SECTION I
INTERPRETATIONS
Volume 36
The Interpretations to the Code will beissued twice a year up to the publication of the 1998
Edition of the Code: each July (designated 7/95, 7/96, and 7/97) and with each Addenda (designated
A95,A96, and A97).The Interpretationsfor each individual Sectionare published separately and
are part of the update service to that Section; Interpretations of Section 111, Divisions 1 and 2, are
part of the update service to Section Ill, Subsection NCA. Interpretations are not part of the Code
or the Addenda.
Interpretations Volumes 30 through 35 were included with the update service to the 1992 Edition
of the Code; Volume 36 is the first Interpretations volume to be included with the update service
to the 1995 Edition.
Copyright Q 1995
THEAMERICAN SOCIETY OF MECHANICALENGINEERS
All Rights Reserved PO 1015
FOREWORD
General Information
This publication includes all written interpretations issued between the indicated dates by the ASME
Staff on behalf of the ASME Boiler and Pressure Vessel Committee in response to inquiries concerning
interpretations of theASMEBoilerandPressureVessel Code. A contents is also includedwhich lists
subjects specific to the interpretations covered in the individual volume. Theseinterpretationsare
not a part of theAddendaortheCode.
The interpretations are takenverbatimfromthe original letters, except for a few typographical and
editorial corrections made for the purpose of improved clarity. Insome instances, a review of the
interpretation revealed a need for corrections of a technical nature. In these cases, a revised interpretation
is presented bearing the original Interpretation Number with the suffix R and the original file number
with an asterisk. Following these revised interpretations, new interpretations and revisions tothem
issued during the indicated dates are assigned Interpretation Numbers inchronological order. Interpretations
applying to more than one Code Section appear withthe interpretations for each affected Section.
ASME procedures provide for reconsideration of these interpretations when or if additional information
is available which the inquirer believes might affect the interpretation. Further, persons aggrieved by
an interpretation mayappeal to the cognizant ASME committee or subcommittee, As stated in the
Statement of Policy in the Code documents, ASME does not approve, certify, rate, or endorse
any item, construction, proprietary device, or activity.
An interpretation applies either to the Edition and Addenda in effect on the date of issuance of the
interpretation or the Edition and Addenda stated in the interpretation. Subsequent revisions to the Code
may supersede the interpretation.
For detailed instructions onpreparation of technical inquiries to the ASME Boiler and Pressure
Vessel Committee, refer to Appendix I.
295
297
Interpretation: 1-95-01
BC93-707 File:
Reply: No.
Interpretation: 1-95-02
File: BC94-446
Reply: Yes.
299
Interpretation: 1-95-03
BC94-448 File:
Question: Do the materials listed inPG-9 for Section I construction have to comply withthe
individual specification requirements after the manufacturer has performed fabrication on the material?
Reply: No.
Interpretation: 1-95-04
File: BC94-454
Question: May a pressure- and temperature-compensated differential pressure drum level transmitter
with a remote readout be considered a remote level indicator?
Reply: Yes.
300
Alignment
tolerance.. . . . . . . . . . . . . . . . , , . . . . . . . . . . . . . . . . . . . . . .. . . .. . . . . . . . . . .. 1-92-36 BC91-558 254
1-92-94 BC93-707 292
1-95-01 BC93-707 299
Allowable Stresses
establishment . , . , , . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . .. . . . . . . . . . . . . . 1-89-30 BC89-216 187
. . , . . . . . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . . . . ..
residual stresses. . , , . .
I
1-83-05 BC79-774 9
ASME Marking
use of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . , . .. . .. . . .. . . . .. .. 1-83-106 BC84-217 88
Assembler
.
by mechanical means.. . . . . . . . . . . . . . . . , , . , , , . , . . . , . . . . . . . . . . . . . . . . . 1-87-57 BC87-064 143
.. .
scope of activity . . . . . . . . . . . . . . . . . , . . . . . . . , , , , . . . . . . . . . . . . . . . . . . . 1-86-29 BC85-155A 116
Attachments
nozzle-to-header.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . ... . ... . 1-92-95 BC94-194 292
Attemperators
jurisdiction.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , , , , , , , . . . . . . . . . . . . . . . . 1-89-28 BC89-024 187
Authorized Inspector
agency of record.. . . . . . . . , . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-86-24 BC86-230 114
.
signing off , , . , , , , . . , . . . . , . . . . . . . . . . . . , . . . . . . . , . . . . . . . . . . . . . . . . .. .
