850 850.00
concert foundation & supplementary to finalize the job duly

Supply and Installation of House Number Plate complete one as per as


C14 per the drawings and Municipality specifications. Work shall include all Nos 228 220 50,160.00
necessary accessories to complete.

Supply and Installation of Provide steel bollards as per the drawings and
C15 specifications. Work shall include all supplementary works inclusive Nos 85 620 52,700.00
which deemed necessary to finalize the job duly

Supply and Installation of Handicapped interlocking tiles' as per the


C16 drawings and specifications. Work shall include ramps, material, sand Nos 17 600 10,200.00
bed, curbs and compaction

Supply and Installation of Handicapped concrete ramps broom finish as


C17 per the drawings and specifications. Work shall include all material sand Nos 100 600 60,000.00
bed, curbs and compaction

Supply and Installation of Wheel stopper as per the drawings and


C18 specifications. Work shall include all supplementary works and material Nos 40 1200 48,000.00
are inclusive to finalize the job duly

Supply and Installation of Thermoplastic pavement marking as per the


C19 Lm 110 280 30,800.00
drawings and specifications.

Supply and Installation of Cat Eyes Reflective Tiles as per the drawings
C20 and specifications. Work shall include all supplementary materials as Nos 610 180 109,800.00
required to complete the works.
Installation of lot water meter as per the drawings and specifications.
Work shall include connecting to the existing potable pipe supply
C21 Nos 228 420 95,760.00
inclusive in addition to pipe extension, fittings as needed & accessories -
water meter supply excluded

Supply and installation of Lighting Poles 8 m height, single arm, bulb 250
watt metal halide w/ enclosure and all accessories as required are
C22 Nos 26 8000 208,000.00
inclusive under municipality jurisdiction as per approved design,
termination, testing and commissioning inclusive

4/6 Page Collection Carried to Summary 834,120.00

Supply and installation of Lighting Poles 10 m height, single arms, bulb


400 watt metal halide w/ enclosure and all accessories as required are
C23 Nos 118 10000 1,180,000.00
inclusive under municipality jurisdiction as per approved design,
termination and commissioning inclusive

Supply and installation of Lighting Pole 12 m height, double arm, single


bulb 400 watt sodium w/ enclosure and all accessories as required are
C24 Nos 9 12000 108,000.00
inclusive under municipality jurisdiction as per approved design,
termination, testing and commissioning inclusive

Supply and Install of Lighting Pole 16 m height, double arm, single bulb
600 watt sodium w/ enclosure and all accessories as required are
C25 inclusive under municipality jurisdiction as per approved design, Nos 7 16000 112,000.00
termination, testing and commissioning inclusive

5/6 Page Collection Carried to Summary 1,400,000.00

SUMMARY:

Collect of Page 1 of 5 987,200.00

Collect of Page 2 of 5 2,386,475.00

Collect of Page 3 of 5 6,221,750.00

Collect of Page 4 of 5 834,120.00

Collect of Page 5 of 5 1,400,000.00

Initial Infra Repair-Remaining Final Infra Tender BOQ (Rev.02) 3 Of 4 Initial Infra Remaining/Reparing Final Infra Works
JENAN REAL ESTATE COMPANY - AL KHOBAR
INITIAL INFRASTRUCTURE REPAIRING/REMAINING & FINAL INFRASTRUCTURE WORKS

S.No ITEM DESCRIPTION Unit QTY U/Rate Amount

6/6 Page Collection Carried to Contract 11,829,545.00

Initial Infra Repair-Remaining Final Infra Tender BOQ (Rev.02) 4 Of 4 Initial Infra Remaining/Reparing Final Infra Works

Você também pode gostar