Você está na página 1de 22

DOWNTOWN DUBAI DEVELOPMENT

VOLUME 4

TENDER DRAWINGS

HVAC DRAWINGS
NOTES:-

MISCELLANEOUS DUCT WORK GENERAL DRAWING NOTES


EQUIPMENT COMPONENT CODE COMPONENT CODE

COMPONENT COMPONENT ABBREVIATION ABBREVIATION 1. THE MECHANICAL DRAWINGS SHALL BE READ AS ONE UNIT
DESCRIPTION DESCRIPTION DESIGNATION DESIGNATION
SYMBOL DESIGNATION OR SYMBOL OR SYMBOL INCLUDING PLANS, RISER DIAGRAMS AND MISCELLANEOUS
CODE CODE
DETAILS.
GV GATE VALVE VD VOLUME DAMPER TYP TYPICAL DUCT SIZE : 1st FIGURE SIDE SHOWN,
2. MECHANICAL DRAWINGS SHALL BE READ WITH THE
AIR HANDLING UNIT 500 x 200 2nd FIGURE SIDE NOT SHOWN, ARCHITECTURAL, STRUCTURAL, ELECTRICAL, PLUMBING &
CV CHECK VALVE FD FIRE DAMPER C/W COMPLETE WITH
SIZE IS IN mm OTHER DRAWINGS FOR COORDINATION, VERIFICATION OF
TH THERMOMETER SD SUPPLY DUCT DPV DIFFERENTIAL PRESSURE CONTROL VALVE ADEQUATE SPACES AND EARLY DETERMINATION OF ANY
CONTRADICTIONS OR INTERFERENCE PER THE PROVISIONS OF
PG PRESSURE GAGE ED EXHAUST DUCT NTS NOT TO SCALE THE SPECIFICATION.
CHANGE IN ELEVATION OF
FAN COIL UNIT
BFV BUTTERFLY VALVE RD RETURN DUCT FFL FINISHED FLOOR LEVEL DUCT RISE -(R) DROP-(D) 3. THE DRAWINGS ARE ISSUED FOR MECHANICAL WORKS ONLY
AND SHALL NOT BE USED FOR ARCHITECTURAL, STRUCTURAL
M
MBFV MOTORIZED BUTTERFLY VALVE FAD FRESH AIR DUCT AI ANALOG INPUT OR OTHER WORKS.

AAV AUTOMATIC AIR VENT SLG SUPPLY LINER GRILLE AO ANALOG OUTPUT 4. DRAWINGS SHALL NOT BE SCALED FOR EXECUTING THE
CENTRIFUGAL FAN ELBOW UP SUPPLY WORKS. ALL MEASUREMENTS SHALL BE MADE FROM
FM FLOW METER RLG RETURN LINER GRILLE DI DIGITAL INPUT ESTABLISHED LINES, LEVELS & BENCH MARKS.

ER ECCENTRIC REDUCER SLD SUPPLY LINEAR DIFFUSER DO DIGITAL OUTPUT 5. FOR EQUIPMENT CAPACITIES, RATINGS, TYPES AND
CHARACTERISTICS REFER TO THE "SCHEDULE OF EQUIPMENT"
CR CONCENTRIC REDUCER SCD SUPPLY CEILING DIFFUSER NO NORMALLY OPENED DRAWINGS.
CENTRIFUGAL INLINE FAN ELBOW DOWN SUPPLY
FL FLOW LIMITER RCD RETURN CEILING DIFFUSER NC NORMALLY CLOSED 6. FOR EQUIPMENT HOOK-UPS AND CONTROL DIAGRAMS REFER
TO THE "MISCELLANEOUS DETAILS" DRAWINGS.
BST BASKET STRAINER SAR SUPPLY REGISTER UP UP
7. MECHANICAL WORKS REQUIRING ELECTRICAL SERVICES AND
AXIAL INLINE FAN FC FLUSHING CONNECTION RAR RETURN REGISTER DN DOWN ELBOW UP FRESH AIR PLUMBING SHALL BE COORDINATED WITH THE ELECTRICAL
AND PLUMBING TRADES, RESPECTIVELY.
SD SUCTION DIFFUSER ER EXHAUST REGISTER DP DRAIN POINT
8. PIPE, DUCTS, INSULATION MATERIALS WHEN NOT SHOWN ON
T THERMOSTAT DL DOOR LOUVER FD FLOOR DRAIN DRAWINGS SHALL BE AS PER SPECIFICATIONS.
COMPUTER ROOM AIR CONDITIONING UNIT ELBOW UP FRESH AIR
BTU BTU METER TD TRANSFER DUCT B1 / BAS. BASEMENT FLOOR 9. ALL SIZES SHOWN ON DRAWINGS ARE IN mm, EXCEPT
OTHERWISE NOTED.
SV SOLENOID VALVE RAO RETURN AIR OPENING GR GROUND FLOOR
10. ACCESSORIES INDICATED ON THE FLOOR PLANS DRAWINGS
EM ENERGY METER FAL FRESH AIR LOUVER GM GROUND MEZZANINE FLOOR DO NOT INCLUDE ALL ACCESSORIES INTENDED FOR THE
AIR BLOWER ELBOW UP EXHAUST PROJECT. THE CONTRACTOR SHOULD REFER TO
PV PLUG VALVE EXL EXHAUST AIR LOUVER RF ROOF SPECIFICATIONS, EQUIPMENT HOOK-UP DETAILS, P&ID KEY PLAN
MISCELLANEOUS DETAILS, CONTROLS,...ETC, AND PROVIDE
BV BALL VALVE FAO FRESH AIR OPENING UR UPPER ROOF ANY MISSING ACCESSORIES ACCORDINGLY.

