MUNICIPALIDAD PROVINCIAL DE ESPINAR

GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL


Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________

MEMORIA DESCRIPTIVA

CAPITULO I

1. IDENTIFICACION: CODIGO SNIP N 191512


2. APROBACION EXP TECNICO Resolucin de Alcalda N 217-
2012-GM-MPE

3. NOMBRE DEL PROYECTO DE INVERSION PUBLICA:

MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DE LA I.E.N 56178 DE


LA COMUNIDAD DE OQUEBAMBA DEL DISTRITO DE ESPINAR PROVINCIA DE
ESPINAR CUSCO

4. ESTRUCTURA FUNCIONAL PROGRAMATICA DEL PIP:


FUENTE DE FINANCIAMIENTO : CANON Y SOBRECANON, REGALIAS, RENTA DE
ADUANAS Y PARTICIPACCIONES.
UNIDAD DE GESTIN : MUNICIPALIDAD PROVINCIAL DE ESPINAR
FUNCIN : EDUCACION
PROGRAMA : EDUCACION BASICA
SUB PROGRAMA : EDUCACION PRIMARIA
5. LOCALIZACION GEOGRAFICA:
REGION : CUSCO
DEPARTAMENTO : CUSCO
PROVINCIA : ESPINAR
DISTRITO : ESPINAR
CENTRO POBLADO : OQUEBAMBA

6. DE LA UNIDAD EJECUTORA:
NOMBRE : MUNICIPALIDAD PROVINCIAL DE
ESPINAR
SECTOR : GOBIERNOS LOCALES
UNIDAD ORGANICA : GERENCIA DE INFRAESTRUCTURA
PUBLICA.
RESPONSABLE : ING. IVAN OSORIO
DIRECCION : PLAZA DE ARMAS N 101

7. AMPLIACION DE PLAZOS
Resolucin Alcalda N109-2013-MPE-C.
Fecha de Aprobacin : 07/03/2013
AMPLIACION DE PLAZO N01 : 92 Das Calendarios
AMPLIACION DE PRESUPUESTO N01 : S/. 69,544.13 Nuevos
Soles
Resolucin Alcalda N552-2013-MPE-C.
Fecha de Aprobacin : 06/09/2013
AMPLIACION DE PLAZO N02 : 30 Das Calendarios
AMPLIACION DE PRESUPUESTO N02 : S/. 52,294.80 Nuevos
Soles
AMPLIACION DE PRESUPUESTO N03 : S/. 46,291.89 Nuevos
Soles

8. PRESUPUESTO DE OBRA

PRESUPUESTO EXPEDIENTE : S/. 740,103.96 Nuevos Soles (20.21 %)


AMPLIACION DE PRESUPUESTO N01 : S/. 69,544.13 Nuevos
Soles (11.30 %)

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03


MUNICIPALIDAD PROVINCIAL DE ESPINAR
GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL
Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________
AMPLIACION DE PRESUPUESTO N02 : S/. 52,294.80 Nuevos
Soles ( 8.49 %)
AMPLIACION DE PRESUPUESTO N03 : S/. 46,291.89 Nuevos
Soles 7.52% REAJUSTE DE PRECIOS
TOTAL : S/. 908,234.78 Nuevos Soles

9. MONTO DE INVERSION TOTAL

RESUMEN DEL PRESUPUESTO DE OBRA


1 CONSTRUCCION DE MODULOS 171,348.28

2 CERCO PERIMETRICO 182,851.51

3 LOSA DEPORTIVA 80,969.85

4 MEJORAMIENTO DE LA INFRAESTRUCTURA EXISTENTE. 45,201.88

5 CONSTRUCCION SS.HH. 83,694.73

6 EQUPAMIENTO Y MOBILIARIO EDUCACION BASICA 26,382.70

7 EQUIPAMIENTO Y MOBILIARIO DE AREAS COMMPLEMENTARIAS 6,992.30

597,441.
SUB TOTAL COSTO DIRECTO 26

GASTOS GENERALES (14.86%) 88,802.46

GASTOS DE SUPERVISION (4.97%) 29,674.72

GASTOS DE LIQUIDACION (2.07%) 12,375.52

GASTOS DE ELABORACION DE EXPEDIENTE TECNICO (1.98%) 11,810.00

740,103.
PRESUPUESTO TOTAL 96

10.PLAZO DE EJECUCION

El plazo de ejecucin del proyecto de inversin pblica es de 120 das


calendarios.

