THEORITICAL REQUIREMENT OF MATERIALS

BUILDINGS.
EXCAVATION
Sr. Item Unit Rubble Over Size Sand in Quarry in spaul
No. in M3 metal in M3 M3 in M3
1 Providing trap M3 1.00 -- -- 0.20
rubble spoiling 15
to 20cm thick
2 Providing soiling M3 -- 1.00 0.15 --
using 80mm over
size trap metal

PILE FOUNDATION
Sr. Item Unit Cement Sand in M3
No. Bags
1 M-25 RCC Cast in Situ Bored Piles M3 7.50 0.45
3
2 M-30 RCC Cast in Situ Bored Piles M 8.00 0.45

PLAIN CEMENT CONCRETE AND REINFORCED CEMENT CONCRETE

Sr. Item Unit Cement Screened Course Aggregate


No. Bags Sand in
40mm 20mm 12/10m
M3
in M3 in M3 m in M3
1 Plain cement concrete M3 2.60 0.47 0.90 -- --
1:5:10
2 Plain cement concrete M3 3.40 0.47 0.90 00 00
1:4:8
3 Plain cement concrete M3 4.40 0.445 0.56 0.24 0.11
1:3:6
4 Plain cement concrete M3 6.27 0.445 -- 0.57 0.28
1:2:4
5 M-10 Grade Cement M3 4.40 0.445 0.56 0.24 0.11
Concrete
6 M-15 Grade PCC M3 6.27 0.445 0 0.57 0.28
7 M-20 Grade PCC M3 7.00 0.445 0 0.57 0.28
8 M-15 Grade Cement M3 6.27 0.425 0 0.57 0.28
Concrete (RCC)
9 M-20 Grade Cement M3 7.00 0.425 0 0.57 0.28
Concrete(RCC)
10 M-25 Grade cement M3 7.50 0.425 0 0.57 0.28
Concrete (RCC)
11 M-30 Grade Cement M3 8.00 0.425 0 0.57 0.28
Concrete (RCC)
BRICK MASONARY.
Sr. Item Unit Cement Screened Bricks M.S. Bars
No. in Bags Sand in M3 in Nos in Kg.
1 Second class brick work in CM M3 1.42 0.32 475 00
1:6 in foundation and plinth of
Inner Wall/ External Wall.
2 Second Class Brick works in CM M3 1.42 0.32 475 00
1:6 in Superstructure
3 Second Class Brick works in CM M3 0.22 0.034 55 1.76
1:4 with 6mm diameter M.S.Bars
in half brick walls.
4 Second Class Brick masonary in M3 2.60 0.25 475 --
CM 1:4 for pillars rectangular in
shape
5 Second Class Brick Masonary in M3 2.60 0.25 475 --
CM 1:4 for Pillars Curved in
Shape
6 Second Class brick masonary M3 1.24 0.25 475 --
coping in CM 1:6

STONE MASONARY.
Sr. Item Unit Cement Screened Trap Corner/
No. in Bags Sand in M3 Rubble Quins in
in Nos Nos
1 UCR masonary in CM 1:6 in M3 1.77 0.35 1.16 2
foundations and plinth of inner
walls/external walls
2 UCR masonary in CM 1:6 in M3 2.05 0.35 1.16 2
Super structure
3 Random rubble masonary IInd M3 2.05 0.35 1.16 2
sort in CM 1:6 in Superstructure