I-77-28R BC75-286' 5
1-83-57 BC82-886 47
Bend Tests
ERW pipe ........................................................ 1-92-68 275
Blowoff/Blowdown
automatic ........................................................ 1-83-14 BC81-708 13
.. ..
rapid drain systems.. . . . . . . . . , . , , , , , . . , . . . . . . . . . . . . . . . , . . . . . . . . . 1-89-36 BC89-316 191
sizing ............................................................ I-83-43R BC83-088' 33
. .
valves.. . . . . . . . . . . . . . . . . . , , , , , , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-83-53 BC83-247 45
1-86-22 BC86-064 112
Boiler Drum
definition. . . . . . . . . . . . . , . , . . , . .. . . .. . . .. . . .. , . .. . . .. . . .. . . .. . . .. . . . 1-86-15 BC85-128 109
1-92-20 BC91-537 243
safety valves , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . , . . . . , . . . . . 1-83-18 BC82-362 14
. .
tube attachments . . . , . . . . , . . . . . . . . . . . . . . . . . . . , , . , . . . . . . . . . . . , . . . . 1-83-20 BC82-351 15
tubeholes ........................................................ 1-89-15 BC88-406 171
Boiler Parts
data reports.. . . . . . . . . . .... . ..
. . . . . .. . . . . . . . . . . , .. . . .. , . . .. . . . . . . .. 1-86-33 BC86-065 123
nameplates . . . . . . . . . . . . . . . . . . , ... . . ..
. . . . .. . . . . . . . . . . . . . . . . . . , . . . . 1-86-32 BC85-614 123
replacement . . ..
. . . . .. . . . . . . . . . . . . . . . . . ... .... . .
. . . . .. . . . . .. . . .. 1-86-73. . BC87-483 154
Boiler Proper
piping ........................................................... 1-92-30 BC92-141 247
Brazing
electric heaters . .. . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . , . . . . . . . . . . . . . . . 1-89-44 BC89-349 194
Bursting Test
tensile strength . . . . . . . . . . . . . . .. . . . . . . . . . . . .. . , . . , , . . . . . . . . . . . . . . . . . 1-92-93 BC93-562 291
Certificates of Authorization
certi~cate......................................................... 1-92-12 BC91-431 234
for materials . . . . . . . . . . . . . . . . . . ..
. . . . . . . . . . . .. . . .. . . .. . . . . . ... . .
.. . 1-92-05 BC91-294 231
..
renewal . . . . . . . . . . . . . . . . . . . . . . . . .. .
. .. . . . . . . . . . . . . . . .. . . .. . . . ... 1-86-16 BC85-185 110
5, M, and E. . . . . . . . . . . . . . . . . . . . . . .. . .
.. . . . . . . .. . , . . . . . . . . . . . . 1-86-70 BC87-403 153
welding.. . , . .... . . .
. . . . . . . . . . , . . .. . . . . , . .. . . .. .
. . . . . . . .. . , . ... .. . 1-92-22 BC91-620 244
Certification Requirements
..
boiler piping . . . . . , . . . . , . . . . . , .. . . . . . . . . . . . . . , . . . . .. . , . . . , . . , . . . . 1-92-39 BC92-256 255
Circular Furnaces
.
