Escolar Documentos
Profissional Documentos
Cultura Documentos
Toilet Khusus
2 * **Alami **Buatan
Manager Utama
Ruang Asisten
4 * **Alami **Buatan
Manager
Ruang tiap
5 ** **Alami **Buatan
Manager
Ruang Staff
6 ** **Alami **Buatan
Administrasi
Ruang Kantin
7 ** **Alami **Buatan
Pengelola
8 Toilet Karyawan ** **Alami **Buatan
9 Ruang Rapat ** **Alami **Buatan
11 **Alami **Buatan
Ruang Tunggu ***
Nama Ruang Aksesbilitas Pencahayaan
Kegiatan Servis
Ruang Linen * **Alami **Buatan
Locker/ Ruang
Ganti Pakaian ** *Alami *Buatan
Pegawai
Tata Graha
Gudang House
** *Alami **Buatan
Keeping
Ruang Persediaan
*** *Alami **Buatan
bahan Makanan
Utilitas
Ruang Water
** xAlami *Buatan
Treatment
Ruang IPAL ** **Alami **Buatan
** **NNNNN **NNNNNN
NNNNN NNNNNN
NNNNNNNN ** **NNNNN **NNNNNN
NNNNNNNN
** **NNNNN **NNNNNN
NNNNNN NNNNN
NNNNN NNNNN *** **NNNNN **NNNNNN
** *NNNNN **NNNNNN
NNNN
**Alami
* xKe dalam xKe luar v Private
***Buatan
*Alami **Buatan * xKe dalam xKe luar x Private
**Alami
* xKe dalam xKe luar v Private
***Buatan
Semi
**Alami **Buatan * xKe dalam xKe luar x
Publik
*Alami *Buatan * xKe dalam xKe luar x Private
Kebutuhan Luasan
Ruang Kapasitas Standar Sumber
Ruang (m2)
Standart Room Permen
48 unit 24 m2 1152
Hunian Deluxe Room Permen
24 unit 30 m2 720
Kebutuhan Luasan
Ruang Kapasitas Standar Sumber
Ruang (m2)
Pria =4m2
Toilet Umum 1 Unit DA 9
Wanita =5m2
TS 36
Ruang Shalat 20 Orang 1.8 m2
Musholla
Pria =4m2
1 Unit DA 9
Lavatory Wanita =5m2
TS 6
Tempat Wudhu 2 Unit 3 M2
Jumlah 60
Sirkulasi 30% 18
Jumlah Keseluruhan 78
Ruang Makan
80 Orang 1.5 m2 DA 120
ran
Kasir Staff + Orang 1.2 m2
2 2 DA 4.8
Ruang Saji 1 Unit 4.2 m2 DA 4.2
Dapur 60 Orang/unit 0.7 m2 DA 42
Ruang Cheff 1 Unit 12 m2 DA 12
Restauran
m2
Waste Disposal
60 Orang/2Unit 0.15 DA 9
Gudang Basah
60 Orang/Unit 0.04 m2 DA 2.4
m2
Gudang Kering
60 Orang/Unit 0.25 DA 15
Gudang alat 62 Orang/Unit 0.16 m2 DA 9.92
Cuci Piring 63 Orang/Unit 0.1 m2 DA 6.3
Pria =4m2
Lavatory 1 Unit DA 9
Wanita =5m2
Jumlah 234.62
Sirkulasi 30% 70.4
Jumlah Keseluruhan 305.006
Lobby 70 Orang 1.2 m2 DA 84
Resepsionis &
Staff + Orang 1.2 m2 DA
Reservasi 2 2 4.8
Front Office 6 Orang 1.2 m2 DA 7.2
Bell Boy Station m2 DA
4 Orang 1.2 4.8
Front Office
Ruang Operator Staff + Orang m2 DA
2 2 1.2 4.8
Pria =4m2
Toilet DA 9
1 Unit Wanita =5m2
Lounge Room DA
80 Kamar 0.55 m2 44
Jumlah 158.6
Sirkulasi 30% 47.58
Jumlah keseluruhan 206.18
Kebutuhan Luasan
Ruang Kapasitas Standar Sumber
Ruang (m2)
Ruang Registrasi Staff + Orang 1.2 m2
1 1 DA 2.4
