TIMELINE METHOD
time 0 1 2 3
Investment -21750
Savings 7900 7900 7900
PV -21750 7523.81 7165.533 6824.317
NPV of project -236.340568
FUNCTION METHOD
Investment -21750
PV of future Savings $21,513.66
NPV ($236.34)
TIMELINE METHOD
Time (yrs) 65 66
Moving -50,000
Annual Expense -40,000 -40,000
PV(ay t=65) of annual expenses -40,000 -38461.538462
-565,358
a) Savings required at 65th year:
($565,357.58)
-50,000
$615,357.58
75 76 77 78 79 80 81 82
-40,000 -40,000
-19745.12 -18985.7