Você está na página 1de 8

VOLUME 6 ISSUE 4 DECEMBER 2016

MARVEL
EXPRESSWAY
AFCONS zipped through the Agra-Lucknow Expressway
project, finishing it a year ahead of schedule
Making Headlines

From VC & MD`s Desk


AFCONS Infrastructure Limited has
been named one of the winners of
the Asian Most Admired Knowledge

Proud of
Enterprise (MAKE) Award Winner
2016. The company was recognised
for transforming enterprise knowl-
edge into shareholder / stakeholder

our efforts
value. This is the first MAKE Award
for AFCONS.

AFCONS' Jammu-Udhampur Highway


Project was awarded the Construction
Times Award for the Best Executed
Highway Project of the Year. The Agra-Lucknow Expressway Project was inaugurated on
The award was received by last November, and I am immensely pleased that, once again,
Mr R. Anantakumar, Executive
we have delivered a challenging project ahead of schedule. A
Vice President, on December 12,
2016, in Gurgaon. greenfield project, the Expressway is one-of-a-kind in terms
of magnitude and impact. Once the whole stretch is
operational, it will boost the agrarian economy and small
industries in the remote villages in Uttar Pradesh, providing
direct access to bigger markets.
We crossed several milestones in our journey to deliver
the 36-month project, comprising Packages II & IV, in 24
months. The Expressway project saw several engineering
innovations, and one of the remarkable ones has been the use
of an indigenously designed and built launcher.
One of the biggest challenges was building the Ganga Bridge.
The perennial river had to be diverted to make way for the
bridge. Due to the unusually heavy monsoon this year, plans
had to be altered in order to meet the deadline. Our efforts
OFFICE ADDRESS bore fruits and the superstructure of the bridge was made
AFCONS House,
16, Shah Industrial Estate, ready in 18 months.
Veera Desai Road, Azadnagar, We should take pride in being part of projects of national
Andheri (W), Mumbai - 400 053, interest such as the Agra-Lucknow Expressway and strive
Maharashtra, India.
to make bigger contributions to our country's progress in
Tel No: +91-22-67191000
Fax: +91-22-2673 0047/ 2673 0026 times to come.
Website: www.afcons.com I congratulate the entire team of Agra-Lucknow Expressway
CIN No: U45200MH1976PLC019335 for achieving this outstanding feat and making us proud.

EDITORIAL
S Paramasivan, Bhakti Prasad,
Krishnakumari C, Chandrika Sen K Subrahmanian

2 | VOLUME NO. 06 | ISSUE 4 | December 2016 WWW.AFCONS.COM


Cover Story

AFCONS executed 126 kms of the Relentless efforts led to AFCONS finishing AFCONS raised the superstructure
302-km-long Agra-Lucknow Expressway the project in 33 per cent less time of Ganga Bridge in 18 months

ROAD TO
PROGRESS
AFCONS-executed Agra-Lucknow Expressway connects the heartland
of Uttar Pradesh with key business centres in northern India

F
ighter jets landing on an Expressway is a feat in Authoritys (UPEIDA) ambitious greenfield project.
itself. On November 21, 2016, the whole nation One of the most anticipated infrastructure projects
watched as eight of those touched down and in recent times, Agra-Lucknow Expressway will
whizzed past the newly-constructed cut down travel time between Agra and Lucknow
Agra-Lucknow Expressway. This feat marked the from six hours to three-and-a-half hours.
opening ceremony of Indias longest
access-controlled expressway, one of AFCONS Ahead of schedule
many landmark projects. Maintaining the impeccable track record of
Executing 126 kms of the 302-km six-lane ex- finishing projects ahead of schedule, AFCONS
pressway, AFCONS worked in EPC capacity on completed this project ahead of time. The project's
two packages, viz. Firozabad to Etawah (Package scheduled completion period as per the contract
II) and Kannauj to Unnao (Package IV), making was three years. However, keeping in view the
up almost 42 per cent of the total length of Uttar aspirations of client, project was ready more than
Pradesh Expressways Industrial Development a year before time. The biggest challenges while

58
Pedestrian
underpasses
built by
AFCONS

3 | VOLUME NO. 06 | ISSUE 4 | December 2016 WWW.AFCONS.COM


Cover Story

executing the project were large-scale mobilisation of and Minor Bridges had to be built along stretches of
resources and their effective management. virgin land to complete the stretch of the Expressway.
One of the biggest challenges was completing large
bridges across major rivers, such as Ganges, in a span One of a kind
of 18 months, including two monsoons. Reduction in Agra-Lucknow Expressway is a glowing example of the
scheduled completion date of the project meant the use of cutting-edge technology. The project saw several
project activities were left with little float or sometimes innovations in terms of technology and planning on its
even no float at all. Therefore the construction of road to completion. PERI formwork, tailor-made to suit
bridges continued even as heavy rains lashed the area the requirements of typical structures, was imple-
and the rivers got flooded. Highly-motivated team mented in this project, which helped expedite the work.
worked day and night to achieve the completion of In order to expedite construction of Box Structures, Box
Major structures well within the advanced completion Culverts were constructed using Precast Technology.