HEAT EXCHANGER VERTICAL PUMP DT DRAIN TRAP LL LOW LEVEL 11. ALL PIPE RUNS SHOWN ARE ABOVE CEILING EXCEPT WHERE
ELBOW DOWN EXHAUST
NOTED OTHERWISE.
FC FLEXIBLE CONNECTION HL HIGH LEVEL
12. PIPE MATERIAL WHEN NOT SHOWN ON DRAWINGS SHALL BE
YS Y TYPE STRAINER
AS PER SPECIFICATION.
HEAT EXCHANGER PLATE PIPING CODE
LV GLOBE VALVE DUCT ELBOW 13. REFER TO ARCHITECTURAL CEILING PLANS FOR EXACT
LOCATION OF ALL CEILING MOUNTED AIR DISTRIBUTION
FV FLOAT VALVE
DEVICES.
SYMBOL DESIGNATION
AT AIR TRAP
14. COORDINATE EXACT LOCATION OF GRILLES, REGISTERS AND
SG SIGHT FLOW GLASS AIR OUTLETS DIFFUSERS WITH ARCHITECTURAL REFLECTED CEILING PLANS.
ELBOW UP DUCT ELBOW WITH TURNING VANES
IF A PARTICULAR ITEM IS NOT SHOWN ON THE
FH FLEXIBLE HOSE ARCHITECTURAL REFLECTED CEILING PLAN, PREPARE A
ELBOW DOWN DRAWING AND PRESENT IT TO THE ARCHITECT FOR HIS
SYMBOL DESIGNATION REVIEW AND / OR APPROVAL.
QC QUICK COUPLING (HOSE CONNECTOR) TEE UP

PRESSURE GAUGE SQUARE ELBOW WITH TURNING VANES 15. COORDINATE THE EXACT LOCATION AND SIZE OF ALL ROOF
PG TEE DOWN
AND SLAB PENETRATIONS WITH THE ARCHITECT PRIOR TO
GV GATE VALVE EXECUTION OF HVAC WORKS.
BRANCH OUT OF TOP SUPPLY LINER GRILLE

CV CHECK VALVE 16. MAINTAIN DUCTWORK LEVEL AS HIGH AS POSSIBLE UNLESS


BRANCH OUT OF BOTTOM
NOTED OTHERWISE.
RETURN OR EXHAUST DUCT IN SECTION
FC FLUSHING CONNECTION POINT OF CONNECTION IN PIPES RETURN LINER GRILLE 17. DUCT SIZES ARE SHOWN AS INSIDE CLEAR DIMENSIONS.
EQUIPMENT CODE OP ORIFICE PLATE DIRECTION OF FLOW WHERE INTERNAL INSULATION IS CALLED FOR, DIMENSIONS
SHALL BE INCREASED BY THE THICKNESS OF THE INSULATION.
ST BASKET STRAINER CONCENTRIC REDUCER
ABBREVIATION DESIGNATION SUPPLY LINEAR DIFFUSER FRESH AIR DUCT IN SECTION 18. CONTRACTOR SHALL COORDINATE VOLTAGE AND PHASE OF
RV RELIEF VALVE ECCENTRIC RED.-FLAT ON BOTTOM EACH PIECE OF EQUIPMENT WITH THE ELECTRICAL
CONTRACTOR, AND ALL ELECTRICAL CONTRACT DOCUMENTS
AHU AIR HANDLING UNIT PICV PRESSURE INDEPENDENT CONTROL VALVE ECCENTRIC REDUCER-FLAT ON TOP PRIOR TO ORDERING.
SUPPLY CEILING DIFFUSER
FCU FAN COIL UNIT PRV PRESSURE REGULATING VALVE FLEXIBLE CONNECTION SUPPLY DUCT IN SECTION 19. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE THE
ADEQUATE NUMBER OF VOLUME DAMPERS AS
EAF EXHAUST AIR FAN PSV PRESSURE SUSTAINING VALVE PIPE CAP RECOMMENDED BY THE TAB ENGINEERS TO ACHIEVE PROPER
SUPPLY REGISTER AIR BALANCING.
FAF FRESH AIR FAN PS & CV PRESSURE SUSTAINING & CHECK VALVE FLEXIBLE HOSE FOR FILLING
20. REFER TO PLUMBING DRAWINGS FOR CONDENSATE DRAIN
FAHU FRESH AIR HANDLING UNIT DV DRAIN VALVE FLEXIBLE CONNECTIONS LINES. C COPYRIGHT
This drawing and design remains the property of Allied Consultants and
RETURN REGISTER
AB AIR BLOWER MF&SD MOTORIZED FIRE AND SMOKE DAMPER 21. REFER TO ARCHITECTURAL DRAWING FOR EXACT SIZE, may not be copied in any way without prior written approval from this
LOCATION AND MOUNTING HEIGHT OF ALL LOUVERS AND / OR company.
CU CONDENSING UNIT SERVICE LINES EXTERIOR WALL MOUNTED DEVICES.
EXHAUST REGISTER VOLUME DAMPER
22. ALL AC MACHINES SHALL BE INSTALLED WITH VIBRATION
CHILLED WATER SUPPLY VD ISOLATORS.

CHILLED WATER RETURN VD 23. ALL DUCT BEND AND ELBOW WHICH IS MORE THAN 400mm
DOOR LOUVER WIDTH SHALL BE PROVIDED WITH GUIDE VANE.
VOLUME DAMPER ( FOR LINER DIFFUSER )
24. DURING THE PROCESS OF THE WORK , ALL OPEN ENDS OF
PIPES ,DUCTS ETC. SHALL BE SUITABLE CAPPED TO PREVENT
VOLUME DAMPER THE INGRESS OF FOREIGN MATTER.
FD
FLUID CODE
FIRE DAMPER 25. ALL EQUIPMENT, PIPING, CONDUIT OR ANY PORTIONS OF DUCT
WORK VISIBLE THROUGH SLOTS ,GRILLES ,REGISTERS OR
CHWS CHILLED WATER SUPPLY FIRE DAMPER DIFFUSERS IN FINISHES AREAS SHALL BE PAINTED FLAT
BLACK.
CHWR CHILLED WATER RETURN
SPLITTER DAMPER 26. ALL FIRE DAMPERS TO BE PROVIDED WITH ACCESS DOORS
RF REFRIGERANT BELL MOUTH COMPLETE WITH INSIDE DUCTS FOR MAINTENANCE.
ALUMINUM WIRE MESH SCREEN SD
CD CHEMICAL DOSING

HVAC WORKS
LEGEND AND ABREVIATIONS

I.H.H/A.S.H A.K.M A0

M.S.O. A.A.G. N.T.S.