11.OBJETIVO GENERAL DEL PROYECTO SEGN PERFIL:

Garantizar el acceso de la poblacin Espinarense a servicios de calidad en


educacin y salud; fortalecer sus capacidades, sustentadas en sus races
culturales y el reconocimiento de su identidad local.

12.MODALIDAD DE EJECUCION

La modalidad de ejecucin es por Ejecucin Presupuestaria Directa

13.ANTECEDENTES

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03


MUNICIPALIDAD PROVINCIAL DE ESPINAR
GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL
Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________
PIP vs Expediente Tcnico se tiene un incremento del 20.21%
Para Solicitar Ampliacin Presupuestal se tiene un saldo de:
PIP el 40.00 % de la declaratoria del Proyecto es S/. 861,942.886
(Incremento S/. 246,269.396)
PIP al 20.21 % de la declaratoria del Proyecto es S/. 740,103.960
(Incremento S/. 124,430.470)
PIP el 19.21 % de la declaratoria del Proyecto es S/. 121,838.926
saldo por solicitar para la Ampliacin Presupuestal, para poder
concluir con la obra.

Costo (S/.)
COMPONENTE
Declaratoria Expediente VARIACION
Viabilidad Tcnico %
COSTO DIRECTO
1. CONSTRUCCION DE MODULOS 156,380.60 171,348.28 9.57 %
2. CONSTRUCCION DE CERCO PERIMETRICO 225,272.76 182,851.51 - 18.83 %
3. LOSA DEPORTIVA 75,445.25 80,969.85 7.32 %
4. MEJORAMIENTO DE LA INFRAESTRUCTURA 40,042.11 45,201.88 12.89 %
5. EXISTENTE
CONSTRUCCION DE SS.HH. 15,959.26 83,694.73 424.43 %
6. EQUIPAMIENTO Y MOBILIARIO EDUCACION BASICA 24,878.29 26,382.70 6.05 %
7. EQUIPAMIENTO Y MOBILIARIO DE AREAS 8,386.29 - 16.62 %
6,992.30
COMPLEMENTARIAS
GASTOS GENERALES 90,852.01 88,802.46 - 2.26 %
GASTOS DE SUPERVISION 16,227.50 29,674.72 82.87 %
GASTOS DE LIQUIDACION 5,510.10 12,375.52 124.60 %
EXPEDIENTE TECNICO 8,593.50 11,810.00 37.43 %
TOTAL INVERSION 615,673.49 740,103.96 20.21 %
S/.
14.JUSTIFICACION DEL PROYECTO
Se tiene los siguientes fundamentos para la Ejecucin del Proyecto:
a).- Causas directas.
Infraestructura educativa complementaria deteriorada.
Insuficiente equipamiento y mobiliario en la I.E. de nivel
primario N 56178.
b).- Causas indirectas.
Inadecuada infraestructura complementaria para el desarrollo
de las actividades acadmicas.
Deficiente dotacin de mobiliario y equipos educativos.
Deficiente dotacin de mobiliario y equipos para la
infraestructura complementaria.
15.SITUACION ACTUAL DE LA OBRA A 15 DE MARZO 2013

AVANCE FISICO PROGRAMADO Vs. AVANCE FISICO EJECUTADO


(MARZO DEL 2013)

PROGRAMADO EJECUTADO

ITE (S/.) PORCENTAJE (S/.) PORCENTAJE


PERIODO
M
ACUMULAD ACUMULA ACUMULA MENSUA ACUMULA
MENSUAL O MENSUAL DO MENSUAL DO L DO

1 agosto-12 13,827.55 13,827.55 2.31% 2.31% 13,827.55 13,827.55 2.31% 2.31%

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03


MUNICIPALIDAD PROVINCIAL DE ESPINAR
GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL
Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________

2 septiembre-12 84,307.99 98,135.54 14.11% 16.43% 84,307.99 98,135.54 14.11% 16.43%

