AACE International

Technical Board Report

Recommended Practices - Status Report - As July 7, 2011

RP TCM Latest Published Primary Author


Item No. Recommended Practice Name
Number Number Draft Date Date Name

Recommended Practices - TCM Framework - Priority


1. CE-51 7.3 Planning for Budgeting Process from Lance Stephenson
Estimator Viewpoint (Estimate Chartering)

2. CE-52 7.3 Cost Estimating - Quantification of Scope Pete Bredehoeft


for cost estimating - Generic
3. CE-53 7.3 Cost Estimating - Conceptual Cost
Estimating Methodologies and
Relationships - Generic
4. CE-54 7.3 Cost Estimating - Detailed Cost
Estimating Methodologies and
Relationships - Generic.
5. CE-55 7.3 Cost Estimating - Unit Price Development Todd Pickett
for Cost Estimates
6. CE-56 7.3 Default Costs Applied to Scope
7. CE-57 7.3 Cost Estimating - Cost Estimate Costing
Vs Pricing - Generic - Owner Perspective

8. CE-58 7.3 Cost Estimating - Cost Estimate Costing


Vs Pricing - Generic - Contractor
Perspective
9. CE-59 7.3 Estimate Optimization, Value Engineering
and Constructiblity
10. CE-60 7.3 Cost Estimating - Historical Database
Development

Page 1 of 2
Estimating RP's
AACE International
Technical Board Report

Recommended Practices - Status Report - As July 7, 2011

RP TCM Latest Published Primary Author


Item No. Recommended Practice Name
Number Number Draft Date Date Name

11. CE-61 7.3 Benchmarking and Metrics Specific Jim Whiteside


Terminology - Generic
12. CE-62 7.3 Benchmarking and Metrics Specific Jim Whiteside
Methodology - Generic
13. CE-62 7.3 Historical Data - Collection Processes
14. CE-63 7.3 Historical Data - Data Normilization and
Calibration
15. CE-64 7.3 Historical Data - Estimating Tool
Development and Calibration
16. CE-65 7.3 Estimating Transfer to Control Budget
17. CE-66 7.3 Cash Flow Analysis
18. CE-67 7.3 Estimate Format and Structure - Planning Pete Bredehoeft

19. CE-68 7.3 Estimate Reporting - Final Output John Hollmann


20. CE-69 7.3 Bidding the Estimate - Owner Perspective

21. CE-70 7.3 Bidding the Estimate - Contractor


Perspective
22. CE-71 7.3 Roles and Reponsibilites of a Cost
Estimator

Page 2 of 2
Estimating RP's