unit untuk 60
Kolam Dewasa 1 m2
orang 70 DA 70
Kolam Anak 20 orang 2 m2 DA 40
4
Kolam Renang
Spot berjemur
dan Santai
10 Orang 1.25 m2 DA 12.5
Ruang Tunggu
10 orang 1.2 m2 DA 12
Ruang Alat 20 orang 0.3 m2 DA 6
Jumlah 181.1
Sirkulasi 30% 54
Jumlah Keseluruhan 235.4
Ruang Registrasi Staff + Orang 1.2 m2
1 1 DA 2.4
Ruang Sauna 120
30 orang 4 M2 DA
Sauna & SPA
4
Ruang Ganti dan Ruang ganti m2/ruang
Locker Locker ganti
2 13 12 m2/locker DA 29.2
Ruang Massage 60
15 orang 4 M2 DA
Pria =4m2
Lavatory 1 Unit DA 9
Wanita =5m2
Jumlah 220.6
Sirkulasi 30% 66.2
Jumlah Keseluruhan 286.8
Ruang Registrasi Staff + Orang 1.2 m2
1 1 DA 2.4
Ruang fitness 25 117.5
Orang 4.7 M2 DA
Fitness Center
Locker 2 Unit 12 M2 DA 24
Pria =4m2
Lavatory 1 Unit DA 9
Wanita =5m2
Jumlah 168.5
Sirkulasi 30% 50.6
Jumlah Keseluruhan 219.05
Audience 60 orang 1.2 m2 HPD 72
Stage area 1 unit 30% Audience HPD 0.3
Ruang Serbaguna
Kebutuhan Luasan
Kapasitas Standar Sumber
Ruang (m2)
Ruang Manager
1 Orang 15 m2 DA 15
Utama
Toilet Khusus
1 unit 1.5 m2 DA 1.5
Manager Utama
Ruang
1 orang 6.7 m2 DA 6.7
Sekretaris
Ruang Asisten
1 orang 15 m2 DA 15
Manager
6 unit 1
unit=1 orang, 1
set meja & kursi,
Ruang tiap sirkulasi 40% 7.28 m2 DA 43.68
Manager
Ruang Staff
5 orang 5 m2 DA 25
Administrasi
Ruang Kantin
DA 54
Pengelola
60 Orang 0.9 M2
Pria =4m2
Toilet Karyawan 1 Unit DA 9
Wanita =5m2
unit untuk 4
Ruang tunggu 1 DA 10
orang 10 m2
Ruang Rapat DA 40
20 Orang 2 m2
Jumlah 219.88
Sirkulasi 30% 66.0
Jumlah Keseluruhan 285.844
Kebutuhan Luasan
Ruang Kapasitas Standar Sumber
Ruang (m2)
Ruang Linen 80 Kamar 0.405 m2 TS 32.4
Ruang Laundry 50.4
80 Kamar 0.63 m2 TS
Ruang Jemur 30
80 Kamar 0.375 m2 TS
Ruang Pegawai 76.8
64 Orang 1.2 m2 DA
Locker/ Ruang
Ganti Pakaian 24
Pegawai
2 Unit 12 m2 DA
Tata Graha
Pantry 1 unit 8 m2 An 8
Gudang Alat 80 Kamar 0.36 m2 TS 28.8
Tata Graha
Ruang House
72
Keeping
80 Kamar 0.9 m2 TS
Gudang House
28.8
Keeping
80 Kamar 0.36 m2 TS
Ruang
Persediaan 28.8
bahan Makanan
80 Kamar 0.36 m2 TS
Ruang
21.6
Penerimaan 80 Kamar 0.27 m2 HDP
Jumlah 401.6
Sirkulasi 30% 120.5
Jumlah Keseluruhan 522.08
Ruang Genset 1 12
Unit 12 m2 An
Ruang Kontrol
1 16
Panel
Unit 16 m2 DA
Ruang PABX 1 15
Unit 15 m2 DA
Ruang Pompa 1 12
Unit 12 m2 An
Utilitas
Ruang Water
1 12
tank Unit 12 m2 An
Ruang Water
1 24
Treatment
Unit 24 m2 An
Ruang IPAL 1 Unit 20 m2 An 20
Shaff Sampah 1 12
Unit 12 m2 An
Ruang Trafo 1 Unit 45 m2 An 45
Ruang Tandon
1 50
Air Unit 50 m2 An
Jumlah 218
Sirkulasi 30% 65.4
Jumlah Keseluruhan 283.4
