The WBS is a view into the project which shows what work the project encompasses. It is a tool
which helps to easily communicate the work and processes involved to execute the project. The
Project Manager and project team use the WBS to develop the project schedule, resource
requirements and costs. There are many ways you can present the WBS for your project; this
template provides many of the most popular layouts from which you can choose. Depending on
where in the Project Plan you're putting the WBS a different layout may be more suitable for
you. For instance many Project Managers include a high level WBS within the project plan, then
a detailed version as an appendix to the plan. You may find that you prefer one layout for a high
level WBS and a different one for a detailed WBS.
Purchase land
Land is very important to construct the building we have selected the land in Dhook
Hasoo. First of all we have made payment of land to the seller. After which we have
registered the land for the construction of Hospital.
Registration
Prepare drawing
Excavation
Digging of land is very important as the base of foundation is started with digging of
the soil
Leveling of land
We hire the machinery to level the land and paid labor 10/cft.
Prepare boundary wall
Erection of structure
Prepare wall
After completion the main structure of the building we set out the shuttering for linter.
After setting the shuttering for linter machinery is used to filling it.
Plaster of wall
The next step is to plaster the wall so that they came into the finishing phase.
Install Sidings
Install wiring
When the wall is completed from plaster then the next step is to install the wiring
with the help of electrician.
Install Plumbing
At the end steel work has to be completed installation of gate and window should be
done.
Hiring of Staff
Ground Floor
Diagnostic lab
Reception
Billing Department
Blood Bank
Cafeteria
ATM Machine
First Floor
Admin Department
Emergency Department
General Ward
Labor Room
Medicine department
COST SUMMARY
Activity Total Cost
Project Manager 150,000
Project Sponsor 80,000
Civil Cost 90,000
Plumbing Cost 70,000
Electrical cost 90,000
Air Condition Cost 40,00,000
ECG Machine (05) 12,00,000
Central line Oxygen 30,00,00
X-ray Machine (05) 10,00,000
Lab 80,00,000
IT System 50,00,000
Hospital Furniture 1,00,00,000
Cardiac Fowler Bed 20,00,000
Pathology Equipment 12,00,000
Other Material and Medicine 03,00,000
Nurses 1,00,000
Doctors 10,00,000
Security Staff 80,000
Technicians 80,000
Administrative Head 1,00,000
Ambulance Fuel Charges 150,000
Marketing Budget 1,00,000
Land cost 02,00,00,000
Land and Site Development 50,00,000
Labor Cost 3,00,000
Supervisor 90,000
Pharmacy 04,00,000
Other Expenses 03,00,000
Total ????
the need to receive clear explanation and instructions about their condition
thinking that the physician will always know the exact diagnosis at first consultation and
start treatment immediately
Medical practice should be organized around medical conditions and care cycles
They need to be clear as to why further tests and consults are needed
Recognize the value of every person and are guided by our commitment to excellence and
leadership.
Building a work environment where each person is valued, respected and has an opportunity for
personal and professional growth
The commitment of our staff, physicians, volunteers, students, community partners and friends to our
mission permits us to maintain a quality of presence and tradition of caring
https://www.scribd.com/doc/21006481/starting-up-anew-hospital(cost and summary)