materials , . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . , . . . . . . . . . . . . . 1-92-64 BC93-152 265
Common Headers
pressure reducing valves.. . . . . . , , . . . . . .. . . . . . . . . . . . . . . . . . . . , , . . , . . . . . 1-92-90 BC94-019 290
Concavities
weld face. . . . . . . . . . . . , , . . , . . . . . . .. . . . . . . . . . . . . . . . . . , . . , . . . . . . . . . . . 1-92-54 BC91-621 261
Code Responsibility
design calculations . . . . . . . . . . . . . . . . . . .. . . . . . , . . . . . . . . .. . . .. . . . . . . . . . 1-92-48 BC92-294 259
Coil-Type Boilers
exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . 1-83-17 BC82-355 14
1-86-39 BC85-511 131
Compensation
attachment welds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .: . . . . . . 1-86-78 BC86-274 156
calculations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-89-71 BC90-866 221
hillside connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-89-35 BC89-286 190
welding openings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-92-88 BC94-015 289
Corrosion
allowance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , ....... .., , .., , . 1-89-33 BC89-254 189
1-92-20 BC91-537 243
coating........................................................... 1-92-01 BC90-187 229
Design
calculations.. ... . .. ... . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 1-92-48 BC92-294 259
.. ..
compressive stresses in water tubes.. . . . . . . . . . . . . . . . . . .. .
. . ... .. .. . 1-86-51 BC86-314 136
. .
creep range. . . . . . , . , . , , , . . . . . .. .
,. ,, . .. ,, . . .. .. .
,, ,, . . . . .. . . .. .
, 1-83-115 BC84-3 14 93
.. . .
hemispherical heads.. . . . . . . . . . . . . . , ... . .
..
, , . , , .. , . .. . .
. . .. . . . . 1-86-41 BC85-616 132
not covered by Section I . . , . . . , . . . ... ..
. . .. . . . .. . . . . . .. .
.. . . . . .
. . , . , 1-83-112 BC85-064 91
. .
occasional loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-83-02 BC80-346 7
openings.......................................,...,....,...,..,, 1-92-65 BC93-381 266
per Section VIII, Division 1 , . .. . . . . . . . . . . . . . . . . . . . . . . . . . .
,, , , , , , ,, ,, , I-81-02R BC79-381; 6
1-83-07 BC77-762 10
1-83-30 BC82-554A 20
1-83-37 BC79-780 30
1-83-50 BC83-026 44
1-83-71 BC82-058 55
1-83-78 BC83-449 63
. . .
per Section VIII, Division 2 . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . 1-83-114 BC84-195 92
responsibility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-86-13 BC85-501 103
semiellipsoidal heads . . . . . . . .. . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .
.. 1-86-64 BC87-210 146
Drains
forced flow steam generators......................................... 1-83-98 BC83-668 79
requirements ...................................................... 1-92-27 BC92-016 246
Drums
design temperature ................................................. 1-86-87 BC88-064 159
longtitudinalwelds ................................................. 1-89-43 BC89-347 194
Economizers
direct firing....................................................... 1-86-75 BC85-458B 155
draining., ........................................................ 1-92-27 BC92-016 246
location of stamping ................................................ 1-89-42 BC89-346 193
piping for ......................................................... 1-89-13 BC88-154 170
safetyvalves ...................................................... 1-83-86 BC85-577 67
1-92-33 BC92-139 248
Electric Boilers
completion of Data Report Forms ..................................... 1-83-82 BC83-327 65
......................................
