nd below)
erval to 2700 psi ( hold for 5 min to see if there is any pressure drop)and hold it there for 15 min (never go ab
monitor and see if any change in pressure is observed.
n gradually upto 3500 psi while observe the pressure jurk/drop indication
erve for hydrotrip shearing, after shearing, bleed-off and stop the cementing unit pump.
ly up to 500 using the drilling pump for injection test at 2 bpm rate and see for any return in the C-section
or 15 min (never go above 3000 psi)
00 psi ( hold for 5 min to see if there is any pressure drop)and hold it there for 15 min (never go above 3000 psi)
d see if any change in pressure is observed.
5 min, if it holds,
drotrip shearing, after shearing, bleed-off and stop the cementing unit pump.
0 using the drilling pump for injection test at 2 bpm rate and see for any return in the C-section
never go above 3000 psi)