Sr. Item Unit Cement Screened Trap Cornet/ Trap Khandkis


No. in Bags Sand in rubble Quins header in Nos
M3 in M3 in Nos in Nos
4 CR Masonary 2nd sort M3 1.50 0.30 0.35 2 7 50
in CM 1:6 in Plinth
5 CR Masonary 2nd sort M3 1.50 0.30 0.35 2 7 50
in CM 1:6 in
superstructure
6 CR Masonary 1st sort M3 1.50 0.30 0.35 2 7 50
in CM 1:6 in
superstructure &
pillars
Sr. Item Unit Cement Screened Laterite Stone
No. in Bags Sand in M3 45x30x20 cm in
nos.
7 Laterite masonary in CM 1:6 in M3 1.20 0.21 45
foundations
8 Laterite masonary in CM 1:6 in M3 1.20 0.21 45
superstructures
WATER PROOFING TREATEMENT.
Sr. Item Unit Cement Screened Course Aggtregate
No. in Bags sand in 20mm in 12/10mm
M3 M3 in M3
1 50mm thick damp proof M2 0.32 0.022 0.033 0.011
coarse in CC 1:2:4
2 20mm thick integral finishing M2 0.20 0.020 0 0
in CM 1:3
3 W.P. to terrace 112 mm thick M2 0.71 0.09 Brick Bat 00
0.10
4 W.P. of BB coba to water M3 2.20 0.23 0 0
closet
5 20mm thick water proof M2 0.22 0.03 0 0
plaster in 1:3 for dado
6 25mm thick water proof M2 0.27 0.02 0 0
bedding in CM 1:3
PLASTERING AND POINTING.
Sr. Item Unit Cement Screened Fine
No. in bags sand in aggregate
M3 in M3
1 6mm plaster in CM 1:4 M2 0.054 0.0076 0
2
2 6mm plaster in CM 1:3 M 0.07 0.0076 0
2
3 12 mm plaster in single coat in CM 1:5 M 0.090 0.015 0
2
4 12 mm plaster in single coat in CM 1:4 M 0.11 0.015 0
2
5 12 mm plaster in single coat in CM 1:3 M 0.14 0.015 0
2
6 20mm cement plaster in CM 1:3 in single coat M 0.228 0.024 0
2
7 20mm cement plaster in CM 1:5 in two coat M 0.14 0.025 0
2
8 20mm cement plaster in CM 1 :4 in two coat M 0.17 0.025 0
2
9 25mm cement plaster in CM 1:4 in two coat M 0.217 0.031 0
2
10 Sand faced plaster in CM 1:4 in two coat M 0.25 0.033 0
11 Rough Cast Plaster in two costs in CM 1:4 M2 0.25 0.021 0.012
2
12 Rough Cast Plaster in two coats in CM 1:4 with M 0.25 0.021 0.012
colour pigment
13 Exterior Stone crete facing in CM 1:3 M2 0.300 0.015 0.015
14 Flush grooved pointing CM 1:3 to brick M2 0.02 0.003 0
masonary
15 Flush grooved pointing in CM 1:3 to stone M2 0.040 0.003 0
masonary
16 Tuck pointing in CM 1:3 to stone masonary M2 0.040 0.005 0
2
17 Weather pointing in CM 1:3 to stome masonary M 0.040 0.004 0
2
18 Vee pointing in CM 1:3 to stone masonary M 0.030 0.003 0
2
19 Flush pointing in CM 1:3 to stone masonary M 0.025 0.003
PAVING AND FLOORING