design to Section VIII. Division 1 1-83-30 BC82-554A 20
1-83-50 BC83-026 44
1-83-81 BC83-228 65
1-86-30 BC85-547 117
feedwater ........................................................ 1-83-76 BC83-333 62
limitations ........................................................ 1-83-27 BC82-177 18
miniature ......................................................... 1-83-49 BC81-678 43
operating at 15 psi ................................................. 1-86-45 BC86-454 133
stamping .......................................................... 1-83-26 BC80-641 18
Ellipsoidal Heads
compensation ..................................................... 1-92-88 BC94-015 289
Evaporator/Heat Exchanger
classification...................................................... 1-83-87 BC82-732 73
electric ........................................................... 1-83-30 BC82-554A 20
jurisdiction ........................................................ 1-83-74 BC82-553 61
Expansion Joints
uw Of ........................................................... 1-89-70 BC90-513 221
External Pressure
charts............................................................ 1-89-29 BC89-212 187
External Piping
outletS ........................................................... 1-92-07 BC91-422 232
Feedwater
heaters........................................................... 1-83-74 BC82-553 61
1-86-52 BC86-319 137
piping ........................................................... 1-83-76 BC83-333 62
1-86-18 BC85-278 111
1-89-13 BC88-154 170
pumps ........................................................... 1-83-03 BC80-309 8
1-83-54 BC81-349 46
1-83-77 BC83-436 63
1-86-62 BC87-207 146
BC87-256
BC87-257
1-89-66 BC90-428 21 9
pressure .......................................................... 1-89-67 BC90-782 219
Firetube Boilers
attachment of tubes ................................................ 1-86-04 BC85-062 100
cracks in tube beads ................................................ 1-86-08 BC84-568 101
design ........................................................... 1-83-19 BC82-251 15
1-83-41 BC82-656 32
furnaces .......................................................... 1-83-21 BC82-503 15
1-83-67 BC83-343 53
1-89-23 BC88-019 185
tube welds ........................................................ 1-83-51 BC83-148 44
Flanges/Fittings
acceptability ...................................................... 1-92-97 BC94-300 293
design ........................................................... 1-83-07 BC77-762 10
MAWP........................................................... 1-83-24 BC82-266 17
P-T ratings ........................................................ 1-83-24 BC82-266 17
1-83-29 BC82-504 31
1-89-02 BC88-059 165
socket welding in BEP .............................................. 1-86-80 BC87-402 156
special class ....................................................... 1-92-28 BC92-048 246
Furnaces
corrugates ........................................................ 1-86-53 BC86-461 137
gases ............................................................ 1-86-28 BC85-154 116
stayed ........................................................... 1-83-99 BC84-372 79
Fusible Plugs
requirements ...................................................... 1-89-61 BC90-512 211
Gage Glasses
alternatives to ..................................................... 1-92-50 BC92-397 259
1-92-51 BC92-400 260
gagecocks ........................................................ 1-83-40 BC82-558 31
level indicators .................................................... 1-83-13 BC82-179 13
1-86-02 BC84-407 99
1-86-50 BC86-129 136
1-89-53 BC89-266 204
1-89-73 BC91-173 222
1-92-15 BC91-534 236
1-92-63 BC93-132 265
low-water ........................................................ 1-92-25 BC91-624 245
1-92-66 BC93-387 266
magnetic ......................................................... 1-92-69 BC93-382 275
1-92-96 BC94-196 293
materials for water columns .......................................... 1-86-07 BC83-574 101
1-89-56 BC90-414 101
1-89-56 BC90-414 205
on electric boilers .................................................. 1-83-50 BC83-026 44
shutoff valves...................................................... 1-83-103 BC83-647 81
welding requirements ............................................... 1-89-06 BC88-159 167
Heads
flat type .......................................................... 1-86-86 BC88-061 158
welding to shells ................................................... 1-89-46 BC89-354 195
Headers
design temperature ................................................. 1-86-87 BC88-064 159
materials ......................................................... 1-89-41 BC89-344 193
tube attachments .................................................. 1-83-20 BC82-351 15
Hydrostatic Test
after insulation .................................................... 1-86-01 BC83-446 99
1-89-21 BC88-058 178
boiler external piping ............................................... 1-83-64 BC82-810 51
1-92-73 BC93-390 277
completed boiler ................................................... 1-89-51 BC85-613 203
forced circulation boilers ............................................ 1-83-11 BC82-356 12
gages ............................................................ 1-89-58 BC90-416 206
