Escolar Documentos
Profissional Documentos
Cultura Documentos
A B C CH:21138.000m D E F
of EJ of EJ
Guard beam
refer separate drawing
1
TOP/BOTTOM PLAN
1A
(+) 256.765
BOTTOM SHUTTER
3
(+) 257.215
150
SIDE SHUTTER
(+) 256.765
4A
5
Guard beam
refer separate drawing
of EJ of EJ
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN PREPARED AND CHECKED IN ACCORDANCE WITH THE LKT ENGINEERING CONSULTANTS LTD QUALITY ASSURANCE SYSTEM
PROJECT NAME: CONSULTANT : STRUCTURAL CONSULTANT : DWG. NAME: SCALE REVISION NO. DATE ARCHITECTS SIGNATURE STRUCTURAL ENGG. SIGNATURE
RAPID METRO SOUTH EXTENSION LINK TEMPORARY ARRANGEMENT
PHASE-2, SIKANDERPUR TO SECTOR 55-56
AIT CHOWK STATION
10 / 49, Subhash Nagar, OF BEAMS AT CONCOURSE LEVEL AT(+257.215M
New Delhi-110027 AS SHOWN R0 25-01-2015
Phone :+011-45565818
CLIENT: A-20, Sector-2, Noida-201301, Uttar Pradesh, INDIA Tel/Fax:+011-25126129
DEALT BY DESIGNED BY CHECK DISCIPLINE APPROVED DRAWING NO.
RAPID METRO RAIL GURGAON LTD. info@lktengineering.com
Tel : +91 120 254 3582 Fax : +91 120 254 3562 http//:-www.lktengineering.com S.D.
AVADH B.D. LK.T. LKT/AIT/ST-02
5 4A 4 3 2 1A 1
150
(+)253.900m TOC
Intermediate level
(+)253.900m TOC
Intermediate level
(+) 248.665m
Plinth level +248.200m
+248.000m +248.100m
(+) 247.700m TOC Ground level +247.900m
Road level Ground level
Road level
Tie beam level
SECTION 1-1
4 3 2 A B C
+247.900m
Road level
RCC pilecap
Bored cast-in-situ
SECTION 3-3 RCC pile
SECTION 2-2
THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN PREPARED AND CHECKED IN ACCORDANCE WITH THE LKT ENGINEERING CONSULTANTS LTD QUALITY ASSURANCE SYSTEM
PROJECT NAME: CONSULTANT : STRUCTURAL CONSULTANT : DWG. NAME: SCALE REVISION NO. DATE ARCHITECTS SIGNATURE STRUCTURAL ENGG. SIGNATURE
RAPID METRO SOUTH EXTENSION LINK TEMPORARY ARRANGEMENT
PHASE-2, SIKANDERPUR TO SECTOR 55-56
AIT CHOWK STATION
10 / 49, Subhash Nagar, OF BEAMS AT CONCOURSE LEVEL AT(+257.215M
New Delhi-110027 AS SHOWN R0 25-01-2015
Phone :+011-45565818
CLIENT: A-20, Sector-2, Noida-201301, Uttar Pradesh, INDIA Tel/Fax:+011-25126129
DEALT BY DESIGNED BY CHECK DISCIPLINE APPROVED DRAWING NO.
RAPID METRO RAIL GURGAON LTD. info@lktengineering.com
Tel : +91 120 254 3582 Fax : +91 120 254 3562 http//:-www.lktengineering.com S.D.
AVADH B. D. LK.T. LKT/AIT/ST-01
AIT CHOWK STATION
TO SIKANDERPUR A B C CH:21138.000m D E F
Length of station = 75000
1A 4050
(+) 256.765
20000
NOTE-1
1. CUT PIECE OF NB-40MM
PIPE CAN BE USED.
13550
NOTE-2
1. THIS STAGING/ SHUTTERING DRAWING TO BE
READ IN CONJUCTION WITH GFC CONCOURSE
LEVEL GENERAL ARRANGEMENT PLAN.
175
(A) THE BOTTOM HORIZONTAL BRACINGS WILL BS WITHIN
600 mm FROM CRIBS BOTTOM
(B) THE TOP HORIZONTAL BRACINGS WILL BE WITHIN
600 mm FROM CRIBS TOP
(C) THE DIAGONAL BRACING WILL BE AT THE SLOP BETWEEN
30' TO 60' TO THE HORIZONTAL
20000
NOTES : -
1. ALL DIMENSIONS ARE IN mm, UNLESS OTHERWISE SPECIFIED.
2. ANY KIND OF LOOSE FITTINGS SHOULD BE AVOIDED.
(+) 256.765
3. CUPLOCKS SHOULD BE ERRECT PERFECTLY VERTICAL.
4. ALL STRUCTURAL STEEL SHALL CONFROM TO GRADE FE 250
5. ALL BOLTS, NUTS AND WASHERS SHALL CONFIRM TO IS : 1363 - 2002, IS : 1367 - 2002, IS : 5369 & IS : 5374
6. ALL WELDS SHALL BE 6 mm CONTINUOUS FILLET UNLESS SPECIFIED
4A
7. WELDED SURFACE SHALL BE GROUND FOR PROPER CONTACT WITH OTHER MEMBERS/UNITS.
4050