Pos Satpam 1 Unit 9 M2 An 9
& Keamanan
Kebersihan
CCTV 1 Unit 9 m2 An 9
Garbage Room 21.6
80 Kamar 0.27 m2 HDP
Jumlah 39.6
Sirkulasi 30% 11.9
Jumlah Keseluruhan 51.48
Kebutuhan Luasan
Kapasitas Standar Sumber
Ruang (m2)
38 Mobil 9.5 m2 DA 361
Parkir Tamu 25 Motor 1.54 m2 DA 38.5
Parkir 15 Mobil 9.5 m2 DA 142.5
Pengunjung 11 Motor 1.54 m2 DA 16.94
14
DA 133
Parkir Karyawan Mobil 9.5 m2
58 Motor 1.54 m2 DA 89.32
Jumlah 781.26
Lantai 1
150
584,572,818.88
Basement 1477.14
Parkir basement 1243.64
Utilitas 233.5
Lantai 1 623.99
Outdoor 318.88
Front Office 206.18
Musholla + Toilet umum 78
Ruang Trafo 58.5
PABX 19.5
Kontrol Panel 20.8
Genset 28.08
penerimaan 20.8
rapat 52
skret 8.71
tggu 13
TPS 12
lift lobby 63.42
Lift kantor 43
128
Jumlah
No Bagian Persentase
Karyawan
1 Front Office 13% 17
2 Tata Graha 27% 34
3 Restoran 21% 26
4 Rekreasi dan Olahraga 11% 14
5 Penunjang 1.60% 2
5 Administrasi Kantor 3.6% 5
6 Utilitas 5.5% 7
7 Kebersihan & 7% 8
Keamanan
8 Operator ruang & 2.40% 3
konektivitas
Bellboy 6 orang
Pegawai Restoran
Kasir 2 orang
Barista 2 orang
Pegawai Utilitas
Petugas Mekanikal Elektrikal 3 orang
PENGELOLA
Pelaku Jumlah
Manajer Utama 1 orang
Asisten Manajer 1 orang
Sekretaris 1 orang
Manajer Pemasaran 1 orang
Manajer Personalia 1 orang
Manajer Keuangan 1 orang
Manajer Teknik 1 orang
Manajer Pengadaan Barang 1 orang
Manajer Room Division 1 orang
Total 9 orang
Parkir Tamu Menginap
Jenis Keterangan Perhitungan
Total tamu Menginap 200 orang 200 orang x
75% =
Kapasitas Mobil 4 orang 150 : 4 =
Mobil
Kode
Proyeksi Wisatawan Tahun 2020
Keterangan Total
Tahun 2020
JUMLAH
Parkir Pengunjung
Jenis Keterangan Perhitungan
Total tamu fasilitas 78 orang 78 orang x 75%
rekreasi =
59 : 4 =
Kapasitas Mobil 4 orang
Mobil
tamu menggunakan
Mobil
Parkir Pengelola
Jenis Keterangan Perhitungan
Total pengelola dan 137 137 orang x
pegawai 10% =
Kapasitas Mobil 1 orang
Mobil
137 orang x
10% =
Mobil
Asumsi Prosentase 10%
tamu menggunakan
Mobil
menggunakan mobil
37.5
38 mobil
50
25
25 motor
an Kota Malang
B
B
An
Tn= t(1+I)^n 2,996,970
KMA
KMA
T= OxTn 1,580,902
An
An
= Tn- T 1,416,068
gunjung
Perhitungan Fasilitas Parkir 78
59
15
15 mobil
20
10
10 motor
137
ngelola
Perhitungan Fasilitas Parkir
14
14 mobil
14
14 mobil
115
58
58 motor
No. Jenis Kamar Prosentase Banyak Kapasitas Total
1 Standar 60% 48 2 96
2 Deluxe 30% 24 3 72
3 Suite 10% 8 4 32
Jumlah 200
No. Nama Ruang Aksesbilitas
1 INSTALASI RAWAT JALAN ***
10
Instalasi Rehabilitas Medik
**
11 Instalasi Gizi/Dapur
*
Bagian Administrasi &
