Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Sg Tok Jai
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 723000.00 m2
Overland Flow Length 5 m
Duration of storm 21 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 7.887 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
723000 12291 7.88673 0.027 0.05 1 75.001987

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 72.3 1446 10
The total basin volume required for the site 300 72.3 2169 10

Minium settling depth,y1 1m


Settling width, W1 20 m

The settling zone average length,L1 v1/(w1*Y1) 72.3 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 72.3 <200 OK
Width 3.615 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 723 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 18 m
L2 = L1 - 2 x (d1/2) x Z 70.3 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 723 m

3
if settling depth Y2 is 0.3 363.78 m
3
0.7 799.932 m OK!

Length (m)
70.3

Height (m), y1+y2


1.7

Width (m)
18
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 2
Catchment (River) Raja Gali
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 611000 m2
Overland Flow Length 5 m
Duration of storm 21 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 6.665 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty Sediment Yield, Y


Area, m2 Runoff Volume ,V (m3) LS CP
Rate, Q Factor,K (ton)
611000 10387 6.66499 0.027 0.05 1 62.116079

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 61.1 1222 10
The total basin volume required for the site 300 61.1 1833 10

Minium settling depth,y1 0.8 m


Settling width, W1 20 m

The settling zone average length,L1 v1/(w1*Y1) 76.375 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 95.46875 <200 OK
Width 3.81875 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z2 : 611 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 18.4 m
L2 = L1 - 2 x (d1/2) x Z 74.775 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 611 m

3
if settling depth Y2 is 0.3 396.041 m
3
0.5 641.593 m OK!

Length (m)
74.775

Height (m), y1+y2


1.3

Width (m)
18.4
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 3
Catchment (River) Tok Jai 2
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 4341000 m2
Overland Flow Length 5 m
Duration of storm 21 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 47.353 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
4341000 73797 47.3531 0.027 0.1 1 1116.782074

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 434.1 4341 5
The total basin volume required for the site 300 434.1 6511.5 5

Minium settling depth,y1 2m


Settling width, W1 30 m

The settling zone average length,L1 v1/(w1*Y1) 72.35 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 36.175 <200 OK
Width 2.411666667 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 2170.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 26 m
L2 = L1 - 2 x (d1/2) x Z 68.35 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 2170.5 m

3
if settling depth Y2 is 0.3 516.201 m
3
1 1590.4 m OK!

Length (m)
68.35

Height (m), y1+y2


3

Width (m)
26
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 4
Catchment (River) Pulau Panjang
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 6827000 m2
Overland Flow Length 5 m
Duration of storm 21 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 74.471 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
6827000 116059 74.4712 0.027 0.1 1 1854.408312

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 682.7 6827 5
The total basin volume required for the site 300 682.7 10240.5 5

Minium settling depth,y1 1m


Settling width, W1 50 m

The settling zone average length,L1 v1/(w1*Y1) 136.54 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 136.54 <200 OK
Width 2.7308 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 3413.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 48 m
L2 = L1 - 2 x (d1/2) x Z 134.54 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 3413.5 m

3
if settling depth Y2 is 0.3 1904.57 m
3
0.6 3743.76 m OK!

Length (m)
134.54

Height (m), y1+y2


1.6

Width (m)
48
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 5
Catchment (River) Alor Baung
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 9504000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 103.673 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
9504000 161568 103.673 0.051 0.07 1 3551.628440

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 950.4 9504 5
The total basin volume required for the site 300 950.4 14256 5

Minium settling depth,y1 2m


Settling width, W1 40 m

The settling zone average length,L1 v1/(w1*Y1) 118.8 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 59.4 <200 OK
Width 2.97 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 4752 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 36 m
L2 = L1 - 2 x (d1/2) x Z 114.8 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 4752 m

3
if settling depth Y2 is 0.3 1212.75 m
3
1.3 4867.33 m OK!

