Calculation Cover Sheet

PROJECT Apache Zama CALC. NO. AJG-STR-001

SUBJECT Inlet Seperator Building DISCIPLINE Civil

PROJECT# G13038.100

ORIGINATOR AJG DATE 2/10/2014 FILE NO.


CHECKER DATE NO. OF PAGES 1
(incl. Cover)

CALCULATION RECORD
Rev. Description Date By Chkd Date
0 Initial CALCS 4/26/2013 AJG

PURPOSE OF CALCULATION:
To calculate dry and wet (i.e. hydrotest) loads of pipe lengths.

CONCLUSIONS:
Piping loads determined. Input into S-Frame model.

RECOMMENDATIONS:
N/A

ASSUMPTIONS:
Weight of water = 9.81 kN/m3, Weight of steel = 77.0 kN/m3

Programs used: Loads will be input into S-Frame


File location: L:\Engineering\Civil Engineering\Technical Library\Calculations\50 Structural Steel\Spreadsheets

GFZ-0001 Calculation Cover Sheet


FM00080, Rev. 1, April 2009
Page 1 of 2
Spreadsheet designed by JCB
1-Feb-12
= output
= user input

PIPING LOAD CALCULATIONS


PROJECT : Apache Zama By: AJG
PROJECT#: G13038.100 Checked: 0
SKID NAME: Inlet Seperator Building Date: 2/10/2014

PIPE INFORMATION
Reference Table for Assumed Specific Gravities:
Brine~ Water Oil~ Condensate~
m of steel 0.3 (i) & (ii)* 1.20 1.00 0.80 0.67
~ specific gravities vary, engineer confirm (see DBM) (viii)
Pipe Properties (v) & (vi)
Pipe Wall Linear Pipe Specific Pipe
Pipe Length Type or Weight of Total Load Temperature
Nominal O.D. (mm) Thickness Mass Length Gravity of Weight
No. (iii) Schedule (iv)* Liquid (kN) (kN) Load (kN)
Size (In.) (mm) (kg/m) (m) Liquid (kN)
15-6 6 S 168.3 7.11 28.26 5 1.00 1.39 0.91 2.30 0.69
15-7 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
16-1 6 S 168.3 7.11 28.26 5 1.00 1.39 0.91 2.30 0.69
16-2 6 S 168.3 7.11 28.26 5 1.00 1.39 0.91 2.30 0.69
16-3 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
16-4 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
16-5 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
16-6 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
17-1 4 S 114.3 6.02 16.07 5 1.00 0.79 0.40 1.19 0.36
17-2 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
17-3 6 S 168.3 7.11 28.26 5 1.00 1.39 0.91 2.30 0.69
17-4 8 S 219.1 8.18 42.55 5 1.00 2.09 1.58 3.67 1.10
18-1 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
18-2 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
18-3 3 S 88.9 5.49 11.29 5 1.00 0.55 0.23 0.79 0.24
18-4 2 S 60.3 3.91 5.44 5 1.00 0.27 0.11 0.37 0.11
18-5 3 S 88.9 5.49 11.29 5 1.00 0.55 0.23 0.79 0.24
19-1 12 S 323.9 9.53 73.88 2.5 1.00 1.81 1.79 3.60 1.08
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A #N/A
* Indicates refer to respective note at bottom of sheet

