Escolar Documentos
Profissional Documentos
Cultura Documentos
Amount Remarks
10 Petrol Ltr. 10
ructure
Work
Remarks
For Lights
For vabrator
DAILY INSPECTION REPORT
Location: Workshop
Inspection
Sr. No. Project Tiltle Executioner Item
Activity
Cutting inspection
of plates for Crane Worker Mess
1 Ajmal Khan Structure
Beam-1 (Part # Shed
03)
Fit up Inspection
2 of Crane Beam Main Steel Shed Almansoor Engg. Structure
Fit up(CB-1)
Inspection
3 WeldingD-7 Main Steel Shed Riaz Structure
of Column Worker Mess
4 inspection of Ajmal Khan Structure
Shed
Rafter R-1 (Qty: 6)
Marking inspection
of Plates for Rafter
5 Main Steel Shed Almansoor Engg. Structure
Line 8 (Part # 9A,
7,9,14)
Welding
inspection of
6 Main Steel Shed Al Etihad Engg. Structure
Column (A1, A2,
A3)
Marking inspection
of plates for Rafter
7 Main Steel Shed Al Etihad Engg. Structure
(4-3, 4-5, 4-6)
( Part # 09)
Cutting inspection
of plates for Rafter
8 Main Steel Shed Al Etihad Engg. Structure
(4-3, 4-5, 4-6)
( Part # 10,11)
Welding
inspection of arm
9 Gentry Crane 1 Ashraf Structure
with Gentry
Crane-1
M. Ibrar
Prepared By
Date: 20-11-2016
Pyramid Steel
GA-DR-002-12-31 2 Saeed Cutting found ok
Structure
Pyramid Steel
MS-DR-001-30-32- 3 Saeed Fit up found ok
Structure
Pyramid Steel
MS-DR-001-12-32 3 Saeed Fit up found ok
Structure
Pyramid Steel Cleaning &
GA-DR-002-07-31 2 Saeed
Structure Grinding required
Pyramid Steel
MS-DR-001-13-32 1 Saeed Marking found ok
Structure
Pyramid Steel
MS-DR-001-15A-32 1 Saeed Marking found ok
Structure
Pyramid Steel
MS-DR-001-15A-32 1 Saeed Cutting found ok
Structure
Saeed Anwar
Checked By Checked By
Doc. No: QA/QC
Rev.: 00
Date: 20-11-16
Page: 1 of 1
Go ahed _
Go ahed _
Go ahed _
Rectification is in
Go ahed
Progress
Go ahed _
Go ahed _
Go ahed _
Go ahed _
Go ahed _