NO. WCL/LOG/GAIL.

DBNPL/WV I I /2OA
YT
IO
WORK INSRUCTION FOR
WELSPUN HANDLING, STORAGE AI\[D REV. 0
TRANSPORTATION, DATE 23.r0.20t0
Cerp Ltd OF COATED PIPES
PAGE Page I of 7

WORK INSRUCTION FOR HANDLING,


STORAGE & TRANSPORTATION OF
BARE & COATED PIPE

CUSTOMER lWs. GAIL India Limited (GAIL)

P.O. No
FOA NO. GAILND/C&P/PROJ/SPUR.DBNPL/09-II6/IO8 DATED
24.09.20t0
PROJECT
SPURLINES OF DADRI BAWANA NANGAL PIPELINE PROJECT
(pBNPL)

PIPEDIAMETER WALLTHICKNESS
SR NO. STEELGRADE
(nm) (mm)
I 610 t2.70 API 5L X 70 PSL2
PIPE SIZE
2. 610 15.90 API5LXTO PSL2

3. t14.3 6.40 API5L X42 PSLZ

ISSUED BY : LOGISTICS DEPARTMENT


,^
ISSUED TO : FOR CLIENT'S APPROVAL

Prepared by Reviewed by Appioved by Approved by


Manager (Logistics) Head (QA) Head (Logistics) Client a

"1
&q\{n
^ Fri!,I
/\S3iSertr
l( ;iJPT.q
JJ;ter.l tt;anager (proj
.-!vtEcoN LtMtTED
(6ovt._of lndia Enterprise)
-^..
13th Floor, Scope Minal North-
Lrrmi Negar, Dislricl Cenk, Dthi..l
NO. WCULOG/GAIL-DBNPUWVI
YT WORK INSRUCTION FOR
HANDLING, STORAGE AI\D REV.
{) I I 2OA

WELSPU N 0
TRANSPORTATION, DATE 23.r0.20r0
C*rp ltd OF COATED PIPES
PAGE Page2of 7

I l.o PURPoSE:
I

I The purpose of this work instruction is to establish and maintain documented procedure that describes
method for handling storage & hansportation via rail road or marine shipmeni of bare pipes
I
I manufactured by WELSpLJN.

l
ro scoPE:

This section covers the instructions for pipe handling, storage & transportation to deliver the product as
I
I
I
ner customer specification and purchase order requirements.

3.0 RESPONSIBILITY:

3.1 HOD -Logistics shall be overall responsible for implementation of the procedure & respective plant
Head - QC shall ensure the implementation in line wit[this procedure.

4.0 HANDLING

Pipes shall be handled in safe & careful manner by skilled workmen to avoid damage due to impact /
janing.
4.I HAITDLING EQUIPMENTS:
Vacuum cranes, Mobile crane, Hydra, EOT cranes equipped with spreader bars, suitable slings,
shackles and hooks lined / padded by Teflon/rubber/other cushioning material excluding brai,-
copper, bronze & u.ry other copper alloy shall be used for handling / transportation of pipes.
4.1.t SPREADER BARS,I-BEAMS AtrD HANGERS:

I-Beams are of adequate capacity & placed at the centre of the pipe i.e.20-2t Ft. (Approx. half the
Length of the Pipe)
Side hangers are 8 to 12 Ft. long with eye holes to hook the slings.

Hangers are fixed to the barter beam with quarter pin to provide flexibility at the time of lifting.

4.I.2 .WIRE SLINGS / WEBBING SLINGS:

Wire Slings of sufficient length from the cranes hooks to the bars shall be at angle not less than l0o
and not more than 45". Alternatively, webbing slings of adequately capacity may be used.

4.r3 HOOKS:

Portion of the hook's jaw clamping the beveled edge of pipe shall be lined / padded / Bare with
Teflon/rubber / other cushioning maGrial excluding brass, copper, bronze & *v other copper
alloy.
4.I.4 BEVEL EIYD PROTECTORIEIID CAPS :
The bevelled end of pipes will be protected by metallic bevel end protector. The thickness of end
protector ranges from 0.E mm to 1.6 mm.
5.0. STACKING OF PIPES IN TIIE PIPE STORAGE YARD ;
w u'ELSPUN
WORK INSRUCTION FOR
HAI\IDLING, STORAGE AI\D
TRANSPORTATION,
NO.

REV.

DATE
WCULOG/GAIL-DBNPUWY
0

23.t0.2010
IO I I /2OA

Cerp Ltd OF COATED PIPES


PAGE Page 3 of 7

5.1 a) Pipe should be stacked on sand rows covered with plastic sheet of thick Gauge, Sand to be free
from stones and necessarily covered.

b) Alternatively, Pipes may be stacked on wooden sleepers.

c) No of support (Bearing) shall be minimum 2 rows.

s..2 Bar code should be applied on both ends ofpipes.

5.3 STACKING PATTERN:


5.4 Stack should be slightly slopping to drain off rain water.

5.4.1 Stack should be in trapezoidal from to.avoid collapsing

5.5 STACK HEIGHT:

5.5.r The pipe stack height in the yard is depended on pipe size &grade of steel pipe. This is calculated as
per recommendation of API RP sl,l.