D1508-TD-DWG-MG-00002 0
NOTES:-

1 2 3 4

KEY PLAN

5 6 7 8
C COPYRIGHT
This drawing and design remains the property of Allied Consultants and
may not be copied in any way without prior written approval from this
company.

HVAC WORKS
GENERAL DETAILS (2 OF 4)

I.H.H & A.S.H. A.K.M A0

9 10 M.S.O. A.A.G. N.T.S.

D1508-TD-DWG-MH-00702 0
NOTES:

E G I

20 mm 20 mm
FAD CHWS CHWR
150x200
FAD OPENING C/W 250 mm 300 mm 250 mm FAD
ALUMINUM WIRE MESH CHWS CHWR CHWR 150x200 150 mm 150 mm 80 mm 80 mm C
SCREEN 30 L/S B CHWR CHWS CHWR CHWS
BTU BFV BFV
80 mm 80 mm
MFSD CHWS CHWR
MFSD MFSD
20 mm VD
50 CHWS&R FAD
T CHWS UP TO FAHU-RF-01 200x200 UP
EXT-RF-01 BFV BFV
50 mm
FAD
CHWS
20 mm 200x200 UP

BTU

BTU

BTU
BTU
CHWR A.H.U 50 mm
H.E.X
200 mm ROOM RF07 CHWR
CHWS RF06

300 mm 300 mm 100 mm


CHWS CHWR BFV CHWR
300 mm 200 mm
A A
CHWS CHWS
100 mm
FCU-RF-05 PHEX-RF-01 CHWS
3' 3'
FOR HEX ROOM DETAIL 300 mm 300 mm 200 mm BTU BFV
3 TP-RF-01 CHWS TP-RF-02 150 CHWS&R ED 2600x1000 3
REFER TO DWG. NO. CHWR CHWS UP FROM
DN TO FUTURE
D1508-DD-DWG-MH-00704 HEAT EXCHANGER ROOM SCALE 1:50 PARKING FLOOR
B EXTENSION AREA
C

E G I

3' 3 E

UPPER ROOF LEVEL UPPER ROOF LEVEL UPPER ROOF LEVEL UPPER ROOF LEVEL
19300 19300 19300 19300 KEY PLAN
150 mm 300 mm
300 mm 300 mm 300 mm
CHWR 300 mm CHWR
FCU-RF-05 CHWR CHWS CHWR 300 mm
CHWS 300 mm
150 mm CHWS
CHWS
CHWS

08-PARAPET 08-PARAPET 08-PARAPET 08-PARAPET


MV
18000 50 mm BFV
18000 18000 18000
CHWR BFV PHEX-RF-01

200 mm BFV
CHWS
FC
ST
CV
BFV
200 mm
EXT-RF-01
ST TP-RF-02 CHWS ST
PG TH
FC PG TH
FC FC MBFV

DV DV
07-ROOF LEVEL 07-ROOF LEVEL 07-ROOF LEVEL DV 07-ROOF LEVEL
15300 15300 15300 15300

SECTION (B - B) SCALE 1:25 3' 3 SECTION (A - A) SCALE 1:25


0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.
REV. DATE ISSUED FOR QA COORD. CHECKED APP.

C COPYRIGHT
This drawing and design remains the property of Allied
UPPER ROOF LEVEL UPPER ROOF LEVEL Consultants and may not be copied in any way without
19300 19300 prior written approval from this company

BFV
CLIENT:

150 mm
CHWR 100 mm
CHWR
08-PARAPET 150 mm 08-PARAPET
18000 CHWS 18000

BFV BTU PROJECT CONSULTANT:

100 mm
CHWS
FAD
1000x2600 PROJECT TITLE:

DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04
07-ROOF LEVEL 07-ROOF LEVEL
DRAWING TITLE:
15300 15300

TO FUTURE BFV BFV HEAT EXCHANGER ROOM


EXPANSION AREA
ENLARGED PLAN &
SECTIONS

DESIGNED BY: DRAWN BY: SIZE:

I.H.H A.K.M A0
SECTION (C - C) SCALE 1:25 CHECKED BY:

M.S.O
APPROVED BY:

A.A.G
SCALE:

As indicated
DRAWING No. REV. NO

D1508TDDWGMH00704 0
0
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.

2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL


STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.

3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS


DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES

4. WATER LEVEL IN COOLING TOWER BASIN = 1200 MM

5. HEIGHT OF BASIN COOLING TOWER = 1500 MM

6. THE HANDLING OF COOLING TOWERS MOTORS AND GEARBOX REMOVAL


TO BE PROVIDED BY MANUFACTURER.

7. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
1 INCLUDED IN PIPE SUPPORT COST.
D1508-TD-DWG-MP-00402
8. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED
MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.

9. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON


DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.

10. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
IN PIPING COST.

11. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID


ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
7 6 5 4 3' 3 2 1 MONORAIL COST.

12. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS


SHALL BE THROUGH FLEXIBLE COPPER TUBES.

13. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY
08-TOP PARAPET 08-TOP PARAPET INVOLVED IN THE FIELD.
32000 32000 14. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO
MANUFACTURE'S RECOMMENDATION.
CATWALK LEVEL 02 CATWALK LEVEL 02
15. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS
30400 30400 TO BE CONDUCTED BY 3RD PARTY.

16. CONTRACTOR TO PROVIDE PLATFORM AND STAIRS FOR ACCESS TO


FACILITATE MAINTENANCE FOR VALVES INSTALLED ON HIGH LEVEL.

FC FC 17. CONTRACTOR TO PROVIDE CTI TEST POINTS REQUIRED FOR CTI TESTING.

600 600 18. ARRANGEMENT SHOULD BE PROVIDED BY CONTRACTOR FOR COOLING


CWR CWR TOWER MOTOR AND GEAR BOX HANDLING INCLUDING MOTOR/GEAR
REMOVAL AND CONCRETE CORRIDOR PATH FROM C.T. UP TO EQUIPMENT
FM FM ELEVATOR FOR USE OF TROLLY.

19. CHILLER INSTRUMENTATION TO BE INSTALLED IN ACCESSIBLE LOCATION AND AT


EYE LEVEL.