3 octubre-12 59,245.66 157,381.20 9.92% 26.34% 59,245.66 157,381.20 9.92% 26.34%

4 noviembre-12 107,193.94 264,575.14 17.94% 44.28% 107,193.94 264,575.14 17.94% 44.28%

5 diciembre-12 45,529.84 310,104.98 7.62% 51.91% 45,529.84 310,104.98 7.62% 51.91%

6 enero-13 84,040.19 394,145.17 14.07% 65.97% 84,040.19 394,145.17 14.07% 65.97%

7 febrero-13 80,000.00 474,145.17 13.39% 79.36% 81,390.17 475,535.34 13.62% 79.60%

8 marzo-13 123,296.09 597,441.26 20.64% 100.00% 40,981.93 516,517.27 6.86% 86.45%

597,441.2 516,517.2
TOTAL 597,441.26 100.00% 100.00% 516,517.27 86.45% 86.45%
6 7

AVANCE FINANCIERO PROGRAMADO Vs. AVANCE FINANCIERO EJECUTADO


(MARZO DEL 2013)

PROGRAMADO EJECUTADO
ITE
PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
M
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
6,724.
agosto-12 6,724.50 0.83% 0.83% 6,724.50 6,724.50 0.83% 0.83%
1 50
septiembre- 94,317.
2 12
101,041.91 11.65% 12.48% 101,041.91 11.65% 12.48%
41 94,317.41
149,585.
3 octubre-12 250,627.65 18.48% 30.96% 250,627.65 18.48% 30.96%
74 149,585.74
noviembre- 102,479.
4 12
353,107.26 12.66% 43.61% 353,107.26 12.66% 43.61%
61 102,479.61
251,508.
5 diciembre-12 604,616.21 31.06% 74.68% 604,616.21 31.06% 74.68%
95 251,508.95
47,376.
6 Enero - 13 651,992.29 5.85% 80.53% 651,992.29 5.85% 80.53%
08 47,376.08
80,000.
7 febrero-13 731,992.29 9.88% 90.41% 669,672.57 2.18% 82.71%
00 17,680.28
77,655.
8 marzo-13 809,648.09 9.59% 100.00% 669,672.57 0.00% 82.71%
80 0.00
809,648.0
TOTAL 809,648.09 100.00% 100.00% 669,672.57 82.71% 82.71%
9 669,672.57

16.JUSTIFICACION DE LA AMPLIACION DE PLAZO EN RELACION AL


EXPEDIENTE TECNICO

14.1 OPININ LEGAL


- Es necesario opinar que, en la Ejecucin de Proyectos por Administracin Directa, no existen
normas y procedimientos especficos que respalden esta modalidad; tomndose como
referencia las leyes y fundamentos legales que se detallan:
La Ley de Contrataciones del Estado y su Reglamento, D.L. N 1017.
R.C. N 195-88-CG, (18.JUL.1988).
Ley General del Sistema Nacional de Presupuesto, (Ley N 28411).

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03


MUNICIPALIDAD PROVINCIAL DE ESPINAR
GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL
Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________
Ley de Presupuesto del Sector Pblico Ao Fiscal 2009, (Ley N 29289).
Directiva General del SNIP N 001-2009-EF/68.01, (R.D. N 002-2009-EF/68.1).
Ley del Sistema Nacional de Control y de la CGR, (Ley N 27785).
- Para el presente informe sustenta torio, tomaremos como referencia La Ley de
Contrataciones del Estado y su Reglamento, D.L. N 1017