Sr. Item Unit Cement in Screened


No. Bags sand in M3
1 Rough Shahabad flooring 25 to 30mm thick M2 0.135 0.022
on bed of 1:6 CM with CP 1:3
2 Polished shahabad/tandur/kotah stone M2 0.135 0.022
flooring 25 to 30mm thick on bed of 1:6 CM
3 Polished shahabad/tandur/kotah stone M2 0.135 0.022
flooring 25 to 30mm thick on bed of 1:6 CM
with kadappa border
4 Polished shahabad tandur/kotah stone M2 0.185 0.022
flooring 25 to 30mm thick for dado on 1:4
cement mortar plaster
5 Plain cement tile 25 x 25 cm flooring on bed M2 0.135 0.02
of 1:6 cement mortar
6 Plain cement tiles for dado and skirting on M2 0.185 0.02
1:4 cement mortar plaster
7 Plain Coloured cement tiles for flooring on M2 0.135 0.02
bed of 1:6 CM
8 Plain coloured cement tiles for dado on M2 0.185 0.02
plaster of 1:4 cement mortar
9 White/colour glazed tiles 150 x 150mm & M2 0.22 0.02
200 mm x 100mm for flooring on 1:4 CM.
10 White/colour glazed tiles 150 x 150mm & M2 0.21 0.02
200 mm x 100mm for dado on 1:4 cm plaster
11 Gray/white cement based marble mosaic tiles M2 0.135 0.02
for flooring on 1:6 cement mortar
12 Gray/white cement based marble mosaic tiles M2 0.185 0.02
for dado on 1:4 cement plaster bed.
13 P & L Machine cut Marble Slab 60 x 45 cm M2 0.135 0.022
flooring on 1:6 Cement mortar bed
14 P & L Machine cut Marble Slab 60 x 45 cm M2 0.185 0.02
for dado on 1:4 Cement plaster bed
15 Providing & Laying in situ cement mosaic M2 0.20 0.02
dado and skirting 6mm thick on plaster in
CM 1:3
16 Providing and laying flooring of Tukda M2 0.30 0.024
mosaic/china mosaic (broken mosaic tile
pieces) on bed of 1:4 cement mortar
17 Providing and laying polished shahabad/ M2 0.185 0.02
tandur/kotah stone/kadappa slab for treads
and risers on bed of 1:4 CM
18 Plain Cement tiles/plain coloured cement tiles M2 0.185 0.02
for treads and risers on bed of 1:4 cm
Sr. Item Unit Cement Screened
No. in Bags sand in M3
19 Marble mosaic tiles for treads and risers on bed of M2 0.185 0.02
1:4 cement mortar
20 Marble slabs 20mm thick for treads and rises & M2 0.185 0.02
sills
21 Polished shahabad tandur/kotah/kadappa stone 25 M2 0.185 0.02
to 30 mm thick sill on bed of 1:4 CM
22 Providing sills of precast marble mosaic tiles on M2 0.185 0.02
bed of 1:4 CM
23 White marble slabs dado and skirting M2 0.185 0.02
2
24 25 thick precast polished chequered tiles/ coloured M 0.16 0.02
cement tiles and treads and plain cement tiles for
risers.
25 Polished chequred marble mosaic tiles 20 x 32 cm M2 0.185 0.02
size for treads and risers
26 Marble/ Kadappa/Tandur stone partition for urinals M2 0.055 0.005
2
27 Vitrified flooring on a bed of CM 1:4 M 0.21 0.017
2
28 Vitrified tiles for dado and skirting CM 1:4 M 0.20 0.012
2
29 30 x 30 cm Ceramic tile flooring on bed of 1:4 CM M 0.21 0.017
2
30 30 x 30 cm Ceramic Tiles for dado and skirting M 0.20 0.012

Sr. Item Unit Cement Screened Metal


No. in bags sand in M3
20mm in 12/10mm
M3 in M3
1 IPS Flooring in 1:1 :3 M2 0.310 0.020 0.033 0.017
proportion 40mm thick
2 IPS Flooring in 1:1 :3 M2 0.350 0.022 0.044 0.014
proportion 50mm thick
3 IPS Flooring in 1:2:4 proportion M2 0.300 0.020 0.033 0.017
40mm thick
4 IPS flooring in 1:2:4 proportion M2 0.314 0.022 0.044 0.014
50mm thick

SR. Item Unit Cement Screened Crushed


No. in bags sand in M3 Sand in M3
1 Providing & laying in situ cement M2 0.20 0.0136 0.0272
marble mosaic 10mm thick for
flooring
THEORITICAL REQUIREMENT OF MATERIALS OF
BLACK TOP ROAD ITEMS
(AS PER STANDARD SPECIFICATIONS)
Sr. Item Unit Asphalt Coarse Aggregate
No in Kg 40mm 25 20mm 12mm 10mm 6mm
cum mm cum cum cum cum
in
cum

1 Providing 20mm 100 156 - - - 1.83 0.90 0.15


thick premix carpet Sqm

2 Single coat surface 100 120 - - 1.50 - - -


(19 mm
dressing on prepared Sqm nominal)
surface (Most)

3 Bituminous liquid 100 98 - - - - - 0.90


seal coat Sqm (6.70
mm)

4 Tack coat on WBM 100 100 - - - - - -


surface Sqm

5 Tack coat on BT 100 50 - - - - - -


surface Sqm

6 20 mm thick open 100 146 - - 1.80 - 0.90 -


(13.2
graded hot mix laid Sqm mm) (11.20
carpet mm)
75 mm thick 6.30
7 100 200 Hand - - 1.80 - -
bituminous bound broken +
macadam surface Sqm 2.70
crushed
= 9.00
50 mm thick 4.20
8 100 175 Hand - - 1.20 - -
bituminous bound broken +
macadam Sqm 1.80
crushed
= 6.00
THEORITICAL MATERIAL REQUIREMENT
AS PER STANDARD SPECIFICATIONS
(REQUIREEMENT OF MATERIALS SHALL BE AS PER ACTUAL JOB MIX
BRIDGE AND C.D.WORKS)