12 Kesekretariatan
**
13
KAMAR MAYAT *
14 Fasilitas Tambahan
***
15 Laundry
**
16 Unit Utilitas
*
Unit Staff Medik & Non-Medik
17
*
18 Fasilitas Parkir
***
Pencahayaan Penghawaan Ketenangan View Sanitasi Sifat
**Ke dalam
**Alami **Buatan **Alami **Buatan ** v Air vGas Semi Publik
**Ke Luar
**Ke dalam
**Alami **Buatan xAlami **Buatan ** v Air vGas Semi Publik
**Ke Luar
**Ke dalam
**Alami **Buatan **Alami **Buatan ** v Air vGas Semi Publik
***Ke Luar
**Ke dalam
**Alami **Buatan **Alami **Buatan ** v Air vGas Semi Publik
***Ke Luar
**Ke dalam
**Alami **Buatan **Alami **Buatan ** v Air vGas Semi Publik
***Ke Luar
*Ke dalam **Ke
* v Air vGas Semi Publik
xAlami **Buatan xAlami **Buatan Luar
**Ke dalam
** v Air xGas Semi Publik
*Alami **Buatan xAlami **Buatan **Ke Luar
*Ke dalam **Ke
** v Air xGas Semi Publik
xAlami **Buatan xAlami **Buatan Luar
**Ke dalam
*Alami **Buatan xAlami **Buatan * v Air xGas Privasi
**Ke Luar
**Ke dalam
**Alami **Buatan **Alami **Buatan ** v Air xGas Semi Publik
***Ke Luar
*Ke dalam **Ke
**Alami **Buatan **Alami **Buatan *** v Air xGas Private
Luar
***Ke dalam
**Alami **Buatan **Alami **Buatan *** v Air xGas Semi Publik
**Ke Luar
2020 (Tn)
Tahun 2020
I Persentase 3.11 %
Pertumbuhan Rata-
rata per tahun
6
Jumlah RS
melayani
penyakit paru
dan
pernafasan
2189
Jumlah
Tempat tidur
177992
177.992
yakit paru dan pernafasan 2678
0.031059
Perhitungan: Hasil Sumber
B
B
An
Beban
Beban per luas
Pendingin Daya(watt)
100 m3 (TR)
(TR)
1.5 381.38 427140
1.5 340.5 381360
1.5 196.77 220378.2
1 37.10 41552
1 428.36 479764.8352
1384.10 1550195.0352
% 138.41 155019.50352
1522.51 1705214.54
uhan ruang AHU RS 360.9
kebutuhan listrik pndngn
Standar
Hitungan
Ruang AHU 0.5m2/TR
Beban
Pendingin
per
100m3
ruangan
(TR) kW Daya W
Rumah Sakit 1.5 1.2 1800
hotel 1800
Kebutuhan Air bersih
Air Dingin
Air Panas
Rumah Sakit
Pasien 325 orang 180
Paramedis 171 orang 90
Pengunjung 175 orang 10
Laundry 2275 kg 20
Hotel
dg Bak Mandi (deluxe
& suite) 65 orang 135
dg Shower (Standar) 224 orang 90
Karyawan 128 orang 35
Pengunjung 78 orang 15
kolam renang 80 orang 45
Restoran 556 menu 5
Laundry 660 kg 20
Jumlah
Toleransi 10%
TOTAL
Air-Boiled
Air AC
Standar
Item Satuan Unit
Koefisien
155675
65025
220700
22070
242770
Kebutuhan Air
(liter/hari)
58500
15390
1750
45500
8775
20160
4480
1170
3600
2780
13200
175305
17530.5
192835.5
Kebutuhan Air
(liter/hari)
144369
393532.5
537901.5
53790.15
591691.65
Kebutuhan
Satuan
Air (liter/hari
TR 21924187
Vair-sirkulasi 438483.739
22362671