PARTIDAS A EJECUTAR
02.02.00 EXCAVACION PARA ZAPATAS HASTA 1.00 MT, DE PROFUNDIDAD M3 45.47 29.90 1,359.55
02.03.00 ELIMINAC. MATER. EXCED. HASTA 30.00 MT(A MANO USANDO CARR.) M3 85.70 19.96 1710.572
03.03.00 CONCRETO SOBRECIMIENTO 1:8 CEM-HORM.25% P.M. ANCHO=.15 MT. M3 7.84 315.00 2,469.60
03.04.00 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORM. 30% PIEDRA M3 45.20 194.28 8,781.46
04.03.00 COLUMNAS
04.05.03 ACERO ESTRUCTURAL EN LOSA ALIGERADA, Fy = 4,200 Kg/Cm2 KG 3,537.48 4.80 16,979.90
04.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGER. UND 2,976.00 2.10 6,249.60
04.04.00 ESCALERAS
05.00.00 MAMPOSTERIA
05.01.00 MURO DE SOGA, CON CEMENTO-ARENA = 1:5, J = 1.5 CM. M2 925.20 38.00 35,157.60
06.00.00 CISTERNA
06.01.00 CONCRETO EN CISTERNA, F'C=210 KG/CM2 M3 5.80 315.00 1,827.00
07.06.00 TARRAJEO DE SUPERFICIE EN VIGAS C/MORTERO 1.5x1.5 (INC. COLUMNAS M2 256.42 18.50 4,743.77
07.05.00 TARRAJEO EN COLUMNAS C/MORTERO 15x15 (INC. COLUMNAS EMP.) M2 95.08 18.50 1,758.98
08.00.00 CIELORRASOS
08.01.00 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 379.80 28.65 10,881.27
09.00.00 ZOCALOS
09.01.00 ZOCALO DE CERAMICA BLANCA M2 173.88 62.58 10,881.41
10.03.00 PISOS CERAMICOS .40 X .40 DE ALTO TRANSITO M2 348.00 75.00 26,100.00
11.00.00 CARPINTERIA DE MADERA
11.01.00 PUERTA CONTRAPLACADA DE MADERA M2 65.58 165.48 10,852.18
13.00.00 PINTURA
13.01.00 PINTURA LATEX EN CIELO RASO 2 MANOS M2 349.80 5.90 2,063.82
15.02.00 SALIDA DE PVC SAL PARA DESAGUE DE 4" PTO 18.00 37.60 676.80
16.02.00 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" UND 12.00 35.54 426.48
COSTO DIRECTO
Subtotal Total
1,056.00
5,215.21
15,173.06
12,315.13
20,515.87
24,032.96
36,225.63
41,937.50
7,937.45
35,157.60
7,452.63
9,252.25
10,881.27
10,881.41
36,730.80
10,852.18
14,255.75
7,861.02
5,532.00
5,029.09
4,620.67
7,248.74
330,164.22
____________
OVAL LOPEZ