Escolar Documentos
Profissional Documentos
Cultura Documentos
L= 1200 m
Hbruta = 640 m
D= 1.8 m
n= 0.011
T= 6 s
A= 2.545 m2
Vo = 4.716 m/s
R= 0.450 m
Sf = 0.00780
hf = 9.364 m
Ho = 630.64 m
Determinacin de "a":
K= 2.10E+09 N/m2
E= 2.10E+11 N/m2
D= 1.80 m
e= 0.064 m
rho = 1000 kg/m3
c= 0.85
a= 1300.9 m/s
H1 = psi1^2*Ho =
HT = psiT^2*Ho =
Hmax =
775.69
734.38
775.69 m
T=
'
2T
+
( ' 2
2T ) +1
max = 145.05 m
A= 2.545 m2
R= 0.45 m
V= 4.716 m/s
Sf = 0.00780 2
hf =
Hneta = Ho =
9.36
630.64
m
m
B=
[
L(V o V T )
gH o T ]
Ho = 630.64 m
B=
Hmax/Ho =
Hmax =
Hmax =
0.0232
0.165
103.75 m
734.38 m
H max B
Ho
= + B+
2
B2
4
pmax = 734384.4 kg/m2
73.44 kg/cm2
to = 0.6 cm
St = 1200 kg/cm2
t= 6.11 cm
2.405 pulg ==> 2.5"
A= 4.524 m2
Vo = 3.979 m/s
hf = 3.407 m
Ho = 516.59 m
Determinacin de "a":
K= 2.10E+09 N/m2
E= 2.10E+11 N/m2
D= 2.40 m
e= 0.064 m
rho = 1000 kg/m3
c= 0.85
a= 1260.7 m/s
( '2T ) +1
2
H1 = psi1^2*Ho = 582.04 '
T= +
HT = psiT^2*Ho = 564.28 2T
Hmax = 582.04 m
max = 65.44 m
A= 4.524 m2
R= 0.60 m
V= 3.979 m/s
Sf = 0.00379 2
hf =
Hneta =
3.41
516.59
m
m
B=
[
L(V o V T )
gH o T ]
Ho = 516.59 m
B=
Hmax/Ho =
Hmax =
Hmax =
0.0078
0.092
47.69 m
564.28 m
H max B
Ho
= + B+
2
B2
4
pmax = 564282.1 kg/m2
56.43 kg/cm2
to = 0.6 cm
St = 1200 kg/cm2
t= 6.24 cm
2.458 pulg ==> 2.5"
Q= 18 m3/s
L= 900 m
Hbruta = 520 m
D= 2.4 m
n= 0.011
A= 4.524 m2
R= 0.60 m
V= 3.979 m/s
Sf = 0.00379
hf = 3.41 m
Hneta = 516.59 m
Pot = 76249 KW
76.25 MW
1000 watts 1 KW
1000 KW 1 MW
1000 MW 1 GW
1000 GW 1 TW
Q= 12 m3/s
L= 1200 m
Hbruta = 640 m
D= 1.8 m
n= 0.011 m
T= 6 s
A= 2.545 m2
Vo = 4.716 m/s
Sf = 0.00780 f (est) = 0.0124
hf = 9.364 hf (D.W.) = 9.364
Ho = 630.64
a= 1300.90 m/s
H P=
1
2
([H R + H S )+
a
gA
( Q R Q S )
af t
2 gDA 2
( Q R|Q R|Q S|Q S|) ]
QP=
1
2
( [
Q R +Q S ) +
gA
a
( H R H S )
ft
( Q |Q |+ QS |QS|)
2 gDA R R ]
1 2 3 4 5 6 7
t (s) x 0 200 400 600 800 1000 1200
0.0 Hp = 640.00 638.44 636.88 635.32 633.76 632.20 630.64
Qp = 12.00 12.00 12.00 12.00 12.00 12.00 12.00
HR = 636.33
QR = 12.00
HS = 634.30
QS = 12.00
term1 = 1270.64
term2 = 0.00
term3 = 0.00
term1 = 24.00
term2 = 0.04
term3 = 0.03
0.1 Hp = 635.32
Qp = 12.01
0.2 Hp =
Qp =
0.3 Hp =
Qp =
Una central hidroelctrica cuya caida bruta es 520 m, turbina una caudal de 18 m3/s.
Se pide determinar la potencia que desarrolla la central para los siguientes datos:
Longitud de la tubera forzada = 1000 m
Dimetro de la tubera forzada = 2 m
Rugosidad absoluta del acero, K = 0.06 mm
Q= 18 m3/s
L= 1000 m
Hbruta = 520 m
D= 2 m
K= 0.00006 m
A= 3.142 m2
V= 5.730 m/s
Re = 11459156
RHS = 9.9345
f= 0.0101
hf = 8.48 m
Hneta = 511.52 m
Pot = 75501 KW
75.50 MW
1000 watts 1 KW
1000 KW 1 MW
1000 MW 1 GW
1000 GW 1 TW
Una central hidroelctrica tiene una tubera forzada
con las caractersticas indicadas.
Se pide determinar el espesor de la misma
considerando el efecto de golpe de ariete asociado
a una operacin de cierre del sistema en 6 segundos.
Q= 8 m3/s
L= 1060 m
Hbruta = 640 m
D= 1.302940032 m VELOC 6 m/s
K= 0.011 m AREA 1.33333333
T= 8 s DIAMETRO 1.30294003
A= 1.333 m2
V= 6.000 m/s
Clculo de prdidas:
Re = 7817640 2
RHS =
f=
hf =
5.282
0.0358
53.503 m
B=
[
L(V o V T )
gH o T ]
Ho = 586.50 m
B=
Hmax/Ho =
Hmax =
Hmax =
0.0191
0.148
86.83
673.33
m
m
H max B
Ho
= + B+
2
B2
4
pmax = 673328.3 kg/m2
67.33 kg/cm2
to = 0.6 cm
St = 1200 kg/cm2
t= 4.26 cm
1.675 pulg ==> 2"
A= 2.545 m2
Vo = 4.716 m/s
hf = 53.503 m
Ho = 396.50 m
Determinacin de "a":
K= 2.10E+09 N/m2
E= 2.10E+11 N/m2
D= 1.80 m
e= 0.051 m
rho = 1000 kg/m3
c= 0.85
a= 1270.4 m/s
( '2T ) +1
2
H1 = psi1^2*Ho = 477.62 '
T= +
HT = psiT^2*Ho = 465.98 2T
Hmax = 477.62 m
max = 81.12 m