LCV LCV

ANTIVORTEX PLATE
BFV BFV
BY C.T. SUPPLIER
CATWALK LEVEL 01 CATWALK LEVEL 01
21600 21600
08-UPPER ROOF LEVEL 08-UPPER ROOF LEVEL
20300 20300
UPPER ROOF LEVEL UPPER ROOF LEVEL
19300 FC 19300
FC
FC MBFV FC
MBFV BFV
BFV BFV
BFV

KEY PLAN
07-ROOF LEVEL 07-ROOF LEVEL
15300 15300

BFV BFV
BFV
P.P OP OP C.P BS BFV
PG PG CV CV PG
FC FC FC FC

SD

06-FIRST FLOOR LEVEL DP DP DP DP 06-FIRST FLOOR LEVEL


9300 9300

BFV FM

FLC FM

05-GROUND MEZZANINE 05-GROUND MEZZANINE


5000 5000
FLC BFV
LCV CH-01 FLC

BFV
TH
TH
PG PG
FC FC

04-GROUND FLOOR 04-GROUND FLOOR


03-SIDEWALK
02-STREET LEVEL 03-SIDEWALK
02-STREET LEVEL 0
0
-500
SUNK SLAB LEVEL
-600 -500
SUNK SLAB LEVEL
-600
-1200 -1200

0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.


REV. DATE ISSUED FOR QA COORD. CHECKED APP.

03-CAR PARKING 03-CAR PARKING C COPYRIGHT


This drawing and design remains the property of Allied
-5200 -5200 Consultants and may not be copied in any way without
prior written approval from this company

CLIENT:

02-BASEMENT 02-BASEMENT
TANK SUCTION
-10500 TANK SUCTION
-10500
-11000 -11000
01-LOWER BASEMENT 01-LOWER BASEMENT PROJECT CONSULTANT:
-12500 -12500

PROJECT TITLE:

DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04

DRAWING TITLE:

MECHANICAL PROCESS
SECTION AA

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMP00401 0
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.

2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL


STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.

3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS


DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES

4. WATER LEVEL IN COOLING TOWER BASIN = 1200 MM

5. HEIGHT OF BASIN COOLING TOWER = 1500 MM

6. THE HANDLING OF COOLING TOWERS MOTORS AND GEARBOX REMOVAL


TO BE PROVIDED BY MANUFACTURER.

7. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
INCLUDED IN PIPE SUPPORT COST.

8. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED


MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.

9. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON


DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.

10. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
IN PIPING COST.

11. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID


1
ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
MONORAIL COST.
D1508-TD-DWG-MP-00401
12. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS
SHALL BE THROUGH FLEXIBLE COPPER TUBES.

A B C D E F G H I J K 13. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY
INVOLVED IN THE FIELD.

14. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO


MANUFACTURE'S RECOMMENDATION.

15. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS


08-TOP PARAPET 08-TOP PARAPET TO BE CONDUCTED BY 3RD PARTY.

32000 32000 16. CONTRACTOR TO PROVIDE PLATFORM AND STAIRS FOR ACCESS TO
FACILITATE MAINTENANCE FOR VALVES INSTALLED ON HIGH LEVEL.
CATWALK LEVEL 02 CATWALK LEVEL 02 17. CONTRACTOR TO PROVIDE CTI TEST POINTS REQUIRED FOR CTI TESTING.
30400 30400
18. ARRANGEMENT SHOULD BE PROVIDED BY CONTRACTOR FOR COOLING
CT CT CT CT
TOWER MOTOR AND GEAR BOX HANDLING INCLUDING MOTOR/GEAR
REMOVAL AND CONCRETE CORRIDOR PATH FROM C.T. UP TO EQUIPMENT
ELEVATOR FOR USE OF TROLLY.

19. CHILLER INSTRUMENTATION TO BE INSTALLED IN ACCESSIBLE LOCATION AND AT


M.W.TANK TOP M.W.TANK TOP EYE LEVEL.
27300 27300

FM FM FM FM

LCV LCV LCV LCV

CATWALK LEVEL 01 CATWALK LEVEL 01


BFV BFV BFV BFV
21600 21600
08-UPPER ROOF LEVEL 08-UPPER ROOF LEVEL
20300 20300
UPPER ROOF LEVEL UPPER ROOF LEVEL
FC FC FC FC
19300 19300
BFV BFV BFV
BFV
KEY PLAN
EQUALIZER LINE EQUALIZER LINE EQUALIZER LINE
650 650 650

07-ROOF LEVEL 07-ROOF LEVEL


15300 15300

1200 1200
CWS CWS

C.P C.P C.P C.P C.P C.P C.P C.P

06-FIRST FLOOR LEVEL 06-FIRST FLOOR LEVEL


9300 9300

1200
CWR

05-GROUND MEZZANINE 05-GROUND MEZZANINE


5000 5000

CH-01 CH-01 CH-01 CH-01 CH-01 CH-01 CH-01

04-GROUND FLOOR 04-GROUND FLOOR


03-SIDEWALK
02-STREET LEVEL 03-SIDEWALK
02-STREET LEVEL
0 0
-500
SUNK SLAB LEVEL
-600 -500
SUNK SLAB LEVEL
-600
0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.
-1200 -1200
500 REV. DATE ISSUED FOR QA COORD. CHECKED APP.
CHWR
500
CHWS C COPYRIGHT
This drawing and design remains the property of Allied
Consultants and may not be copied in any way without
prior written approval from this company
03-CAR PARKING 03-CAR PARKING
-5200 -5200 CLIENT:
TES

02-BASEMENT 02-BASEMENT
PROJECT CONSULTANT:
-10500SUCTION
TANK TANK SUCTION
-10500
-11000 -11000
01-LOWER BASEMENT 01-LOWER BASEMENT
-12500 -12500

PROJECT TITLE:

DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04

DRAWING TITLE:

MECHANICAL PROCESS
SECTION BB

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMP00402 0
NOTES:-

1 2 3

KEY PLAN

4 5 6 C COPYRIGHT
This drawing and design remains the property of Allied Consultants and
may not be copied in any way without prior written approval from this
company.

MECHANICAL PROCESS
GENERAL DETAILS
(3 OF 6)

M.M.M. W.I.A. A0

7 8 9 M.S.O. A.A.G. N.T.S.