4
period of 24 months. In addition, slabs of all large Box Structures up to 12m
Also, after the work span were executed using Precast panels. Remarkable
began, there was a progress was also the result of proactive approach, with
considerable change quick turnaround time for design approvals, etc. and
in plans. The struc- highly-effective supply chain management.
Rail over
tures were originally
bridges
planned for six lanes, The Ganga Bridge
built by
but the configuration of The 750m-long, 8-lane Bridge on Ganges involved
AFCONS
structures was changed construction of 32 Well Foundations, equal number of
to eight lanes. Despite substructure in form of Pier / Abutment and
the changes being implemented, hardly any time was superstructure in Precast Box Segments. Four hundred
lost. The main carriageway along the entire contracted and fifty Precast Box Segments, each weighing about
length was ready in record time, and so was the 70-90MT, were cast in a fully Automated Precast Yard
structural work at all the major and minor bridges. setup along the Project Alignment.
Another challenge of the project was the sheer number In order to compress completion schedule of this
of structures it comprises. Rail Over Bridges, Flyovers, Major Bridge to 18 months, AFCONS used two different
3
Vehicular Underpasses, Pedestrian types of superstructure and three different methods of
Underpasses, Major superstructure erection on the same bridge. Thus out
of 30 spans, 25 spans were constructed with Precast
Concrete Box Segments and five spans in structural
steel with composite Deck Slabs.
As far as erection

4 | VOLUME NO. 06 | ISSUE 4 | December 2016 WWW.AFCONS.COM


Cover Story

8 29 23 6
Flyovers
built by
Minor bridges
built by
Vehicular
underpasses
built by
Major
bridges
built by
AFCONS AFCONS
AFCONS AFCONS

commute time between several cities in the region.


With the development of 'vishishth mandi sthal'
(specialised market places) and other agro-processing
centres in the vicinity of the expressway, agriculture,
horticulture and dairy industries will also receive
is concerned, 15 spans were launched with Launching a boost.
Girder, 10 spans with Ground Support System and five On the national scale, the expressway will also help
spans of Structural Steel with high-capacity cranes. attract investments into the region by assuring
This is the case of high level technical improvisations to unhindered transport of business goods. By reducing the
achieve extremely compressed target of 18 months for travel time between cities, the expressway also
completing such a large bridge on Ganges perhaps a contributes to reduction of carbon footprint and pollution.
first of its kind. A project of this magnitude changes the face of areas
The 2400MT capacity Launching Girder was indigenously surrounding it in more ways than one. Apart from
designed to handle 1450MT weight of Precast Box changing the landscape, it also opens up several avenues
Segments of each span of 50m. It is to the credit of team for development and progress. AFCONS has made
spirit at the site that they could achieve cycle time of just maximum utilisation of local labour to stimulate eco-
3.1 days for launching one span of 50m on this Bridge. nomic growth around the expressway by providing gainful
employment to locals. The companys development
Eye on development efforts have been praised by the local population and
Besides strengthening connectively of Lucknow, the the response in terms of co-operation with the highway
capital of Uttar Pradesh, with National Capital, another execution team has been positive.
tangible benefit of Expressway will be the transformation Agra-Lucknow Expressway ushers in a new era not
of regionally important cities such as Mainpuri, Etawah just for the region, but for the country. The success of a
and Unnao among many others into robust industrial project of this magnitude gives the confidence and hope
centres to bolster economic growth in the State. The Ex- to the infrastructure sector as a whole to take a step
pressway will also help decongest some of the important beyond the obvious, and make a mark in the progress of
National Highways such as NH-2, NH-91 and decrease the country.

BIG REWARD
Agra-Lucknow Ex-
pressway, Package
II won the Gold
Award in Oc-
cupational Health
and Safety in 15th
Annual Greentech
Safety Award 2016.

