DENSITY IN PLACE BY SAND CONE


METHODE ( AASHTO T-191-61* )

Poject : Civil Works for Construction of Karian Multipurpose DAM Date


Station : Tested by
Material : Checked by

No Test
STA 15+450 15+550
Depth / Layer 1st 1st
Rigth / Left R/s R/s
1 Weigth of Sand Before gram 8032 8005
2 Weigth of Sand After gram 4405 4358
3 Weigth of Sand Used ( 1 - 2 ) gram 3627 3647
4 Weigth of Sand In Cone and Plate gram 1469 1469
5 Weigth of Sand in Hole ( 3 - 4 ) gram 2158 2178
6 Unit Weigth of Sand ( Gs ) 1.488 1.488
7 Volume of Hole ( 5 / 6 ) cm 1450 1463
8 Weigth of Wet Sample and Container gram 3254 3257
9 Weigth of Container gram 2 2
10 Weigth of Wet Sampleand Container ( 8 - 9 ) gram 3252 3255
11 Wet Density w ( 10 : 7 ) gr / cm 2.243 2.224
12 Dry Density d ( 11 / (100+f)/100 % 2.077 2.048
13 Weigth of Retained No #4 gram 1561 1497
14 % Retyained No #4 ((13 : 10 ) x 100 ) % 48.0 46.0
15 Optimum Moisture Content ( Lab ) % 8.9 8.9
16 Max Dry Density Correction d . ( Table ) gr / cm 2.054 2.040
17 Max Dry Density of Lab d gr / cm 2.032 2.032
18 Degree of Compaction ( ( 12 : 16 ) x 100 ) % 101.1 100.4
19 Specification %

Water Content
No of Can
a Weigth of Can + Wet Sample gram 283.1 294.8
b Weigth of Can + Dry Sample gram 266.2 275.8
c Weigth of Water ( a - b ) gram 16.9 19.0
d Weigth of Can gram 54.4 54.3
e Weigth of Dry Sample ( b - d ) gram 211.8 221.5
f Water Content ( ( c : e ) x 100 ) % 8.0 8.6

L
1
2
3
3
2
1
R

Approve by the Employer Check by The Engineer Submitted by the Co


DAELIM - WIKA - WA
CONTRACTOR

:
:
:

15+650 15+775
1st 1st
R/s R/s
7974 7952
4325 4300
3649 3652
1469 1469
2180 2183
1.488 1.488
1465 1467
3264 3249
2 2
3262 3247
2.226 2.214
2.048 2.040
1484 1461
45.5 45.0
8.9 8.9
2.036 2.034
2.032 2.032
100.6 100.3

283.5 291.0
265.2 272.5
18.3 18.5
54.4 54.3
210.8 218.2
8.7 8.5
Submitted by the Contractor
DAELIM - WIKA - WASKITA, JO
EMPLOYER CONSULTANT CONTRACTOR

DENSITY IN PLACE BY SAND CONE


METHODE ( AASHTO T-191-61* )

Poject : Civil Works for Construction of Karian Multipurpose DAM Date


Station : Tested by
Material : Checked by

No Test
STA 15+400 15+550
Depth / Layer 1st 1st
Rigth / Left R/s R/s
1 Weigth of Sand Before gram 8114 8096
2 Weigth of Sand After gram 4433 4415
3 Weigth of Sand Used ( 1 - 2 ) gram 3681 3681
4 Weigth of Sand In Cone and Plate gram 1469 1469
5 Weigth of Sand in Hole ( 3 - 4 ) gram 2212 2212
6 Unit Weigth of Sand ( Gs ) 1.488 1.488
7 Volume of Hole ( 5 / 6 ) cm 1486 1487
8 Weigth of Wet Sampleand Container gram 3323 3286
9 Weigth of Container gram 2 2
10 Weigth of Wet Sampleand Container ( 8 - 9 ) gram 3321 3284
11 Wet Density w ( 10 : 7 ) gr / cm 2.234 2.209
12 Dry Density d ( 11 / (100+f)/100 % 2.072 2.045
13 Weigth of Retained No #4 gram 1594 1494
14 % Retyained No #4 ((13 : 10 ) x 100 ) % 48.0 45.5
15 Optimum Moisture Content ( Lab ) % 8.9 8.9
16 Max Dry Density Correction d . ( Tabel ) gr / cm 2.054 2.035
17 Max Dry Density of Lab d gr / cm 2.032 2.032
18 Degree of Compaction ( ( 12 : 16 ) x 100 ) % 100.9 100.5
19 Specification %

Water Content
No of Can
a Weigth of Can + Wet Sample gram 290.9 286.0
b Weigth of Can + Dry Sample gram 274.2 268.9
c Weigth of Water ( a - b ) gram 16.7 17.1
d Weigth of Can gram 59.7 55.4
e Weigth of Dry Sample ( b - d ) gram 214.5 213.5
f Water Content ( ( c : e ) x 100 ) % 7.8 8.0

L
1
2
3
3
2
1
R

Approve by the Employer Check by The Engineer Submitted by the Co


DAELIM - WIKA - WAS
CONTRACTOR

:
:
:

15+650 15+775
1st 1st
R/s R/s
8074 8065
4414 4430
3660 3635
1469 1469
2191 2166
1.488 1.488
1472 1456
3273 3259
2 2
3271 3257
2.222 2.237
2.053 2.056
1511 1531
46.2 47.0
8.9 8.9
2.041 2.046
2.032 2.032
100.6 100.5

