Você está na página 1de 4

Karthikeyan Selvaraj

Senior Electrical Commissioning Engineer

Summary
Graduate Electrical and Electronics Engineer with a total of 20 years experience in Project management,
Commissioning and Start-up of Upstream Onshore/Offshore Gas and Oil Gathering Stations, Shipping/
Booster Stations, Gas injection Plants, Refinery, Gas / Diesel Based Power Plants ( upto 130MW ), HT,EHT
Substations. Presently working for Gasco in its new fractionation train project NGL4 at Ruwais, Abudhabi,
UAE. Specially trained to work safely in Hydrogen sulphide areas, gathering stations, On-Shore and Off-Shore
oil fields, vicinity of high pressure gas compressors etc

Specialties
Broad background in construction, testing and commissioning of Upstream Gas and Oil Gathering Stations,
Shipping/Booster Stations, Gas compression and injection Plants Hands on experience in testing and
commissioning of various types of electrical systems and subsystems viz.,- alternators, motors, transformers,
CTs, PTs, relays, transducers, switchgear, plant and sub assemblies for the oil and gas, chemical and
petrochemical industries

Experience
Senior Commissioning Engineer at ZADCO
May 2015 - Present (3 months)
Manage pre-commissioning and commissioning activities of modular sub-station buildings currently being
built at BOMESC, Tianjin / China and to be followed by final commissioning and start-up at various islands
of ZADCO's UZ750 project.

Senior Electrical Engineer at GASCO


September 2013 - April 2015 (1 year 8 months)
Responsible for Construction, QA/QC, Commissioning of all utility and process electrical systems in
GASCO's Sulphur Handling Terminal II Project at Ruwais,Abudhabi.

E&I Superintendent at GASCO


June 2011 - August 2013 (2 years 3 months)
1. Reviewing drawings, plans, reviewing contract specifications & performing estimations, developing and
interpreting CPM schedules, sequencing electrical construction work activities to minimize interference
between other trades, contractors on the project 2. Providing technical input to support and resolve construct-
ability issues 3. Promoting the security, safety and health of people on the work site 4. Cooperating and
consulting with safety advisors 5. Liaising with site superintendents to ensure jobs are completed to budget,

Page1
schedule and estimates 6. Developing and promoting initiative to improve cost effectiveness 7. Providing and
identifying training needs to employees 8. Coordinating staff on site

Electrical Engineer Harweel Phase II at Petroleum Development Oman ( seconded by Worley Parsons )
2008 - 2011 (3 years)
Site execution - construction / commissioning / QA/QC

E&I Supervisor at Qatar Gas


2007 - 2008 (1 year)
Construction Supervision, Inspection and pre-commissioning work at NPCC Yard and NFB Platform

Languages
Tamil (Native or bilingual proficiency)
English (Full professional proficiency)

Skills & Expertise


Relays
Transducers
Switchgear
Transformer
Motors
Commissioning
Power Plants
Petrochemical
Refinery
Gas
Petroleum
Electricians
Oil/Gas
Instrumentation
Inspection
LNG
Onshore
Completion
DCS
EPC
Upstream
Power Generation
Energy Industry
Construction
FEED
Air Compressors
Refineries

Page2
FPSO
Gas Turbines
P&ID
Project Engineering
Pipelines
HAZOP
Piping
Pumps
Process Control
Oil & Gas Industry
Pre-commissioning
ASME
Offshore Drilling
Offshore Oil & Gas
Boilers
Pressure
Valves
Maintenance Management
Project Control
Factory
PLC
SCADA
Subsea Engineering

Education
Alagappa University
B.E., Electrical and Electronics, 1980 - 1984
Karthikeyan
Bachelor of Engineering, Electrical and Electronics, 1980 - 1984

Page3
Karthikeyan Selvaraj
Senior Electrical Commissioning Engineer

Contact Karthikeyan on LinkedIn

Page4

Você também pode gostar