1-92-52 BC92-401 260
1-92-74 BC93-395 278
maximum testpressure .............................................. 1-83-75 BC83-130 62
pneumatic pressurization ............................................ 1-86-42 BC86-066 132
procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-89-19 BC89-025 178
steamgenerators ................................................... 1-89-68 BC90-606 220
temperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-83-92 BC84-097 76
valveleakage ...................................................... 1-92-56 BC92-398 262
Inspection
openings ......................................................... 1-92-57 BC92-442 262
Joint Efficiency
pressureparts ..................................................... 1-83-96 BC83-145 78
Joints
circumferential .................................................... 1-92-35 BC91-549 253
Ligaments
efficiency ......................................................... 1-89-47 BC89-070 201
1-89-48 BC89-348 201
1-89-49 BC90-007 202
1-92-70 BC93-385 276
Loads
occasional ........................................................ 1-86-61 BC87-182 145
Manholes
compensation ..................................................... 1-92-88 BC94-015 289
cover ............................................................ 1-92-24 BC91-623 245
Manufacterer
definition ......................................................... 1-92-22 BC91-620 244
Materials
castings .......................................................... 1-83-71 BC82-058 55
cleanings ......................................................... 1-89-55 BC90-413 205
deletion of ........................................................ 1-83-100 BC84-427 79
dualmarked ...................................................... 1-89-11 BC87-007A 169
ERW Pipe ........................................................ 1-92-64 BC93-152 265
1-92-68 BC93-152(a) 275
1-92-82 BC93-582 282
for furnaces ....................................................... 1-83-21 BC82-503 15
for RT plugs ....................................................... 1-89-10 BC88-229 169
for shells ......................................................... 1-86-56 BC87-053 143
for stays .......................................................... 1-92-53 BC92-402 260
for supports ....................................................... 1-92-67 BC93-437 266
Markings
nonpressureparts .................................................. 1-92-83 BC93-625 282
Miniature Boilers
building., ........................................................ 1-92-43 BC92-300 257
electric ........................................................... 1-83-49 BC81-678 43
thickness ......................................................... 1-86-79 BC87-323 156
valves ............................................................ 1-86-63 BC87-208 146
Multiple Openings
compensation ..................................................... 1-89-69 BC91-058 220
ligaments ......................................................... 1-92-13 BC91-531 235
Nameplates
boiler parts ....................................................... 1-86-32 BC85-614 123
economics ........................................................ 1-86-75 BC85-4588 155
information contained on ............................................ 1-86-67 BC86-276 152
Nondestructive Examination
.personnelqualification .............................................. 1-83-29 BC82-438 19
BC82-505
1-83-44 BC82-754A 34
1-86-06 BC83-535A 100
1-86-74 BC84-216A 154
personnel requalification ............................................ 1-86-48 BC84-216 135
prior to PWHT .................................................... 1-89-14 BC88-393 171
welds in tubesheets ................................................. 1-86-77 BC86-243 155
Nonpressure Parts
welds ............................................................ 1-83-52 BC82-769 45
1-89-22 BC88-232 179
Nozzles
welded to drums................................................... 1-92-85 BC93-708 283
Openings
definitepattern .................................................... 1-92-14 BC91-532 235
Operator
working area ...................................................... 1-89-12 BC87-215 170
Piping
boiler proper ...................................................... 1-92-46 BC92-257 258
definition ......................................................... 1-83-47 BC79-501 41
examination ...................................................... 1-83-29 BC82-438 19
BC82-505
joined by mechanical means ......................................... 1-86-38 BC85-006 130
materials ......................................................... 1-89-04 BC88-151 166
miscellaneous ..................................................... 1-86-16 BC82-233 14
rapiddrain system ................................................. 1-89-36 BC89-316 191
safetyvalves ...................................................... 1-83-62 BC83-258 50
subassemblies ..................................................... 1-83-113 BC84-168 92
thickness equation ................................................. 1-86-25 BC81-713 114
BC83-289
BC83-669
BC84-230
Pressure Parts
pressure containing ................................................. 1-92-40 BC92-258 255
Pressure Vessels
fired ............................................................. I-81-02R BC79-381* 6