5 | VOLUME NO. 06 | ISSUE 4 | December 2016 WWW.AFCONS.COM


News & Awards

NEW PROJECTS News


AFCONS has been
engaged by Nagpur Metro NOTE-WORTHY MOVE
Rail Corporation Ltd to
design and construct AFCONS came forward to support the
viaducts in Reach-3 between employees after the Central Governments
Jhansi Rani Square and move on November 8, 2016, to withdraw
Lokmanya Nagar stations on from circulation all old notes of Rs500 and
the East-West Corridor of the Rs1,000. As part of this initiative, the finance
Nagpur Metro Project. department, with support from the salary
department, arranged with ICICI Bank to
The Government of India help exchange old notes with new ones at
has awarded AFCONS the the HO on November 17 and 18, 2016. The
task of replacing the employees were asked to fill up a declaration
superstructure of the form and present a valid identity proof. Each
existing 5.575-km-long person was allowed to exchange as per RBI
four-lane MG Setu over guidelines. Around 250 employees of HO and
Ganga River in Patna. The finance department organised this initiative with
Oil & Gas BU benefitted from this move. support from the salary department

AFCONS has been awarded


shore protection works for Afconian shines at students and highlighted carbonadsorption batch
reclamation boundary of HR summit the strengths and mile- studies - in the category en-
GSEZ Mineral Port at Mr Ashish Chaurasia stones of the company as vironmental best practice.
Libreville, Gabon, by GSEZ (Senior Manager - HR) was well as the SP Group.
Mineral Port S.A. invited for HR Summit 2016 HSE award for
at JK Lakshmipat Univer- International award Amit Ninawe
sity, Jaipur, to represent for U. Senthilnathan Mr. Amit Ninawe (senior
NEW JOINEES AFCONS on October 21, Dr. U Senthilnathan (Senior engineer HSE CSB
2016. Attended by eminent Engineer HSE, Oil & Gas Nagpur) has received
Mr Arunkumar U HR leaders and students BU) received the Interna- Bravery Award (Bronze)
Mishra:Mr Arun Kumar the theme for the panel tional Green Apple Award 2016, at OSH India Con-
U Mishra has joined as Vice discussion was Bench- 2016 at the House of ference held in Vashi on
President Projects with marking for Industry Commons, Palace of November 10, 2016. The
effect from November 4, Expectation and strategies Westminster in London, on aim of the award is to
2016. He has the experi- for Aligning Competen- November 11, 2016. He won recognise individuals, who
ence of over 34 years and cies of Emerging Human the award for his research have acted bravely and ad-
has worked with Maker Capital with Make In India. project - Removal of lead hered to safely standards
Developers Ltd, Cemin- Mr Ashish Chaurasia from aqueous solution us- to protect, help, save their
dia Co Ltd, Birla GTM Ltd, presented AFCONS as an ing hybrid eucalyptus wood co-workers and organisa-
Skanska Cementation Ltd, employer of choice among based activated tions at times of crises.
Nagarjuna Construction
Ltd, Hindustan Construc-
tion Ltd and AFCONS
HR Corner
Infrastructure Ltd. His last Management ers Development Program programme was conducted
assignment was with Gam- Development Program (Batch-I) was organised at by Mr. Bhupinder Singh and
mon India Ltd as Project Junior Management the HO in August with the Mr. Niloy Mukhopadhyay
Director. Development Program: aim of aiding our CPE-Mech and attended by nominated
The first phase of Junior engineers and managers employees of all the CMRL
Mr Sunil S Management Development with tools, techniques and sites (4383 / 4384 / 4393). The
Basarkar: Mr Sunil S Program (JMDP) for the skills to improve productivity objective of the training was
Basarkar has joined as eighth batch (2016-17) was of various equipment against to ensure understanding on
General Manager with held at the HO in Septem- the specified norms and electrical installation and
effect from October 4, ber. The programme is a also enable them to lead and commissioning of differ-
2016. He has an experience blend of technical and soft develop a high performance ent types of equipment and
of over 29 years and has skills modules designed to delivery team catering to the plants at the sites.
worked with companies enhance the technical and stakeholders effectively. General Management
like B.G. Shirke & Compa- behavioural competencies of Electrical Training Training
ny, Consulting Engineering the participants. Electrical Equipment Instal- Advance MS Excel: A train-
Services India Pvt. Ltd. His Mechanical Trainings lation and Commissioning: ing programme on Advanced
last assignment was with CPE Engineers & Manag- A training programme on MS Excel was conducted
ITD Cementation India Pvt. ers Development Program: installation and commission- by Ms. Varsha Naramdeo
Ltd. as General Manager. CPE Engineers & Manag- ing of electrical equipment (external faculty) at the
was organised at CMRL. The Head Office in August. The