The static load stress is calculated by following equation:

o;
o, = 0.2.JD Y r" {3J for usc units

9,05 x IO4JD
Y?^ (ii t* sr irnits

where

Stacking load factor whichis tbs number of


rorvt m the prpe load, whetherprovided wih
separatof sfrips of nested,

L maximrrm leLrrth of indiriduat Fpe, ft (ln).

a effectir,e number of beurng strips. Dirnensioos


of be;uin-e suips shall com1ily rvith 3-1,
D spcif,ed OD of flpe, in. (uun),
t sp,ecified wall thickness. in (rnrn).

h,1 uarural loearith'nof


-f, L

5.5.2 Pipe stacking pattern on sand rows et pipe yard:


' n. Width ofthe sand rows - 1.5 feetminimum
b. Distance between 2 sand rows- 20 fect minimum
c. Height of sand rows - l.2feetminimum
d. No. of pipe layers as per table mentioned below
NO. wcuLoc/GAIL-DBNPLAvI/ |0 I I /204

\ry' WORK INSRUCTION FOR


HANDLING, STORAGE AND REV. 0
WETSPUH TRANSPORTATION, DATE 23.t0.20t0
C*rB lfd OF COATED PIPES PAGE Page4of 7

SR. NO PIPE SIZE As per API RP 5Ll As per Actual No of


of pipe layers pipe layers
ODxWT
610 mm x 12.70 mm 22 I
2 610 mm x 15.90 mm 29 I
3 I14.3 mm x 6.40 mm 137 25

6.0 TRANSPORTATION:

6.I TRAILERS:

6.1. I ldeally low-bed trailers are used. In case of semi low beds trailers an even platform shall be created
by placing a single block or log on the lower end of the trailer bed.

6,1.2 The approximate size of the sleepers shall be of 8.5 Ft. lenglh X 6" width X 4" height OR 8.5 Ft.
length X 5" width X 4" height

6.1.3 Number of pipe loadod on each trailer shall be dependent upon the size and grade of steel pipe as per
API RP5LI.
Pipe stacking pattern on trailer:
a. Width of the trailer - 8.5 feet Maximum

b. I-ength of the trailer - 40 feet

No. of pipe tayers as per mentioned table below

lNol
| | lasperAPliPsLl|
1 B=2 |
I

| 2 | 6l0mmx15.90mm I U | 3 I

I e I tt+.lmmxe.aomm I ee I tz I

B = Bearing Wooden Sleeper Width = 5" minimum.


L = Length of Wooden Sleeper : E.2 feet minimum.

H = Height of Wooden Sleeper:4" minimum


NO. WCULOG/GAIL-DBNPUWU IOI I 2OA
)nr
u,ELSPU N
WORK INSRUCTION FOR
HANDLING, STORAGE ANI) REV. 0
TRANSPORTATION, DATE 23.10.20t0
C*rp Ltd OF COATED PIPES
PAGE Page 5 of 7

PROJECT : GAIL INDIA LIMITED

WIDTH OF TMILER = t.6 FEET


LEIGIH OF TRAILER = ro FEET
a
XUXBER OF SLEEPER PER TRAILER IBASE. 2+ TOP .3 5 SLEEPER
=

]{UIBER OF RATCHET BELT OR C}|A|I{ FOR tASHt}tG pER TMTLER 3 t{OS


=

Aqhq6
A.Ll:l- l(. ,ttf PTA
Assis-a;.rr :::tJi;i ;rianager (project)
MECON LIMITED
(Govt. of India Enterprjs@)
13th Fioor, Scope Minar, North Tower
Laxmi Nagar, Districl Centre, Delhi-j10092
\Y
WELSPUN
WORK INSRUCTION FOR
HANDLING, STORAGE ANI)
NO.

REV.
WCULOG/GAI L-DBNPUWI I I O I I NO A

0
TRANSPORTATION, DATE 23.10.2010
C*rp ltd OF COATED PIPES
PAGE Page6of 7

PROJECT: GAIL INDIA LIMITED


Slz. l{o.of DID- Dartrrlla!
z.r- (buc.o mm uu x 15.90 mm wT I

WIDTH OF TMILER =E.5 FEET

LEIIGTH OF TRAILER T TO FEET

NUTBER OF SLEEPER PER TRAILER T 2 SLEEPER

I{UIBER OF RATCHET BELT OR CHAil FOR LASHI}IG PER TRAILER = 3 iloS

MECON LIMITED
(Govt. of lndia Enterprise)
13th Floor, Scope Minar, North Tc
WORK INSRUCTION X'OR WCULOG/GAIL.DBNPUWII IO I I I2O A

WELSPU N HAIYDLING, STORAGE AND


TRANSPORTATION,
Crrp l.ld OF COATED PIPES

PROJECT: GAIL INDIA LIMITED


SIZE:Il{.llll{ r6.4 l|t
PIPE PER TRAILER. 160 ilor.

102 rilcH
( 8.5 FEEr )

WIDTH OF TRAILER r 8.E FEET

LENGTH OF TRAILER T .O FEET

ilt ilBER OF SLEEPER PER TRATLER r 2 SLEEpER

ilUnBER OF RATCHET AELT OR CHATN FOR ttSHtilc pER TRATLER 3 ltOS


=

6.2.1 MATERIAL TO BE USED - WIRE SLINGS / RUBBER STRAPS

6.2 LASHING DI.JRING TRANSPORTATION:


6.2.1. I Pipes shall be lashed down or secured by a minimum of three convenient buckle and strap load wire
slings, chain or other suitable soft material. It shall be ensured that lashing wire slings are always on
rubber packing & do not come in contact with the pipe body. The tightening mechan-ism of the strap
shall not be allowed to come in contact with the pipes. '

6.2.1.2 Minimum 3 ratchet belts or chains will be placed on the bare pipes during the transportation.