minimum thread engagement ........................................ 1-92-89 BC94-016 289
Proof Testing
flanges. .......................................................... 1-86-27 BC85-072 115
Radiography
acceptancestandards ............................................... 1-83-28 BC82-343 19
BC82-418 19
1-83-34 BC82-712 28
1-83-35 BC82-859 28
1-83-36 BC82-868 29
1-83-59 BC83-118 48
1-83-73 BC83-299 61
1-83-79 BC83-525 64
1-92-60 BC93-045 264
electric boilers. .................................................... 1-86-26 BC84-647 115
ERWpipe ........................................................ 1-92-68 BC93-152(a) 275
exemptions ....................................................... 1-86-28 BC85-154 116
1-89-17 BC89-021 177
1-89-39 BC89-105 192
1-92-60 BC93-045 264
1-92-76 BC93-530 2 79
in lieu of ......................................................... 1-92-26 BC92-015 245
of ERWpipeandtube .............................................. 1-86-40 BC85-611 131
BC86-128
penetrameter selection. ............................................. 1-83-15 BC81-685A 13
PIUg~ ............................................................ 1-89-10 BC88-229 169
retention of radiographs. ............................................ 1-86-47 BC86-502 134
Reinforcement
calculations ....................................................... 1-92-29 BC92-017A 247
1-92-37 BC92-017A 254
1-92-45 BC92-017A 257
Riveted Boilers
lapseamed ....................................................... 1-86-59 BC87-142 144
Rupture Disks
use of ........................................................... 1-92-02 BC90-511 229
Safety Valves
adjustments ....................................................... 1-83-97 BC83-391 78
1-89-01 BC87-181 165
assembly ......................................................... 1-86-29 BC85-155A 116
blowdown range ................................................... 1-83-109 BC84-025 90
boiler drum. ...................................................... 1-83-18 BC82-362 14
capacity .......................................................... 1-86-15 BC85-128 109
1-86-23 BC85-489 113
1-89-18 BC89-023 177
1-89-45 BC89-350 194
1-89-52 BC89-020 203
coating........................................................... 1-92-81 BC93-559 281
Seamless
pipes ............................................................ 1-92-47 BC92-293 258
Section I Jurisdiction
completion ....................................................... 1-92-92 BC94-199 291
engine cooling systems .............................................. 1-89-40 BC89-110 193
exemptions ....................................................... 1-83-58 8'33-061 47
1-83-74 BC82-553 61
1-83-85 BC83-576 66
1-83-87 BC82-732 73
furnace skid rails ................................................... 1-83-107 BC84-229 89
high-temperaturewater boilers ....................................... 1-83-80 BC83-216 64
nonintegral superheater/economizer ................................... 1-83-55 BC82-371 46
organicvaporgenerators ............................................ I-81-02R BC79-381* 6
solar boiler ....................................................... 1-86-65 BC84-023A 151
subatmospheric chiller/heaters........................................ 1-86-05 BC85-186 100
1-86-81 BC87-472 157
turbine stop valves ................................................. 1-83-65 BC83-062 52
Shell
boiler shell ........................................................ 1-92-47 BC92-293 258
Stamping
boiler proper ...................................................... 1-92-46 BC92-257 258
Code stamping of pressure piping ..................................... 1-92-04 BC91-284 230
duplicate parts .................................................... 1-83-101 BC83-229 80
electric boilers ..................................................... 1-89-16 BC89-019 177
location .......................................................... 1-89-42 BC89-346 193
masterstamping ................................................... 1-92-92 BC94-199 291
parts manufactured and used by one Manufacturer ....................... 1-86-49 BC86-126 135
piping subassemblies................................................ 1-83-113 BC84-168 92
safetyvalves ...................................................... 1-92-38 BC92-324 254
stamping plates .................................................... 1-86-67 BC86-276 152
1-89-20 BC87-213 178
Staybolts
screwed .......................................................... 1-86-14 BC84-639 109
Stays
area of ........................................................... 1-89-05 BC88-152 167
materials for ...................................................... 1-92-53 BC92-402 260
welding of ........................................................ 1-89-24 BC88-020 185
Superheaters
attachments ....................................................... 1-83-60 BC83-153 49
drains............................................................ 1-83-70 BC83-583 54
1-92-27 BC92-016 246
electric........................................................... 1-83-81 BC83-228 65
1-86-30 BC85-547 117
safetyvalves ...................................................... 1-83-04 BC80-412 8
1-83-18 BC82-362 14
1-83-69 BC83-348 54
1-86-15 BC85-128 109
supports
materials for ...................................................... 1-92-67 BC93-437 266