Length (m)
114.8

Height (m), y1+y2


3.3

Width (m)
36
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 6
Catchment (River) Alor A
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1912000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 20.857 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1912000 32504 20.8567 0.051 0.07 1 589.438855

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 191.2 1912 5
The total basin volume required for the site 300 191.2 2868 5

Minium settling depth,y1 1m


Settling width, W1 20 m

The settling zone average length,L1 v1/(w1*Y1) 95.6 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 95.6 <200 OK
Width 4.78 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 956 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 18 m
L2 = L1 - 2 x (d1/2) x Z 93.6 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 956 m

3
if settling depth Y2 is 0.3 485.406 m
3
0.7 1070.68 m OK!

Length (m)
93.6

Height (m), y1+y2


1.7

Width (m)
18
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Alor B
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1633000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 17.813 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1633000 27761 17.8133 0.051 0.07 1 493.988516

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 163.3 1633 5
The total basin volume required for the site 300 163.3 2449.5 5

Minium settling depth,y1 1m


Settling width, W1 20 m

The settling zone average length,L1 v1/(w1*Y1) 81.65 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 81.65 <200 OK
Width 4.0825 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 816.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 18 m
L2 = L1 - 2 x (d1/2) x Z 79.65 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 816.5 m

3
if settling depth Y2 is 0.3 412.587 m
3
0.7 908.579 m OK!

Length (m)
79.65

Height (m), y1+y2


1.7

Width (m)
18
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) LM20
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1691000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 18.446 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1691000 28747 18.446 0.051 0.07 1 513.680603

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 169.1 1691 5
The total basin volume required for the site 300 169.1 2536.5 5

Minium settling depth,y1 1m


Settling width, W1 20 m

The settling zone average length,L1 v1/(w1*Y1) 84.55 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 84.55 <200 OK
Width 4.2275 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 845.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 18 m
L2 = L1 - 2 x (d1/2) x Z 82.55 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 845.5 m

3
if settling depth Y2 is 0.3 427.725 m
3
0.7 942.277 m OK!

Length (m)
82.55

Height (m), y1+y2


1.7

Width (m)
18
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) LM19
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 2417000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 26.365 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
2417000 41089 26.3654 0.051 0.08 1 875.858848

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 241.7 2417 5
The total basin volume required for the site 300 241.7 3625.5 5

Minium settling depth,y1 1m


Settling width, W1 30 m

The settling zone average length,L1 v1/(w1*Y1) 80.5667 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 80.56666667 <200 OK
Width 2.685555556 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 1208.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 28 m
L2 = L1 - 2 x (d1/2) x Z 78.56666667 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 1208.5 m

3
if settling depth Y2 is 0.3 640.832 m
3
0.6 1243.62 m OK!

Length (m)
78.5667

Height (m), y1+y2


1.6

Width (m)
28
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Lubok Mulong 1
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 4885000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 53.287 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
4885000 83045 53.2872 0.051 0.16 1 3852.322036

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 488.5 4885 5
The total basin volume required for the site 300 488.5 7327.5 5

Minium settling depth,y1 1m


Settling width, W1 45 m

The settling zone average length,L1 v1/(w1*Y1) 108.556 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 108.5555556 <200 OK
Width 2.412345679 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 2442.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 43 m
L2 = L1 - 2 x (d1/2) x Z 106.5555556 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 2442.5 m

3
if settling depth Y2 is 0.3 1347.7 m
3
0.6 2641.89 m OK!

Length (m)
106.556

Height (m), y1+y2


1.6

Width (m)
43
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) LM1
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 2876000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 31.372 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
2876000 48892 31.3724 0.051 0.08 1 1064.162181

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 287.6 2876 5
The total basin volume required for the site 300 287.6 4314 5

Minium settling depth,y1 1m


Settling width, W1 35 m

The settling zone average length,L1 v1/(w1*Y1) 82.1714 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 82.17142857 <200 OK
Width 2.347755102 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 1438 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 33 m
L2 = L1 - 2 x (d1/2) x Z 80.17142857 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 1438 m

3
if settling depth Y2 is 0.3 773.38 m
3
0.6 1506.34 m OK!