D1508-TD-DWG-MP-00703 0
STRAINER
NOTES:

A B C D F G H I J K
1
D1508-TD-DWG-MP-00401

7 7

6 6

1
D1508-TD-DWG-MP-00402

1000 CHWS UP
UP TO GROUND FLOOR

5 300 CHWS UP
5
TO GROUND FLOOR
1000 CHWR UP
TO FIRST FLOOR

UP 1000
300 CHWR
CHWS KEY PLAN
900
CHWS
MBFV
BTU

MECHANICAL SEAL

BFV

4 1000
4
CHWS 1000
CHWR

MBFV
BFV

1000
CHWR
1000
CHWS
3' 3'
3 3

CONTRACTOR TO COORDINATE
CHILLED WATER PIPING TIE IN
POINT EXACT LOCATION WITH
CHILLED WATER NETWORK
INFRASTRUCTURE CONSULTANT.

1 MARCH. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.

0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.


REV. DATE ISSUED FOR QA COORD. CHECKED APP.

C COPYRIGHT
This drawing and design remains the property of Allied
Consultants and may not be copied in any way without
prior written approval from this company

CLIENT:
2 2

PROJECT CONSULTANT:

1 1 PROJECT TITLE:

DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04
A B C D F G H I J K
DRAWING TITLE:

MECHANICAL PROCESS
CAR PARKING PLAN

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMPB1201 1
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.

2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL


STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.

A B C D E F G H I J K 3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS


DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES

4. REFRIGERANT VENT SYSTEM SIZES AND CONNECTION TO BE VERIFIED


1 BY CONTRACTOR ACCORDING TO MANUFACTURER RECOMMENDATION.
D1508-TD-DWG-MP-00401
5. ALL FLUSHING CONNECTIONS ARE WITH END CAPS.

6. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
100 mm GAP FOR 100 mm GAP FOR 100 mm GAP FOR THERMAL INSULATION STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
THERMAL INSULATION THERMAL INSULATION THERMAL INSULATION APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
POLYURETHAN OR POLYURETHAN OR POLYURETHAN OR INCLUDED IN PIPE SUPPORT COST.
POLISOCYANURATE POLISOCYANURATE POLISOCYANURATE

7. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED


MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.

8. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON


7 11 10 9 8 7 6 5 4 3 2 1
7 DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.
UP
9. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
65 65 65 65 IN PIPING COST.
32 33 34 35 36 37 38 39 40 41 CHWS CHWS CHWS CHWS
10. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID
MBFV
ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
500
MONORAIL COST.
CHWR
500
CHWS 11. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS
BFV SHALL BE THROUGH FLEXIBLE COPPER TUBES.
MBFV MBFV
500
CHWS
TES TANK - 01
FC
515 m 100 mm GAP FOR 12. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
THERMAL INSULATION TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY
MBFV
MBFV
B01 POLYURETHAN OR
POLISOCYANURATE
INVOLVED IN THE FIELD.

MBFV MBFV 13. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO
MANUFACTURE'S RECOMMENDATION.
FM PSV
PSV BFV
14. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS
65 MBFV TO BE CONDUCTED BY 3RD PARTY.
CHWS
15. FOR EXACT MOTORIZED VALVES LOCATIONS REFER TO P&ID DRAWINGS.

6 6
500
CHWS

HEXP-01 FC
BFV MBFV
500
CHWS 65 65 65 65
MBFV
CHWS CHWS CHWS CHWS
FM

MBFV

HEX-01
65
CHWS
T.E.S TANK - 02
1
500 BFV
MBFV 550 m
D1508-TD-DWG-MP-00402 CHWS
B02

65
HEXP-02
CHWS

5 5
500
BFV CHWS

FC
MBFV
TES-01
350 400 65 65 65 65
CHWS CHWS
MBFV CHWS CHWS CHWS CHWS TANKS ACCESS HATCH KEY PLAN
T.E.S TANK - 03
MBFV 518 m
BFV CV FC FC BFV
B03
MBFV
BFV
T.E.S PUMPS
350 609 m 400
CHWS CHWS
B07
BFV CV FC FC BFV
65
CHWS

4 BFV
500
CHWS
4
350 400
CHWS CHWS

FC
MBFV
BFV CV FC FC BFV
65
CHWS
65 65 65 65
CHWS CHWS CHWS CHWS
MBFV T.E.S TANK - 04
495 m
100 mm GAP FOR

MBFV
B04 THERMAL INSULATION
POLYURETHAN OR
BFV POLISOCYANURATE

MBFV

3' 65
CHWS
3'
3 3

65
500
CHWS
CHWS

FC 65 65 65 65
MBFV 0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.
BFV CHWS CHWS CHWS CHWS
65 T.E.S TANK - 05 REV. DATE ISSUED FOR QA COORD. CHECKED APP.
CHWS MBFV
527 m
MBFV
C COPYRIGHT
B05 This drawing and design remains the property of Allied
Consultants and may not be copied in any way without
prior written approval from this company
500
BFV
CHWS
CLIENT:
MBFV

2 65 2
CHWS

500
BFV CHWS

T.E.S 65 65 65 65
PUMPS VFD CHWS CHWS CHWS CHWS
FC
B08 MBFV PROJECT CONSULTANT:
BFV
T.E.S TANK - 06
MBFV 491 m
B06
MBFV

11 10 9 8 7 6 5 4 3 2 1

UP
PROJECT TITLE:

12 13 14 15 16 17 18 19
DUBAI DOWNTOWN
1 1 DEVELOPMENT
DISTRICT COOLING PLANT
DCP04
100 mm GAP FOR 100 mm GAP FOR
THERMAL INSULATION THERMAL INSULATION
MECHANICAL SHAFT POLYURETHAN OR POLYURETHAN OR
POLISOCYANURATE POLISOCYANURATE DRAWING TITLE:

MECHANICAL PROCESS
A B C D E F G H I J K
BASEMENT LAYOUT

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMPB2201 0
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.

A B C D E F G H I J K 2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL


STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.
1
3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS
D1508-TD-DWG-MP-00401 DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES

4. REFRIGERANT VENT SYSTEM SIZES AND CONNECTION TO BE VERIFIED


BY CONTRACTOR ACCORDING TO MANUFACTURER RECOMMENDATION.