291.0 294.4
273.1 275
17.9 19.4
54.4 54.5
218.7 220.5
8.2 8.8
Submitted by the Contractor
DAELIM - WIKA - WASKITA, JO
EMPLOYER CONSULTANT CONTRACTOR

DENSITY IN PLACE BY SAND CONE


METHODE ( AASHTO T-191-61* )

Poject : Civil Works for Construction of Karian Multipurpose DAM Date


Station : Tested by
Material : Checked by

No Test
STA 14+800 14+950
Depth / Layer 1st 1st
Rigth / Left R/s R/s
1 Weigth of Sand Before gram 8200 8186
2 Weigth of Sand After gram 4549 4543
3 Weigth of Sand Used ( 1 - 2 ) gram 3651 3643
4 Weigth of Sand In Cone and Plate gram 1469 1469
5 Weigth of Sand in Hole ( 3 - 4 ) gram 2182 2174
6 Unit Weigth of Sand ( Gs ) 1.488 1.488
7 Volume of Hole ( 5 / 6 ) cm 1466 1461
8 Weigth of Wet Sampleand Container gram 3250 3217
9 Weigth of Container gram 2 2
10 Weigth of Wet Sampleand Container ( 8 - 9 ) gram 3248 3215
11 Wet Density w ( 10 : 7 ) gr / cm 2.215 2.200
12 Dry Density d ( 11 / (100+f)/100 % 2.045 2.037
13 Weigth of Retained No #4 gram 1471 1415
14 % Retyained No #4 ((13 : 10 ) x 100 ) % 45.3 44.0
15 Optimum Moisture Content ( Lab ) % 8.9 8.9
16 Max Dry Density Correction d . ( Tabel ) gr / cm 2.035 2.019
17 Max Dry Density of Lab d gr / cm 2.032 2.032
18 Degree of Compaction ( ( 12 : 16 ) x 100 ) % 100.5 100.9
19 Specification %

Water Content
No of Can
a Weigth of Can + Wet Sample gram 287.7 274.1
b Weigth of Can + Dry Sample gram 270.2 257.9
c Weigth of Water ( a - b ) gram 17.5 16.2
d Weigth of Can gram 59.7 55.4
e Weigth of Dry Sample ( b - d ) gram 210.5 202.5
f Water Content ( ( c : e ) x 100 ) % 8.3 8.0

L
1
2
3
3
2
1
R

Approve by the Employer Check by The Engineer Submitted by the Co


DAELIM - WIKA - WA
CONTRACTOR

:
:
:

15+100 15+250
1st 1st
R/s R/s
8164 8132
4512 4439
3652 3693
1469 1469
2183 2224
1.488 1.488
1467 1494
3268 3323
2 2
3266 3321
2.226 2.222
2.046 2.050
1502 1461
46.0 44.0
8.9 8.9
2.040 2.040
2.032 2.032
100.3 100.5

288.5 297.5
269.6 278.7
18.9 18.8
54.4 55.4
215.2 223.3
8.8 8.4
Submitted by the Contractor
DAELIM - WIKA - WASKITA, JO
EMPLOYER CONSULTANT CONTRACTOR

SUMMARY DENSITY IN PLACE BY SAND CONE


( AASHTO T-191-61* )

Description : Selected Embankment


Station : 14 + 750 - 15 + 800 R/s

LOCATION LAB DENSITY FIELD DENSITY

NO DATE D. Max OMC D. Max MC Density


Station Layer Left/Right
(g/cc) (%) (g/cc) (%) Correction

1 : 14+800 1st R/s 2.032 8.9 2.045 8.3 2.035


2 : 14+950 1st R/s 2.032 8.9 2.037 8.0 2.019
3 : 15+100 1st
R/s 2.032 8.9 2.046 8.8 2.04
4 : 15+250 1st
R/s 2.032 8.9 2.050 8.4 2.04
5 : 15+400 1st
R/s 2.032 8.9 2.072 7.8 2.054
6 : 15+550 1st
R/s 2.032 8.9 2.045 8.0 2.035
7 : 15+650 1st
R/s 2.032 8.9 2.053 8.2 2.041
8 : 15+775 1st
R/s 2.032 8.9 2.056 8.8 2.046
9 : 15+450 1st R/s 2.032 8.9 2.077 8.0 2.054
10 : 15+550 1st R/s 2.032 8.9 2.048 8.6 2.04
11 : 15+650 1st
R/s 2.032 8.9 2.048 8.7 2.036
12 : 15+775 1st
R/s 2.032 8.9 2.040 8.5 2.034
13 January 19, 2015 #REF! Top #REF! 2.074 5.8 #REF! #REF! #REF!
14 January 20, 2015 2.074 5.8 -
15 January 21, 2015 2.074 5.8 -
16 January 22, 2015 2.074 5.8 -
17 January 23, 2015 2.074 5.8 -
18 January 24, 2015 2.074 5.8 -
19 January 25, 2015 2.074 5.8 -
20 January 26, 2015 -

Remark :

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Indus
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Syefria Indra, ST Ahmad Najib M, ST


Quality Engineer Quality Control Manager
SUMMARY
DENSITY
FIELD DENSITY TEST
%

100.5 100

100.9 100

100.3 100

100.5 100

100.9 100

100.5 100

100.6 100

100.5 100

101.1 100

100.4 100

100.6 100

100.3 100
#REF! 100
#VALUE! 100
#VALUE! 100
#VALUE! 100
#VALUE! 100
#VALUE! 100
#VALUE! 100
#VALUE! 100