Length (m)
80.1714

Height (m), y1+y2


1.6

Width (m)
33
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) LM11
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1955000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 21.326 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1955000 33235 21.3258 0.051 0.07 1 604.305712

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 195.5 1955 5
The total basin volume required for the site 300 195.5 2932.5 5

Minium settling depth,y1 1m


Settling width, W1 30 m

The settling zone average length,L1 v1/(w1*Y1) 65.1667 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 65.16666667 <200 OK
Width 2.172222222 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 977.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 28 m
L2 = L1 - 2 x (d1/2) x Z 63.16666667 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 977.5 m

3
if settling depth Y2 is 0.3 514.244 m
3
0.6 995.992 m OK!

Length (m)
63.1667

Height (m), y1+y2


1.6

Width (m)
28
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Lubok Mulang 2
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1798000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 19.613 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1798000 30566 19.6132 0.051 0.065 1 510.919046

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 179.8 1798 5
The total basin volume required for the site 300 179.8 2697 5

Minium settling depth,y1 1m


Settling width, W1 25 m

The settling zone average length,L1 v1/(w1*Y1) 71.92 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 71.92 <200 OK
Width 2.8768 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 899 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 23 m
L2 = L1 - 2 x (d1/2) x Z 69.92 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 899 m

3
if settling depth Y2 is 0.3 465.776 m
3
0.7 1035.34 m OK!

Length (m)
69.92

Height (m), y1+y2


1.7

Width (m)
23
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Seribong 1
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 3517000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 38.365 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
3517000 59789 38.3646 0.045 0.15 1 2205.570454

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 351.7 3517 5
The total basin volume required for the site 300 351.7 5275.5 5

Minium settling depth,y1 1m


Settling width, W1 40 m

The settling zone average length,L1 v1/(w1*Y1) 87.925 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 87.925 <200 OK
Width 2.198125 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 1758.5 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 38 m
L2 = L1 - 2 x (d1/2) x Z 85.925 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 1758.5 m

3
if settling depth Y2 is 0.3 957.293 m
3
0.6 1870.3 m OK!

Length (m)
85.925

Height (m), y1+y2


1.6

Width (m)
38
Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Location
Number 1
Catchment (River) Jelutong
Sediment Basin Type Wet

Design Storm 3 month ARI


Catchment Area 1476000 m2
Overland Flow Length 5 m
Duration of storm 30 min
Intensity of Design Storm, I 46.2 mm/hr (3 months ARI)
Runoff Coeeficient,C 0.85
Flow Rate, Q 16.101 m3/s

0.56
Sediment Yield Formula ,Y = 89.6 x (VQp) (K.LS.C.P)

Flow Soil Erodibilty


Area, m2 Runoff Volume ,V (m3) LS CP Sedimeny Yield, Y (ton)
Rate, Q Factor,K
1476000 25092 16.1007 0.051 0.07 1 441.112177

Settling zone
Table 5.11 area (ha) required/total basin Factor %
volume required (m3)
The settling zone volume required for the site,v1 200 147.6 1476 5
The total basin volume required for the site 300 147.6 2214 5

Minium settling depth,y1 1m


Settling width, W1 25 m

The settling zone average length,L1 v1/(w1*Y1) 59.04 m


Stormwater Management and Drainage Master Plan of Bandar Kota Bharu, Kelantan

Settling zone dimension


Depth 59.04 <200 OK
Width 2.3616 > 2 OK

Sediment Storage Zone


3
*Required settling zone is one third of the total volume,Z 2 : 738 m

Demension at the top of the sediment storage zone are:


W2 = W1 -( 2 x (d1/2) x Z) 23 m
L2 = L1 - 2 x (d1/2) x Z 57.04 m

Required depth for sediment storage zone , V2 :


3
V2 = Z2Y23- Zy22(W2+L2)+y2(W2L2) must larger than 738 m

3
if settling depth Y2 is 0.3 379.223 m
3
0.65 785.663 m OK!

Length (m)
57.04

Height (m), y1+y2


1.65

Width (m)
23