R.L (M&E) CHECKLIST
Project No. :
eS
Project Title:
es
FIRE PROTECTION - DRY RISER SYSTEM
BREECHING INLET :
Location according to plan/within 18m from fire engine access
2 way inlet provided (100 mm diameter riser pipe)
4 way inlet provided (50 mm diameter riser pipe)
About 760 mm above finished floor level
Tnlets housed in glass fronted box
Rigidly supported
Labelled “DRY RISER BREECHING INLET” and differentiated (if
‘more than 1 stack)
Clear of obstruction
Inlet painted yellow colour
RISER
Pipe size in order
2a. | Diameter 100 mm (ht of bldg < 45mm)
2,_ | Diameter 150 mm (ht of bldg > 6Om but > 45m)
3. _| Not passing through unprotected area/fre ated
4. _| Airtelease valve provided
5.__| Barthing provided
¥(F- compy, x des nat comply, NA not appicabIy
we] so]
Inspected By : Signature:
Date :
estas)
»WSP-NgProject No.
Project Title
RL (M&E) CHECKLIST
FIRE PROTECTION - DRY RISER SYSTEM (Cont'd)
LANDING VALVE
SS
1
760 mm to 1m above finished floor level
Condition of handwheel satisfactory
Cap provided
Strapped & padlocked in closed position
Labelled / Numbered
Clear of obstruction
Landing valve painted yellow colour
2
3.
4
5.
6
7.
D
‘TESTING OF HYDROSTATIC PRESSURE
Pressure constant at 300 psi /20.7 bar at more than 30 mins
3200p fr Ahes
a
Air release valve functioning
* (7 eoimy, X= does not comply, NA not appicabley
Inspected By :
Date
Signature
uc st99sRMs()
BWSP-Ng