5. ALL FLUSHING CONNECTIONS ARE WITH END CAPS.

6. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
1200 CWR UP
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
TO C.T SSF-01 STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
1000 CHWR DN CHILLED WATER APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
TO CHILLERS FILTRATION UNIT INCLUDED IN PIPE SUPPORT COST.

7 152151150149148147146145144143142141
7 7. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED
MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.
DP AV BFV SD BFV SD BFV SD BFV SD BFV SD BFV SD BFV SD
UP
1000 1000 1000 1000 1000 1000 1000 8. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON
CHWR CHWR CHWR CHWR CHWR CHWR CHWR DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.
DN DP 500 DP 500 DP 500 DP 500 DP 500 DP 500 DP 500
129130131132133134135136137138139140
CHWR CHWR CHWR CHWR CHWR CHWR CHWR 9. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
PG PG PG PG PG PG PG WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
FC PP-01 FC PP-01 FC PP-01 FC PP-01 FC PP-01 FC PP-01 FC PP-01
200 IN PIPING COST.
MOTORIZED MONORAIL
CHWR FOR EQUIPMENT 4 TON
10. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID
ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
ADRS-01 MONORAIL COST.
AIR & DIRT
REMOVAL SYSTEM

1000
MOTORIZED MONORAIL

CHWR
FUTURE FC FC FC FC FC FC FC 11. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS
4 TON
PG PG PG PG PG PG PG SHALL BE THROUGH FLEXIBLE COPPER TUBES.
CV CV CV CV CV CV CV
12. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY

1000
CHWR
450 450 450 450 450 450 450 EQUIPMENT ACCESS HATCH INVOLVED IN THE FIELD.
VFD ROOM DP CHWR DP CHWR DP CHWR DP CHWR DP CHWR DP CHWR DP CHWR
FF02
WITH HYDRAULIC STEEL COVER
BFV OP OP OP OP OP OP OP 13. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO
1000 1000 1000 1000 1000 1000 1000 1000 CHWS DN MANUFACTURE'S RECOMMENDATION.
CHWR CHWR CHWR CHWR CHWR CHWR CHWR FROM GROUND FLOOR
DECOUPLER LINE
BFV BFV BFV BFV BFV BFV BFV DP AV 14. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS
6 SSF-02 BFV BFV BFV
PUMPS
BFV
AREA BFV BFV BFV REFRIGERANT VENT PIPE 6 TO BE CONDUCTED BY 3RD PARTY.
CONDENSER WATER Not Enclosed 200 TO ROOF
15. EXACT LOCATION & LEVEL OF VALVE CHAMBER SHALL BE VERIFIED
FILTRATION UNIT 1200 1200 1200 1200 1200 1200 1200 1200
BFV
CWS
OP
CWS
OP
CWS
OP
CWS FF01OP
CWS
OP
CWS
OP
CWS
OP
CWS
VERSUS SITE CONDITIONS & EXACT TERMINATION OF CHILLED
WATER NETWORK.
DP AV
DP DP DP DP DP DP DP

CV CV CV CV CV CV CV
500 500 500 500 500 500 500
PG PG PG PG PG PG PG
CWR CWR CWR CWR CWR CWR CWR
350

1200
CWS
FC FC FC FC FC FC FC
CHWR FUTURE

1 VFD ROOM
D1508-TD-DWG-MP-00402 FF03
MOTORIZED MONORAIL
CP-01 CP-01 CP-01 CP-01 CP-01 CP-01 CP-01 4 TON
FC FC FC FC FC FC FC
350
CWS

1200
BS BS BS BS BS BS BS

CWS
5 5

1000
CHWS
PG PG PG PG PG PG PG
1200 CWS UP
FROM C.T 600 600 600 600 600 600 600 EX-01
DP DP DP DP DP DP DP
CWS CWS CWS CWS CWS CWS CWS EXPANSION TANKS

BFV
1200 1200 1200 1200 1200 1200 1200
CWS CWS CWS CWS CWS CWS CWS

BFV BFV BFV BFV BFV BFV BFV DP AV

1200 CWS DN
TO CHILLERS UP 1000 CHWR DN KEY PLAN
FROM GROUND FLOOR

MDB ROOM
FF04

4 4
LOBBY
CORRIDOR FF13
FF08

BATTERY RACK
FF09

MDB ROOM
FF05

CENTRAL BATTERY CHARGER CYLENDERS ROOM

F10 FF11

3' 3'
3 3

MECHANICAL WORKSHOP
1582 m
MDB ROOM
FF12
FF06

0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.


REV. DATE ISSUED FOR QA COORD. CHECKED APP.

C COPYRIGHT
This drawing and design remains the property of Allied
Consultants and may not be copied in any way without
prior written approval from this company

CLIENT:

2 2
A.H.U
FF07

PROJECT CONSULTANT:

140139138137136135134133132131130129128127126125 124123

UP

141142143144145146147148149150151152153154155156
PROJECT TITLE:
1 1
DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04

A B C D E F G H I J K DRAWING TITLE:

MECHANICAL PROCESS
FIRST LAYOUT

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMPFF201 0
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.

2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL


STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.

A B C D F G H I J K 3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS


DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES
1
D1508-TD-DWG-MP-00401 4. REFRIGERANT VENT SYSTEM SIZES AND CONNECTION TO BE VERIFIED
BY CONTRACTOR ACCORDING TO MANUFACTURER RECOMMENDATION.

5. ALL FLUSHING CONNECTIONS ARE WITH END CAPS.

6. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
INCLUDED IN PIPE SUPPORT COST.
PORTABLE REF.
RECOVERY RRV-01
7. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED
MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.