Sr. Item Unit Cement Screened Course Aggregate


No in bags sand in 40 mm 20 mm 12/10 mm
Cum in Cum in Cum in Cum
1 Plain cement concrete 1:5:10 Cum 2.65 0.43 0.85 - -
2 Plain cement concrete 1:4:8 Cum 3.40 0.43 0.85 - -
3 Plain cement concrete 1:3:6 Cum 4.40 0.43 0.85 - -
4 Plain cement concrete 1:2:4 Cum 6.27 0.43 0.85 - -
5 M-10 grade concrete Cum 4.40 0.43 0.85 - -
6 M-15 grade concrete Cum 6.27 0.45 - 0.67 0.22
7 M-20 grade concrete Cum 7.10 0.45 - 0.67 0.22
8 M-25 grade concrete Cum 7.50 0.45 - 0.67 0.22
9 M-30 grade concrete Cum 8.00 0.45 - 0.67 0.22
10 M-35 grade concrete Cum 8.20 0.45 - 0.67 0.22

Sr. Item Unit Cement Screene Trap Corner Trap Khandki in


No in bag d sand Rubble Quins Header Nos
in Cum in Cum in Nos in Nos
11 UCR masonry in CM Cum 1.77 0.35 1.16 2 - -
1:6 for head wall
including pointing in
CM 1:3
12 Rubble filling behind Cum - - 1.20 - - -
the abutment

RCC PIPES
SR. Item Unit Cement in Sand in
No Bag Cum
1 P & L cc pipes of NP-2 class / IRC Pipes of NP-3 Class
I 450 mm dia. M 0.12 0.009
II 600 mm dia. M 0.16 0.011
III 800 mm dia. M 0.22 0.015
IV 900 mm dia M 0.22 0.0154
V 1000 mm dia M 0.24 0.017
VI 1200 mm dia. M 0.26 0.018
THEORITICAL MATERIAL REQUIREMENT
M.O.S.T. 2000 EDITION AND DATA BOOK

( Grading Material shall be as per actual job mix formula wherever applicable)
1) Primer coat over Granular base (Table :500.1 page 19)
i) Low porosity surface such as wet mix 6 to 9 kg/10 Sqm
macadam and water bound macadam
ii) Medium porosity surface such as cement stabilized soil base 9 to 12 kg/10 Sqm
iii) High porosity surface such as grave base 12 to 15 kg/10 Sqm

2) Bituminous tack coat (Table : 500.2 page 22)


i) Normal bituminous surface 2.00 to 2.50 kg / 10 Sqm
ii) Dry and hungry bituminous surface 2.50 to 3.00 kg / 10 Sqm
iii) Granular surfaces treated with primer 2.50 to 3.00 kg / 10 Sqm
iv) Non bituminous surfaces
a) Granular base (Not primed) 3.50 to 4.00 kg / 10 Sqm
b) Cement concrete pavement 3.00 to 3.50 kg / 10 Sqm

3) Bituminous macadam with 3.30% bitumen by weight of total mix

A) Bitumen 72.43 Kg / Cum


B) Coarse aggregate 37.5 mm to 25 mm 0.212 Cum
C) Chipping 25mm to 10 mm 0.637 Cum
D) Fine aggregate 10 mm to 5 mm 0.354 Cum
5 mm & below 0.212 Cum
----------------------
1.415 Cum

4) Bituminous Penetration macadam (Table 500.6 page 29)


Compacted Bitumen coarse Key
thickness Aggregate Aggregate
50 mm 50 kg/ 10 m2 0.60 m3 /10m2 0.15 m3 / 10m2
75 mm 68 kg/ 10 m2 0.90 m3/ 10 m2 0.18 m3/ 10 m2

5) Built up Spray Grout (Excluding Primer / Tack coat) clause no. 506
A) Bitumen @ 15 kg /10m2 for each layer - 30 kg / 10m2

