Escolar Documentos
Profissional Documentos
Cultura Documentos
consider 1m x 1m area:
L= 1+1+0.9+0.9+1.414
= 5.214 m ~ 17.10 ft
For classroom:
2 3 17.10
Factor= = 8.55
12 2
Note: actual computations:
Factor: 2x3x18
BF = 9.40 (8.55)=81BF
Using 2x3x10 ~ 5BF/pc
81
2310 = = 17
5 /
L=3.8(1.10)=4.18m~13.71ft
2213.71
Factor: = 4.57
12 2
TONGUE & GROOVE FLOORING
n=[1m/0.1](1.22)=12.2pcs
22% INC for shrinkage
For 1 x 6 T&G 16% INC
143.28
FACTOR: 12.2pcs- = 13.34 2
12
Or for 1x6 T&G
n=[1m/0.15](1.16)=7.73pcs
163.28
FACTOR: 7.73pcs- = 12.68 2
12
Note:
Wood 2x3 wall studs connect using (common wire nail)
Metal reinforcement 2x3 metal studs connect using (blind rivets)
GIRT along 5m
4pcs-2x10x18 Girt=120BF
ROOF FRAME
Woodwork for Roof Frame
Direct Count
TRUSS:
1. Bottom Chord (double BC)
L(min)=4+0.2+2(0.05)=4.30m(14.11)
4pcs-2x10x16BC=107BF
2. Top Chord (single)
L=14.35=16
4pcs-2x8x16TC=86BF
3. KING POST 6.WOOD BLOCK
L=1.50m~5ft n=6pcs
2pcs-2x8x6/1pc-2x8x12=16BF 2pcs-2x8x12 WB=32BF
4. RIDGE BEAM
L=18ft
1pc-2x10x18 RB=30BF
5. RAFTERS
2x8@1m OC
5
n= 1 2 = 8
1
8pcs-2x8x16 Rafter=171BF
7.PURLIN 2x3 9. WOOD CLEAT
16
n= + 1 + 2 = 22 connect purlin to rafter/TC
2