6 | VOLUME NO. 06
05 | ISSUE 4
2 | December
April 2015 2016 WWW.AFCONS.COM
Life@AFCONS

Festive Spirit

Mr K Subrahmanian and Mr S Paramasivan perform aarti during the Utsav 2016, the cultural event during Navratri at the HO, received an
Dussehra pooja at AFCONS HO overwhelming response

Ramleela celebrations at the Agra-Lucknow Expressway project site Colours Day celebrations at AFCONS HO

programme was attended by which will include on-the-job Soft Skills Trainings signed for employees who have
the employees from the Head and classroom trainings. During Business Writing Skills: A been promoted to the manage-
Office and Oil & Gas BU. It was their first month at AFCONS HO, two-day workshop on Business rial rank. It aimed at sensitising
aimed at sharpening the MS the trainees have undergone one Writing Skills was conducted the participants on the expecta-
Excel skills of the participants week of HR Induction program by Mr. Vincent DSilva (external tions and challenges faced by
by providing deep insights on and three weeks of functional faculty) at AFCONS HO and first-time managers.
various tools of Excel including classroom training. attended by around 20 employ- Whole Wellness
conditional formatting, data Functional Training: Induction ees from various departments Financial Awareness: A
validation and VLOOKUP, Mail programmes for trainees in and BUs. The objective of the session on financial aware-
Merge among others. functions CPE-Mech, CPE- workshop was to enhance the ness was organised for the
Trainees Induction Elec, HSE and store & procure- participants writing skills and employees of the Head Office
CLIMB UP: A GTE develop- ment were organised at the help put together simple and on Sep 9, 2016. A total of 21
ment programme, CLIMB UP, Butibori workshop (CPE) and at persuasive documents. employees of the HO attended
was launched on July 11, 2016 AFCONS HO (HSE and store & First-time Managers Training the session, where team of
at the Head Office. Thirty six procurement) in July and August. Program (Batch-I): The first experts from ICICI Securities
graduate trainees from the The programmes aimed at pro- batch of First-time Managers Ltd. sensitised the partici-
civil engineering discipline were viding the trainees with detailed Training Program was held by pants on how investing sen-
part of this programme. The understanding of the company, Mr. Sachin Karve at the Head sibly can help secure a better
trainees selected will undergo an its policies and basic functioning Office on October 24 and 25,th future and informed about
extensive training of 45 weeks, of the departments. 2016. The programme was de- various investment options.

7 | VOLUME NO. 06
05 | ISSUE 4
2 | December
April 2015 2016 WWW.AFCONS.COM
And the GNOSIS Best Project Award
goes to Chenab Bridge!
The Chenab Bridge Project has won the year and runs for 12 months.
GNOSIS Best Project Trophy for 2015-16. The Chenab Bridge Project contributed
The trophy was handed over to the Project lessons learned, innovations and process
Manager, Mr SM Viswamurthy, by VCMD videos consistently. The users also
K Subhrahmanian, during the quarterly contributed through Something to Share Project Manager Mr SM Viswamurthy receives
the award from VCMD K Subhrahmanian
review meeting (QRM) held in October 2016. from time to time. Inspite of the harsh
The GNOSIS Best Project Trophy terrain and vagaries of the weather, the The top three
is awarded to projects based on their Chenab team did not waver in their efforts
Site Points
contribution to GNOSIS Knowledge to contribute their learnings, making them
2612-Chenab Site 4,350
Management (KM) platform and participation the obvious choice for the award this year.
of users in knowledge sharing activities. The They were ably supported by their KM 4545-Lucknow Agra Road
3,700
Project, Pack-IV
contest commences on Engineers Day every Ambassador, Mr Surajit Chaudhary.
2274-Jamnagar Site 3,425

A cable crane, one of the worlds largest, has been


installed to build the Chenab Rail Bridge. The bridge,
once ready, will be the worlds highest arch railway
bridge standing 359m (1,178ft) above the riverbed.
It will be 1,315m long, with an arch span of 469m

A L E R T S
Afcons now has a dedicated
Youtube channel. Scan the code
to visit the channel and stay tuned
with the latest videos

Disclaimer: Afcons Insight is for private circulation only. The views and opinions expressed or implied herein are of the contributors and may not necessarily reflect those of Afcons Infrastructure. Content from this publication
should not be reproduced, in part or in whole, without the consent of the editorial team.

8 | VOLUME NO. 05 | ISSUE 2 | April 2015 WWW.AFCONS.COM

Você também pode gostar