NOTES:
i) 0.5 is typically used for pipe supports but 0.3 may be reasonable when including both pipe and water weights (hydrotest scenario).
ii) Temperature stresses are generally calculated as m * (Total Dead Load of Pipe and Water) applied parallel to the pipe.
iii) Pipe Length No. is as defined by the civil engineer. See "Example" worksheet for how this may be efficiently defined.
iv) Must enter "S", "XS", "XXS", "Schedule 40", etc
v) Properties are automatically drawn from "Pipe_Info" Table
vi) "Pipe_Info" Table includes many standard types of pipe, and may be expanded as necessary.
vii) In addition to the loads calculated here do not forget to account for insulation if applicable.
viii) Remember that for pipe racks there are two loading scenarios: Hydrotest and Operating. Often hydrotest governs but engineer to determine.
Nominal Pipe Size O/d (mm) S XS XXS Schedule 10 Schedule 20 Schedule 30 Schedule 40 Schedule 60 Schedule 80 Schedule 100
(Inches)
Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m Wall Kg/m
0.50 21.3 2.77 1.27 3.73 1.62 7.47 2.55 2.77 1.27 3.73 1.62
0.75 26.7 2.87 1.69 3.91 2.2 7.82 3.64 2.87 1.69 3.91 2.2
1.00 33.4 3.38 2.5 4.55 3.24 9.09 5.45 2.77 2.12 3.38 2.5 4.55 3.24
1.25 42.2 3.56 3.39 4.85 4.47 9.7 7.77 3.56 3.39 4.85 4.47
1.50 48.3 3.68 4.05 5.08 5.41 10.15 9.56 3.68 4.05 5.08 5.41
2.00 60.3 3.91 5.44 5.54 7.48 11.07 13.44 2.77 3.99 3.91 5.44 5.54 7.48
2.50 73 5.16 8.63 7.01 11.41 14.02 20.39 3.05 5.34 5.16 8.63 7.01 11.41
3.00 88.9 5.49 11.29 7.62 15.27 15.24 27.68 3.05 6.56 5.49 11.29 7.62 15.27
3.50 101.6 5.74 13.57 8.08 18.63 3.05 7.43 5.74 13.57 8.08 18.63
4.00 114.3 6.02 16.07 8.56 22.32 17.12 41.03 3.05 8.5 6.02 16.07 8.56 22.32
5.00 141.3 6.55 21.77 9.53 30.97 19.05 57.43 3.4 11.74 6.55 21.77 9.53 30.97
6.00 168.3 7.11 28.26 10.97 42.56 21.95 79.22 3.4 14.04 7.11 28.26 10.97 42.56
8.00 219.1 8.18 42.55 12.7 64.64 22.23 107.92 3.76 20.27 6.35 33.31 7.04 36.81 8.18 42.55 10.31 53.08 12.7 64.64 15.09 75.92
10.00 273.1 9.27 60.31 12.7 81.55 25.4 155.15 4.19 28.21 6.35 41.77 7.8 51.03 9.27 60.31 12.7 81.55 15.09 96.01 18.26 114.75
12.00 323.9 9.53 73.88 12.7 97.46 25.4 186.97 4.57 36.54 6.35 49.73 8.38 65.2 10.31 79.73 14.27 108.96 17.48 132.08 21.44 159.91
14.00 355.6 9.53 81.33 12.7 107.39 6.35 54.69 7.92 67.9 9.53 81.33 11.13 94.55 15.09 126.71 19.05 158.1 23.83 194.96
16.00 406.4 9.53 93.27 12.7 123.3 6.35 62.64 7.92 77.83 9.53 93.27 12.7 123.3 16.66 160.12 21.44 203.53 26.19 245.56
18.00 457 9.53 105.16 12.7 139.15 6.35 70.57 7.92 87.71 11.13 122.38 14.27 155.8 19.05 205.74 23.83 254.55 29.36 309.62
20.00 508 9.53 117.5 12.7 155.12 6.35 78.55 9.53 117.15 12.7 156.12 15.09 183.42 20.62 247.83 26.19 311.17 32.54 381.53

S = Standard, XS = Extra Strong, XXS = Double Extra Strong

Column_Checker_Table (Intermediate_Function)
S 4
XS 6
XXS 8
Schedule 10 10
Schedule 20 12
Schedule 30 14
Schedule 40 16
Schedule 60 18
Schedule 80 20
Schedule 100 22
Schedule 120 24
Schedule 140 26
Schedule 160 28
Schedule 120 Schedule 140 Schedule 160

Wall Kg/m Wall Kg/m Wall Kg/m


4.78 1.95
5.56 2.9
6.35 4.24
6.35 5.61
7.14 7.25
8.74 11.11
9.53 14.92
11.13 21.35

11.13 28.32 13.49 33.54


12.7 40.28 15.88 49.11
14.27 54.2 18.28 67.56
18.26 90.44 20.62 100.92 23.01 111.27
21.44 133.06 25.4 155.15 28.58 172.33
25.4 186.97 28.56 208.14 33.32 238.76
27.79 224.65 31.75 253.56 35.71 281.7
30.95 286.64 36.53 333.19 40.49 365.35
34.93 363.56 39.57 408.26 45.24 459.37
38.1 441.49 44.45 508.11 50.01 564.81