Pyramid Steel Structre

Demand for Civil Work

Sr.No Discriptoin Unit Qty Rate

1 PVC Pipe @ 4" NO. 50 200

2 Tharma Pole Sheet Thik 0.5" NO. 150 20

3 Polythene Sheet Role NO 10 11250

4 Steel Nails 3" Pack 10 124

5 Shutring Nails 3" Kg 20 300

6 Lifting Built(Cpacity kg25000) NO. 10 500


ructre
ork

Amount Remarks

10000 For Drainage of rain water

3000 For Expention joints

112500 For Covering Material

1240 For Shutring

6000 For Shutring

5000 For Loading Unloading


Pyramid Steel Structure
Demand For Civil Work
Sr.No Discription Unit Qty.

1 Polythene Sheet role No. 10

2 PVC Pipe Bend @ 8" No. 10

3 Tharma pole Sheet 12mm No. 50

4 Crush Cft 4000

5 Sand Cft 2000

6 Cement Bags 1000

7 Bricks No. 25000

8 LED Lights No. 20

9 Electric Cable 2 core Feet 500

10 Petrol Ltr. 10
ructure
Work
Remarks

For Covering material

For cable ducket

For expention joints

For RCC Flooring

For RCC Flooring

For RCC Flooring

For Bricks Flooring

For night working

For Lights

For vabrator
DAILY INSPECTION REPORT

Location: Workshop

Inspection
Sr. No. Project Tiltle Executioner Item
Activity

Cutting inspection
of plates for Crane Worker Mess
1 Ajmal Khan Structure
Beam-1 (Part # Shed
03)

Fit up Inspection
2 of Crane Beam Main Steel Shed Almansoor Engg. Structure
Fit up(CB-1)
Inspection
3 WeldingD-7 Main Steel Shed Riaz Structure
of Column Worker Mess
4 inspection of Ajmal Khan Structure
Shed
Rafter R-1 (Qty: 6)

Marking inspection
of Plates for Rafter
5 Main Steel Shed Almansoor Engg. Structure
Line 8 (Part # 9A,
7,9,14)

Welding
inspection of
6 Main Steel Shed Al Etihad Engg. Structure
Column (A1, A2,
A3)

Marking inspection
of plates for Rafter
7 Main Steel Shed Al Etihad Engg. Structure
(4-3, 4-5, 4-6)
( Part # 09)
Cutting inspection
of plates for Rafter
8 Main Steel Shed Al Etihad Engg. Structure
(4-3, 4-5, 4-6)
( Part # 10,11)

Welding
inspection of arm
9 Gentry Crane 1 Ashraf Structure
with Gentry
Crane-1

M. Ibrar

Prepared By
Date: 20-11-2016

Drawing # Rev. # Client Inspector (s) Findings

Pyramid Steel
GA-DR-002-12-31 2 Saeed Cutting found ok
Structure

Pyramid Steel
MS-DR-001-30-32- 3 Saeed Fit up found ok
Structure
Pyramid Steel
MS-DR-001-12-32 3 Saeed Fit up found ok
Structure
Pyramid Steel Cleaning &
GA-DR-002-07-31 2 Saeed
Structure Grinding required

Pyramid Steel
MS-DR-001-13-32 1 Saeed Marking found ok
Structure

Pyramid Steel Welding is in


MS-DR-001-09-32 1 Saeed
Structure Progress

Pyramid Steel
MS-DR-001-15A-32 1 Saeed Marking found ok
Structure
Pyramid Steel
MS-DR-001-15A-32 1 Saeed Cutting found ok
Structure

Pyramid Steel Welding is in


GA-DR-001-01-01 5 Saeed
Structure Progress

Saeed Anwar

Checked By Checked By
Doc. No: QA/QC
Rev.: 00
Date: 20-11-16
Page: 1 of 1

Action Taken Remarks

Go ahed _

Go ahed _
Go ahed _
Rectification is in
Go ahed
Progress

Go ahed _

Go ahed _

Go ahed _
Go ahed _

Go ahed _