Você está na página 1de 3
242016 Completions Mede Questions - CM3- Rig Selecton Questions tabmeaabeszossastiszr2e098smb53805 183dae25c42ef02Neat3284812072017Seb 10M Tbob0aBs7Sas%4d310c405e44a005ed65223%da) #8 Wiki Home © Recent Changes Pages and Files & Members ‘Search ~All Pages: Completions Module Question Papers Rev 4 CCM - Introduction to Well Engineering Questions (M2 - HSE Questions. CM - Rig Selection Questions (CMA - Logistics Questions CMS - Geology for Completions Engineers Questions (CMB - Completion Equipment and Components Questions M7 - Welheads and Trees Questions (CMB - Hydraulics Questions M9 - Procurement and Inspection Questions M10 - Tubing Size Questions M11 - Pore Pressure and Fracture Pressure « CMB - Rig Selection Questions (/CM3+- +Rig+Selection+Questions) 2 Edt | OOM Rig#Selection*Questionsitdiscussion) © 5 (IpageihistoryiCM3+-+Rig# Selection*Questions) (ipage/menu/CM3+-+Rig+Selection+Questions) CMS - Rig Selection Revi Objective: ‘The Engineer should understand the process of rig selection; to be able to pose the right questions and perform all the relevant analysis and calculations required to ensure that a rig chosen would be capable of performing the tasks required of it Reference Material The questions provide a framework to guide the Engineer through the process (of selecting the ig and performing all the relevant tasks and analysis. ‘A useful guide to mobile dling rigs is: Marine Driling Rig Directory 2006, Gulf Publishing, available as a CD-Rom: ito viwiw.qulfoub,com/defaut.atp?page=148productID=49068VS The Engineer should also be aware that data published in this form might be cout of date and inaccurate. Before committing to any contract, the Engineer hp sleompletionsmodulequestonsiwell wikispaces ne¥CM3+-+Rig+Selecion+ Questions 18 242016 Questions (M2 - Cost Estimating and AFE Questions CMI - Fishing and Miting Questions (CM4 - Toraue and Drag Questions (CMS - Dil Sting Design Questions M16 - Wel Integrity Questions M17 - Tubing Stress Analysis Questions (CM18 - MCF Well Control Questions M9 - Detailed Completion Design Questions Completions Mede Questions - CM3- Rig Selecton Questions ‘must always obtain confirmation of the Rig capabilities from its owner and also, where practical, from independent sources. ‘Quostions: 1. What are the fundamental parameters that control the choice of which offshore mobile rig to use? 2 Why were dil ships used in the North Sea in the 1970s, but nat today? {3 What are the economical water depth operating ranges of the following Dring Vessel Types? fa. Jack Up », Semi-Sub Rig «. Dil Ship 4, You wish to work-over a well in the middle ofthe Narth Sea, where the water depth is approximately 300 fl You have to choose between a jack-up and a semi-submersible i, both of which are available and whose owners ‘assure you that they are capable of working in that water depth, Explain the process you would go through to determine which rig to choose. 5, You have a semi-submersibe rig that is going to be working 173.8 NM from the nearest supply base. You will be working over a series of four holes in the ‘same field. You will need two brine weights and dor't have the capacity forall of the brine, TD of these wells range from 12000 ft. to 16000 ft. You are hoping to operate with two supply boats, to keep contract overheads down, How would you manage your brine in order to minimise the amount of shipping to_and from shore? 6. How does the choice of dill pipe size and range affect rig choice? 7. Why do we normally see bolted derricks on offshore rigs? Explain the advantages and disadvantages of bolted dericks, compared to allwelded £8, How do derricks difer from masts? 9. Your rg has a top drive system. Why do you sill need a rotary table? 10. Specity a land rig forthe following vertical well to be worked aver in North Atica hp sleompletorsmodulequestonsiwell wikispaces ne¥CM3+-+Rig+Selecion+ Questions 242016 Completions Mede Questions - CM3- Rig Selecton Questions Derick racking is required "Mud pump requirements — numbedsize/pawer Fluid storage waterwastelmud Rotary table or top drive, which do you recommend? Solids removal equipment needed OPS (assume a § kpsi stack is required, list all the items required for this system) Engines required (Le. total power) ‘TD of well is 8900 ft, ~ Production, Casing — production casing is at 9 5/8 “There is @ 7" liner from 8400Mt to TD. Water based mud 10.5 ppg was used to dil the reservot. 11. Establish the following by talking to a rg contractor or shipping company. 12 The cost and timeframe to move a land rig 25 miles to a new location. b. The cost and timeframe to move a jack-up ig from the southem north sea UK Sector to West Africa Ivory Coast ic. Establish the cost and timeframe for moving @ floating rig frorn the ‘manufacturers yard in Singapore to offshore South Africa ~ Pot Elizabeth 12, Other than price and technical capabilty, what other criteria could you and Would you use to select a ailing contractor? 13, When selecting a rig for use in deep water what technicalafety regulations must the ig comply with if it's a Dynamically Positioned Self. powered floating Dring Unit operating in national waters but passing through Intemational waters hp sleompletiorsmodulequestonsiwell wikispaces ne¥CM3+-+Rig+Selecon+- Questions ® Add Discussion

Você também pode gostar