7 88 87 86 85
7 8. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON
DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.
UP
9. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
1000 1000 1000 1000 1000 1000 1000
CHWR CHWR CHWR CHWR CHWR CHWR CHWR WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
CW 1 IN PIPING COST.
DP AV
89 90 91 92 93 94 95 96 97 98

10. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID


1200 1200 1200 1200 1200 1200 1200 ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
CWR CWR CWR CWR CWR CWR CWR FLOOR MARKING MONORAIL COST.
CHILLERS ACCESS DP AV
1000 CHWR FLC FLC FLC FLC FLC FLC FLC 11. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS
FLC FLC FLC FLC FLC FLC FLC
DN BFV BFV BFV BFV BFV BFV BFV SHALL BE THROUGH FLEXIBLE COPPER TUBES.
FROM P.P
500 500 500 500 500 500 500
1000 CWR UP 600 600 600 600 600 600 600 12. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
CHWR CHWR CHWR CHWR CHWR CHWR CHWR
TO C.T CWR CWR CWR CWR CWR CWR CWR
FM FM
CHILLERS
FM
HALL FM FM FM FM
GRAY EPOXY PAINT TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY
INVOLVED IN THE FIELD.
OVERHEAD CRANE BFV BFV BFV 1538 m 199100
BFV BFV BFV BFV
FOR CHILLERS,7.5 TONS CH-01 CH-01 CH-01 CH-01 CH-01 CH-01 CH-01 13. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO
FM FM FM GR01 FM FM FM FM YELLOW EPOXY PAINT MANUFACTURE'S RECOMMENDATION.
EQUIPMENT ACCESS HATCH
MBFV 1000 CHWS UP
WITH HYDRAULIC STEEL COVER FUTURE 14. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS
TO FIRST FLOOR
TO BE CONDUCTED BY 3RD PARTY.
PG PG PG PG PG PG PG PG PG PG PG PG PG PG
TH TH TH TH TH TH TH TH TH TH TH TH TH TH REFRIGERANT VENT PIPE 15. FOR EXACT MOTORIZED VALVES LOCATIONS REFER TO P&ID DRAWINGS.
FC FC FC FC FC FC FC FC FC FC FC FC FC FC DECOUPLER
6 200 TO ROOF
6 16. CHILLER INSTRUMENTATION TO BE INSTALLED IN ACCESSIBLE LOCATION AND AT
MOTORIZED MONORAIL EYE LEVEL.
FOR BASEMENT
EQUIPMENT 4 TON

FM

ELEC. ROOM
9 m 13200 CHILLED WATER CHEMICAL
GR02 TREATMENT STATION

1
D1508-TD-DWG-MP-00402
FIRE COMMAND CENTRE
9 m 13200

1000
CHWS
GR03

FLC FLC FLC FLC FLC FLC FLC 300 CHILLED WATER
FLC FLC FLC FLC FLC FLC FLC
BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV BFV CONNECTION FROM DCP
LCV LCV LCV LCV LCV LCV LCV LCV LCV LCV LCV LCV LCV LCV MAIN PIPE TO SERVE
PG PG PG PG PG PG PG BFV
PG PG PG PG PG PG PG PLANT BUILDING SERVICES
TH TH TH TH TH TH TH TH TH TH TH TH TH TH FOR CONT. REFER TO
FC FC FC FC FC FC FC FC FC FC FC FC FC FC DWG.NO. D1508-TD-DWG-MH-GR200

5 GRP TANK GR03


26 m 21700 600 500 600 500 600 500 600 500 600 500 600 500 600 500
5
GR04
DP AV CWS CHWS CWS CHWS CWS CHWS CWS CHWS CWS CHWS CWS CHWS CWS CHWS

1000 1000 1000 1000 1000 1000 1000 1000


CHWS CHWS CHWS CHWS CHWS CHWS CHWS CHWS

1000 CHWS
1200 1200 1200 1200 1200 1200 1200 DN
CWS CWS CWS CWS CWS CWS CWS
1000 CHWR
DP AV
UP TO P.P KEY PLAN
300 CHWS DN
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1200 CWS DN
UPC.P
FROM
GENERATOR ROOM 14
33 m 23700 15 13
GR05 16 12
17 11
18 10
19 9 28 27 26 25 24 23 22 21 20 19 18 17 16 15
20 8
CHARGER ROOM BATTERY ROOM 21 7
22 6
14 m 16200 18 m 17500
GR06 GR07 23 5
24 4

SERVICE LANE SERVICE LANE


25 3
26 2
27 1
28

4 4
TOILET
LOCKERS 4 m 8300 RECEPTION
20 m 29100 P-04 TOILET 44 m 40000
GR22 3 m 6700 GR21
P-05 RC2
DCP ENTRANCE
OPERATION AND
CEHMICAL STORAGE MAINTENANCE AREA
26 m 21400
GR14 633 m 166600
TR. ROOM
58 m 32200
GR08 GR-23 W3 LOBBY
42 m 33800
GR20

M.V.S.G
181 m 60300
GR11

STORE
4 m 8100
GR19
CORRIDOR
94 m 92000
GR13
3' 3'
3 3

1 MARCH. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.

0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.


REV. DATE ISSUED FOR QA COORD. CHECKED APP.

DN PARKING
C COPYRIGHT
This drawing and design remains the property of Allied
TR. ROOM
CYLENDERS ROOM Consultants and may not be copied in any way without
58 m 31400
GR09 22 m 19300
GR15 prior written approval from this company

CLIENT:

2 2

IT ROOM
16 m 16300
GR16
PROJECT CONSULTANT:
TR. ROOM
55 m 41700
GR10
STORAGE AREA
220 m 85900
R.M.U
GR18
87 m 39400
GR12

84 83 82 81 80 79 78 77 76 75 74 73 72 71 DU. ROOM
UP 17 m 16600
GR17
CU PROJECT TITLE:
W4
85 86 87 88 89 90 91 92 93 94 95 96 97 98 DUBAI DOWNTOWN
1 1 DEVELOPMENT
DISTRICT COOLING PLANT
DN
DCP04
PARKING

DRAWING TITLE:

MECHANICAL PROCESS
A B C D F G H I J K
SERVICE LANE GROUND FLOOR LAYOUT

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMPGR201 1
NOTES:

1. ALL HEADERS AND HIGHPOINTS SHALL BE PROVIDED WITH 75 MM


AUTOMATIC AIR VENT (AAV) WITH 75 MM ISOLATING VALVE.
A B C D E F G H I J K
2. SUPPORTS ARE TO BE DESIGNED BY CONTRACTOR BASED ON ACTUAL
STRESS ANALYSIS RESULTS CONDUCTED BY CONTRACTOR 3RD PARTY.
1
D1508-TD-DWG-MP-00401 3. EQUIPMENT HOOK UP ACCESSORIES ARE NOT ALL SHOWN ON THIS
DRAWING. CONTRACTOR SHOULD REFER TO FLOW DIAGRAMS,
STANDARD DETAILS AND SPECIFICATION AND PROVIDE ACCESSORIES

4. WATER LEVEL IN COOLING TOWER BASIN = 1200 MM

5. HEIGHT OF BASIN COOLING TOWER = 1500 MM

6. THE HANDLING OF COOLING TOWERS MOTORS AND GEARBOX REMOVAL


TO BE PROVIDED BY MANUFACTURER.