B) Coarse aggregate passing 53 mm 0.50 Cum/10m2 1.00cum/ 10m2


& retained on 2.80 mm for each layer

C) key aggregate Passing 22.4 mm 0.13 Cum /10m2 0.13 Cum / 10m2
Retained on 2.80 mm -------------------------
Total 1.13 cum /10 m2
6) Dense Graded Bituminous Macadam (Density 2.30)
Grading I ( 40 mm nominal size) with bitumen at 4.25% of total mix
(Excluding primer coat / tack coat) Clause No. 507

i) Bitumen 98.10 kg/cum


ii) 37.5 mm to 25 mm 0.324 Cum / Cum Total
iii) 25 mm to 10 mm 0.191 Cum / Cum 1.445 Cum/ Cum
iv) 10 mm to 4.75 mm 0.28 Cum/ Cum
v) 4.75mm & below 0.65 Cum/ Cum
vi) Filler 2% of weight of aggregate

7) Surface dressing (Table 500.20 page 53)


a) 19mm nominal size Bitumen Stone chipping
i) Single coat surface dressing or 1st coat 12.00 kg/10m2 0.15 Cum/10m2
of two coat surface dressing
b) 13mm nominal size
ii) single coat surface 10.00 kg/10m2 0.10 m3/10m2
dressing or 1st coat of two coat surface dressing
8) Open graded premix carpet 20mm thick (Table 500.23 page 57 clause no.511
i) 13.20 mm stone chipping 0.18 m3/10m2 total chipping
0.27m3/10m2
ii) 11.20 mm stone chipping 0.09 m3/10m2

iii) Binder (Bitumen) for 13.20 mm chipping 9.50kg / 10m2 Total Bitumen

iv) Binder (Bitumen) for 11.2 mm chipping 5.10 kg / 10m2 14.60 kg /10 Sqm

9) Bituminous Concrete (Excluding primer /tack coat with cement filler)


Density 2.35 Data Book bitumen content at 5%
Grading I (19 mm nominal sixe)

i) 20 mm to 10 mm 0.522 m3/ cum


ii) 10 to 05 mm 0.343 m3/ cum Total Aggregate
iii) 5 mm & below 0.597 m3/ cum 1.462 Cum/Cum
iii) Filler @2% of weight of aggregate
iv) Bitumen at 5% 117.80 kg/m3

10) Seal coat Type A Liquid seal coat clause no 513


i) Stone chipping 6.70 mm 0.09 m3/10m2
passing 11.20 mm & retained on 2.36 mm
ii) Bitumen 9.80 kg/ 10m2

11) Providing and applying premixed seal coat type B Clause no 513
i) Sand or grit passing 2.36 mm and 0.060 m3/10 m2
retained on 180 micron
ii) Bitumen 6.80 kg /10 m2
THEORITICAL MATERIAL REQUIREMENT
M.O.S.T. 2000 EDITION AND DATA BOOK
(REQUIREMENT OF MATERIALS SHALL BE AS PER ACTUAL JOB MIX FORMULA BRIDGES
AND CULVERTS)

SR. ITEM UNIT CEME COARSE COURSE


NO NT IN SAND IN AGGREGATE
MT M3 40 20 10
mm mm mm
in M3 in m3 in m3
1 PCC/RCC in open foundation

a) PCC m 15 m3 0.275 0.45 0.54 0.27 0.09


b) PCC m 20 m3 0.34 0.45 0.36 0.36 0.18
c) PCC m 25 m3 0.40 0.45 0.36 0.36 0.18
d) PCC m 30 m3 0.405 0.45 0.36 0.36 0.18

2 a) RCC M-20 m3 0.35 0.45 - 0.54 0.36


b) RCC M-25 m3 0.403 0.45 - 0.54 0.36
c) RCC M-30 m3 0.407 0.45 - 0.54 0.36
d) RCC M-35 m3 0.422 0.45 - 0.54 0.36
3 a) RCC Well Curb

i) RCC M20 m3 0.347 0.45 - 0.54 0.36


ii) RCC M25 m3 0.403 0.45 - 0.54 0.36
iii) RCC M30 m3 0.407 0.45 - 0.54 0.36
iv) RCC M35 m3 0.422 0.45 - 0.54 0.36
v) RCC M40 m3 0.430 0.45 - 0.54 0.36

b) Well Staining

i) RCC M-20 m3 0.347 0.45 - 0.54 0.36


ii) RCC M-25 m3 0.403 0.45 - 0.54 0.36
iii) RCC M-30 m3 0.407 0.45 - 0.54 0.36
iv) RCC M-35 m3 0.422 0.45 - 0.54 0.36
v) RCC M-40 m3 0.430 0.45 - 0.54 0.36

