Você está na página 1de 2

AUTHORIZATION FOR USE

All information regarding the status of your case you


can get by : THE MUNICIPALITY OF
Sending a message on a number 061 760 960. The
message should consist of the word STATUS and an BOSANSKA KRUPA THE MUNICIPALITY
indentification number of your case. Example:
"Status 07-2-38-xxxx/12", OFBOSANSKA KRUPA
Department of spatial planning, legal
Call the Info desk at numbers:
Department of spatial planning,
037 / 471 088, 037 / 471 089, 037 / 471 property and geodesy affairs legal property and geodesy affairs
120, 037 / 471 091, 037 / 471 263
Contact person: Mr. Suvad Alievi, the consultat for Street: Terzia bb.
the legal affairs, Hours: between 08:00 and
13:00,
77240 Bosanska Krupa
Visit the Info desk, between 08:00 and 13:00,
AUTHORIZATION
More information via e-mail
FOR USE
suvada@opcinabosanskakrupa.ba

Web: www.opcinabosanskakrupa.ba
E-mail: opcina.bosanskakrupa@bih.net.ba
T e l./ F a x ; 03 7 / 4 7 1 0 06 , B o s an sk a Kru p a , 2 0 1 5 .
B o s a n s k a Kr u p a , 2 0 1 5 .
AU T H O R I Z AT I O N F O R
U SE
AUTHORIZATION FOR USE
Application
According to the Law on Spatial
Planning and Construction of Una Sana The investor submits the application for authorization for use to
Technical inspection of the building
Canton - revised text ("Official the administrative body that issued the building approval.
Along with the request for authorization to use other documents A technical inspection determines that the
Gazette of USC" No. 12/13) building was constructed in accordance with
shall be submited:
constructed building can be used and project documentation based on which the
put into operation, and then issue a 1. copies of building permits, approval was issued for construction, technical
decision to carry out activities under a regulations and standards, as well as special
special regulation, only after the 2. geodetic survey of the building and the plot, made on the regulations for the relevant building.
land surface
administration authority, competent for
construction, issues an approval for its 3. a written statement by the contractor on the works and The competent administrative authority shall,
use. conditions of construction maintenance, and a written within 30 days of receipt of a proper
statement of investors for facilities referred to in Article application , of Article 130 of the Law on
Permission for use is issued after a 91, paragraph (4) of the Spatial Planning and Spatial Planning and Construction of the Una
Construction of the Una Sana Canton - revised text Sana Canton - revised text ("Official Gazette of
technical inspection of the building. ("Official Gazette of USC," No. 12 / 13) USC" No. 12/13) perform a technical inspection
Application process o f t h e b u i l d i n g .
4. written report construction supervision, The costs of technical inspection, which is
Requests should be handed in at the determined for each individual case, pays the
5. certified project design, if during the construction of the
desk for receipt of submissions in the building came to a deviation from the main project on the investor.
Services Center of the Municipality of basis of which building permits was issued,
Bosanska Krupa, whose proper forms Commission for technical inspection
are located in the counter hall and for 6. invoice of payment of administrative fees in the amount
which resolutions this department is of 0.05 of the estimated value of the object. The competent administrative authority
r e s p o n s i b l e .T h e d oc u m e n t a ti o n designates the professional technical inspection
For buildings for which subsequent acts on construction were
submitted with the application shall be commission (hereinafter: Commission), the
issued, which were built before the entry into force of the
Spatial Planning and Construction of the Una Sana Canton - President and members of the Commission, within
accompanied by the original or 8 days of receipt of a proper application of
certified copy. revised text ("Official Gazette of USC" No. 12/13), instead of
the written statements of the performers of executed works Article 130 of the Law on Spatial Planning and
Along with the application the and conditions of construction maintenance, and a written Construction of teh Una Sana Canton - revised
prescribed fee shall be accompanied, report on construction supervision, the investor is obliged to text ("Official Gazette of USC" No. 12/13). The
unless certain documents and actions obtain an expert opinion of the expert or a legal persons administration authority shall issue an
does not charge tax or if the applicant authorized to engage in construction supervision, which authorization for use within 8 (eight) days, if the
is exempted from taxes, for which the confirms that the building was constructed according to the Commission reports determines that the
regulations, that is technically correct and stable, and that authorization may be granted for use for a
proof is required . meets the requirements of usability construction. given building.

opcina.bosanskakrupa@bih.net.ba www.opcinabosanskakrupa.ba
B o s an sk a Kr u p a , 2 0 1 5 .

Você também pode gostar