7. ALL PIPES ABOVE 10'' (250 MM) SHALL BE SUPPORTED USING STEEL
STRUCTURE SUPPORT, SPECIALLY DESIGNED BY CONTRACTOR TO SUITE
STRESSES AND FORCES. CONTRACTOR TO SUBMIT CALCULATIONS FOR
7 7 APPROVAL PRIOR INSTALLATION. COST OF SUPPORTING SYSTEM TO BE
INCLUDED IN PIPE SUPPORT COST.
UP
8. ALL VALVES ABOVE 250 MM ARE GEAR OPERATED. VALVES INSTALLED
MORE THAN 2000 MM ABOVE FFL SHALL BE PROVIDED WITH CHAIN.
DN
9. PROVIDE DRAIN VALVES AT ALL LOW POINTS WHETHER SHOWN ON
DRAWINGS OR NOT. INCLUDE COST IN PIPING COST.

10. PROVIDE AUTOMATIC AND MANUAL AIR VENTS AT ALL HIGH POINTS
WHETHER SHOWN ON DRAWINGS OR NOT. INCLUDE COST
1000 CWR DN IN PIPING COST.
FROM GROUND FLOOR FM FM FM FM
LCV LCV LCV LCV 11. MONORAIL/CRANES NECESSARY STEEL STRUCTURE REQUIRED TO AVOID
BFV BFV BFV BFV ANY PIPING, DUCTING, CABLE TRAYS,...etc, DEEMED TO BE INCLUDED IN
MONORAIL COST.
1000 1000 1000 1000
CWR CWR CWR CWR
12. ALL REFRIGERANT PIPES ARE SCHEDULE 80. CONNECTIONS TO CHILLERS
SHALL BE THROUGH FLEXIBLE COPPER TUBES.
600 600 600 600 200 REFRIGERANT
VENT PIPE 13. ALL ELBOWS TO PUMPS, CHILLERS, COOLING TOWERS AND FLOW METERS
CWR CWR CWR CWR
FC FC FC FC TO BE PROVIDED WITH GUIDE VANES. OBTAIN FROM REPUTABLE COMPANY
INVOLVED IN THE FIELD.

14. TES TANK DIAMETER AND HEIGHT MAY VARY ACCORDING TO


CT-01 CT-01 CT-01 CT-01 MANUFACTURE'S RECOMMENDATION.
6 A.H.U
6
15. CHECK VALVE TYPE TO BE SELECTED BASED ON A SURGE ANALYSIS
RF02 TO BE CONDUCTED BY 3RD PARTY.
BFV BFV BFV BFV
EQUALIZER LINE EQUALIZER LINE EQUALIZER LINE 16. CONTRACTOR TO PROVIDE PLATFORM AND STAIRS FOR ACCESS TO
FC 650 FC 650 FC 650 FC
FACILITATE MAINTENANCE FOR VALVES INSTALLED ON HIGH LEVEL.

17. CONTRACTOR TO PROVIDE CTI TEST POINTS REQUIRED FOR CTI TESTING.
COOLING TOWER AREA 18. ARRANGEMENT SHOULD BE PROVIDED BY CONTRACTOR FOR COOLING
Not Enclosed TOWER MOTOR AND GEAR BOX HANDLING INCLUDING MOTOR/GEAR
REMOVAL AND CONCRETE CORRIDOR PATH FROM C.T. UP TO EQUIPMENT
RF01 ELEVATOR FOR USE OF TROLLY.

1000
CWR
1
D1508-TD-DWG-MP-00402 1000 1000 1000 1000 1000
CWS CWS CWS CWS CWS

DP AV

FC FC FC FC
MBFV MBFV MBFV MBFV
BFV BFV BFV BFV

5 5
1000
CWR

DP AV

1200 1000 1000 1000 1000 1000


CWS CWS CWS CWS CWS CWS
FC FC FC FC
MBFV MBFV MBFV MBFV
BFV BFV BFV BFV

1000 CWR DN
TO FIRST FLOOR
PUMPS ROOM
RF03 EQUALIZER LINE EQUALIZER LINE EQUALIZER LINE KEY PLAN
650 650 650

DN
BFV BFV BFV BFV
FC FC FC FC

FUTURE

CT-01 CT-01 CT-01

4 FC FC FC
4
LOBBY
RF09
600 600
CWR CWR
FM FM FM
LCV LCV LCV
BFV BFV BFV
1000 1000 1000 1000
CWR CWR CWR CWR

H.E.X ROOM
ELEC. ROOM CT VFD ROOM A.H.U A.H.U
RF06
RF04 RF05 RF07 RF08

3' 3'
3 3

0 FEB. 2017 FOR TENDER H.M.T H.M.I. M.S.O A.A.G.


REV. DATE ISSUED FOR QA COORD. CHECKED APP.
ROOF
1316 m C COPYRIGHT
201 This drawing and design remains the property of Allied
Consultants and may not be copied in any way without
prior written approval from this company

CLIENT:
2 2

PROJECT CONSULTANT:

140139138137136135134133132131130129128127126125

DN
141142143144145146147148149150151152153154155156

PROJECT TITLE:
1 1
DUBAI DOWNTOWN
DEVELOPMENT
DISTRICT COOLING PLANT
DCP04

A B C D E F G H I J K DRAWING TITLE:

MECHANICAL PROCESS
ROOF LAYOUT

DESIGNED BY: DRAWN BY: SIZE:

M.M.M W.I.A A0
CHECKED BY: APPROVED BY: SCALE:

M.S.O A.A.G 1 : 100


DRAWING No. REV. NO

0
D1508TDDWGMPRF201 0

Você também pode gostar