C) Bottom Plug

i) PCC M20 m3 0.37 0.45 0.36 0.36 0.18


ii) PCC M25 m3 0.40 0.45 0.36 0.36 0.18
iii) PCC M30 m3 0.405 0.45 0.36 0.36 0.18
iv) PCC M35 m3 0.420 0.45 0.36 0.36 0.18
d) Top & Intermediate plug

i) PCC M20 m3 0.344 0.45 0.36 0.36 0.18


ii) PCC M25 m3 0.40 0.45 0.36 0.36 0.18
iii) PCC M30 m3 0.405 0.45 0.36 0.36 0.18
SR. ITEM UNIT CEME COARSE COURSE
NO NT IN SAND IN AGGREGATE
MT M3 40 20 10
mm mm mm
in M3 in m3 in m3
e) Well cap in RCC & Pile
cap in RCC

i) RCC M20 m3 0.340 0.45 - 0.54 0.36


ii) RCC M25 m3 0.403 0.45 - 0.54 0.36
iii) RCC M30 m3 0.407 0.45 - 0.54 0.36
iv) RCC M35 m3 0.422 0.45 - 0.54 0.36

4 a) PCC for Substructure

i) PCC M- 15 grade m3 0.275 0.45 0.54 0.27 0.09


ii) PCC M- 20 grade m3 0.344 0.45 0.36 0.36 0.18
iii) PCC M- 25 grade m3 0.400 0.45 0.36 0.36 0.18
iv) PCC M- 30 grade m3 0.405 0.45 0.36 0.36 0.18
v) PCC M- 35 grade m3 0.419 0.45 0.36 0.36 0.18

b) RCC for Substructure

i) RCC M-15 grade m3 0.275 0.45 0.54 0.27 0.09


ii) RCC M-20 grade m3 0.347 0.45 - 0.54 0.36
iii) RCC M-25 grade m3 0.403 0.45 - 0.54 0.36
iv) RCC M-30 grade m3 0.407 0.45 - 0.54 0.36
v) RCC M-35 grade m3 0.422 0.45 - 0.54 0.36
vi) RCC M-40 grade m3 0.430 0.45 - 0.54 0.36

5 a) RCC Superstructure

a) RCC M-20 grade m3 0.347 0.45 - 0.54 0.36


b) RCC M-25 grade m3 0.400 0.45 - 0.54 0.36
c) RCC M-30 grade m3 0.407 0.45 - 0.54 0.36
d) RCC M-35 grade m3 0.422 0.45 - 0.54 0.36
e) RCC M-40 grade m3 0.430 0.45 - 0.54 0.36

b) RCC Main cross Girder


Diaphragms

a) RCC M 20 m3 0.347 0.45 - 0.54 0.36


b) RCC M 25 m3 0.400 0.45 - 0.54 0.36
c) RCC M30 m3 0.407 0.45 - 0.54 0.36
d) RCC M35 m3 0.422 0.45 - 0.54 0.36
e) RCC M40 m3 0.430 0.45 - 0.54 0.36

c) Prestressed concrete
a) M-35 grade m3 0.422 0.45 - 0.54 0.36
b) M-40 grade m3 0.430 0.45 - 0.54 0.36
SR. ITEM UNIT CEME COARSE COURSE
NO NT IN SAND IN AGGREGATE
MT M3 40 20 10
mm mm mm
in M3 in m3 in m3
RCC Wearing Course &
6 Approach slab
a) RCC M-15 grade m3 0.300 0.45 - 0.67 0.22
b) RCC M-20 grade m3 0.350 0.45 - 0.67 0.22
c) RCC M-25 grade m3 0.375 0.45 - 0.67 0.22
d) RCC M-30 grade m3 0.400 0.45 - 0.67 0.22
e) RCC M 35 grade m3 0.413 0.45 - 0.67 0.22
f) RCC M 40 grade m3 0.425 0.45 - 0.67 0.22