14.2 LEY DE CONTRATACIONES DEL ESTADO Y SU REGLAMENTO,


D.L. N 1017

1) La Ampliacin de Plazo, est en base al Decreto Legislativo N 1017, que aprueba la Ley
de Contrataciones del Estado, Ttulo III, Ejecucin Contractual; Captulo IV, Adelantos,
Adicionales, Reducciones y Ampliaciones, Artculo 200.- Causales de Ampliacin de
Plazo: De Conformidad al Artculo 41 de la Ley, el Contratista (Residente de Obra), podr
solicitar la ampliacin de plazo pactado por las siguientes causales, siempre que modifiquen
la ruta crtica del programa de ejecucin de obra vigente.
2) En base al Artculo 201.- Procedimiento de Ampliaciones de Plazo: Se realiza la
descripcin de los antecedentes que ameritan la ampliacin, anotados en el Cuaderno de
Obra, planteando el Anlisis de Causales, para Cuantifican los Das Calendarios de
Ampliacin de Plazo.
3) En el caso de suceder variaciones presupuestales sustanciales se estarn realizando los
trmites administrativos de Ampliacin Presupuestal en base al Artculo 202.- Efectos de la
Modificacin del Plazo Contractual.

14.3 CAUSALES DE AMPLIACIN DE PLAZO N03


Las causales que se consideran son las que se describen:

I. Caso fortuito o fuerza mayor debidamente comprobado.


DE LOS ANTECEDENTES:

a. Suspensin por falta de presupuesto por incremento de Precios en


los diferentes materiales que se adquiri, con fecha de paralizacin
el 15 de marzo 2013.
b. Aprobacin de ampliacin de plazo N02 por 30 das calendarios y
Presupuesto N02 de S/. 52,294.80 Nuevos Soles y N03 S/.
46,291.89 Nuevos Soles segn Resolucin Alcalda N552-2013-
MPE-C. con fecha de aprobacin el 06/09/2013.

14.4 OBJETIVO DE LA AMPLIACION DE PLAZO N03 QUE SE


ESTA SOLICITANDO

CONCLUIR CON LAS PARTIDAS PENDIENTES PARA LA CULMINACION Y


CUMPLIR CON LOS OBJETIVOS DEL EXPEDIENTE TECNICO.

COMPONENTES A EJECUTARSE:

1 CONSTRUCCION DE MODULO 29 das


2 CONSTRUCCION DE CERCO PERIMETRICO 4 das
3 LOSA DEPORTIVA 0 das
4 MEJORAMIENTO DE LA INFRAESTRUCTURA EXISTENTE 1 das

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03


MUNICIPALIDAD PROVINCIAL DE ESPINAR
GERENCIA DE INFRAESTRUCTURA PBLICA Y DESARROLLO TERRITORIAL
Ao para la Inversin Rural y de la Seguridad Alimentaria
_____________________________________________________________________________________
5 CONSTRUCCION DE SS.HH 27 das
6 EQUIPAMIENTO Y MOBILIARIO EDUCACION BASICA 6 das
7 EQUIPAMIENTO Y MOBILIARIO DE AREAS COMPLEMENTARIAS 5 das
1 TOTAL CUANTIFICADO 30 das

14.5 JUSTIFICACION DE LA AMPLIACIN DE PLAZO N03:

1. PARALIZACION DE OBRA TEMPORAL :

INICIO : 16/03/2013
CULMINACION : 17/11/2013
CUANTIFICACION : 247 d.c.

2. PLAZO CONTRACTUAL VIGENTE : 30 Das Calendario

INICIO : 18/11/2013
CULMINACION : 17/12/2013
CUANTIFICACION : 30 d.c.

17. CUANTIFICACIN:
De los antecedentes y el anlisis de causales se tiene:

I. Caso fortuito o fuerza mayor debidamente comprobado.

PARALIZACION DE OBRA TEMPORAL : 247 D.C.


PLAZO CONTRACTUAL VIGENTE: 30 D.C.

Cuantificacin de tiempos : 277 das


calendarios
SE CONCLUYE:

SEGN EL CALENDARIO REPROGRAMADO ACTUALIZADO CON LAS PARTIDAS POR EJECUTAR


Y SALDOS DE METRADOS SE ESTA SOLICITANDO PARA PODER CONCLUIR LA OBRA DE:
277 DIAS CALENDARIOS.

INICIO DE AMPLIACION DE PLAZO : 16 de Marzo 2013

FECHA DE CULMINACION REAL : 17 de Diciembre 2013

OBRA: Mejoramiento de la oferta de Servicios Educativos I.E. N 56178 de la Comunidad de Oquebamba del Distrito de Espinar, Provincia
de Espinar Cusco

AMPLIACION DE PLAZO N03