Temperature
design ........................................................... 1-86-57 BC88-064 159
differentials ....................................................... 1-86-54 BC87-098 137
mean wall ........................................................ 1-86-37 BC86-383 130
thermostat ........................................................ 1-92-25 BC91-624 245
Temporary Attachments
removal .......................................................... 1-83-12 BC81-428 12
formed heads ..................................................... 1-86-19 BC85-282 111
forradiography .................................................... 1-83-35 BC82-859 28
miniature boilers ................................................... 1-86-79 BC87-323 156
nominal wall ...................................................... 1-86-09 BC84-638 102
semiellipsoidal heads ............................................... 1-86-64 BC87-2 10 146
thickness equation ................................................. 1-86-25 BC81-713 114
BC83-289
BC83-669
BC84-230
1-89-09 BC88-228 169
tube ............................................................. 1-83-23 BC81-553 16
1-83-60 BC83-153 49
1-83-95 BC82-847 77
tubesheets ........................................................ 1-86-60 BC87-180 144
1-86-83 BC88-016 157
Thread Engagement
minimum ......................................................... 1-92-89 BC94-016 289
Tolerances
alignment ........................................................ 1-92-36 BC91-558 254
Tubes
bends............................................................ 1-83-23 BC81-553 16
connections to tubesheets ........................................... 1-86-82 BC88-040 157
1-89-08 BC88-227 168
definition ......................................................... 1-83-47 BC79-501 41
design ........................................................... 1-83-115 BC84-314 93
extension ......................................................... 1-86-17 BC84-021 110
fins .............................................................. 1-83-41 BC82-656 32
1-92-21 BC91-541 243
for lowest permissable water level ..................................... 1-86-43 BC86-127 132
holes. diameter .................................................... 1-89-47 BC89-070 201
1-89-48 BC89-348 201
Ultrasonic Testing
acceptance criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-86-10 BC85-234 103
examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-92-26 BC92-015 245
Valves
blowoff .......................................................... 1-86-22 BC86-064 112
certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-86-21 BC85-462A 112
design basis ....................................................... 1-83-91 BC80-685 75
gage cocks ........................................................ 1-83-40 BC82-558 31
isolating valves .................................................... 1-89-66 BC90-428 219
isolation .......................................................... 1-86-12 BC85-462 103
leakage .......................................................... 1-92-56 BC92-398 262
location .......................................................... 1-86-63 BC87-208 146
P-Tratings ........................................................ 1-83-24 BC82-266 17
stop ............................................................. 1-83-76 BC83-333 62
turbine ........................................................... 1-83-65 BC83-062 52
Water Legs
definition ......................................................... 1-92-08 BC90-867 232
Welding
bend tests ........................................................ 1-86-53 BC86-461 137
butt welds in tubesheets............................................. 1-86-77 BC86-243 155
circumferential .................................................... 1-92-23 BC91-622 244
1-92-41 BC92-260 256
completepenetration ............................................... 1-92-75 BC93-528 278
BC93-529
concavity ......................................................... 1-83-86 BC82-868 29
1-83-59 BC83-118 48
connections ....................................................... 1-92-16 BC91-535 236
1-92-71 BC93-386 276
1-95-02 BC94-446 299
control of welders .................................................. 1-86-66 BC85-094A 152
defects ........................................................... 1-92-10 BC91-286 233
equipment........................................................ 1-83-45 BC80-038A 34
1-83-52 BC82-769 45
examinationrequirements ........................................... 1-89-60 690-347 211
fullpenetration .................................................... I-83-08R BC77.783 * 61
1-83-79 BC83-525 64
heads to shells ..................................................... 1-89-46 BC89-354 195
identification of welders ............................................. 1-86-71 BC87-404 153
in electric boilers .................................................. 1-83-38 BC82-493 31
longitudinal ....................................................... 1-89-43 BC89-347 194
low-alloy steels .................................................... 1-92-41 BC92-260 256
Working Pressure
maximum allowable ................................................ 1-89-68 BC90-606 220
Cumulative Index . .
Interpretations Vols 12-36