Você está na página 1de 4

POSIBLES SECTO

CONCRETO

SECTOR OPCION II
S1 1.17
S2 1.17 * METRADO TOTAL
COLUMNAS
S3 1.17 * PROMEDIO DE SECTORES
S4 0.94
S1 3.48
VIGA-LOSA S2 3.48
S3 3.51
S1 3.11
ZAPATA S2 3.11
S3 3.03

TOTAL T- A (m) #REF!


TOTAL T- B (m)
TOTAL T- C (m)
TOTAL T- D (m) #REF!
OSIBLES SECTORIZACION

ENCOFRADO

SECTOR
CONCRETO EMCOFRADO S1
ETRADO TOTAL 133.06 1274.45 S2
ROMEDIO DE SECTORES 33.27 318.61 COLUMNAS S3
S4
S5
S1
S2
VIGAS S3
S4
S5
S1
LOSAS S2
S3

TOTAL T- A (m)
TOTAL T- B (m)
TOTAL T- C (m)
TOTAL T- D (m)
OFRADO

OPCION II
12.48
12.48
12.48
12.48
9.36
17.10
16.97
16.83
17.1
16.92
22.86
26.78
23.27

52.44
56.23
52.58
29.58
OLUMNAS

4
8.5
a de obra 1 2 3 4 5 6 7 8 9 10 11 12
hh 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00
hhacum 34.00 68.00 102.00 136.00 170.00 204.00 238.00 272.00 306.00 340.00 374.00 408.00
met 12.48 12.48 12.48 12.48 9.36 12.48 12.48 12.48 12.48 9.36 12.48 12.48
met acum 12.48 24.96 37.44 49.92 59.28 71.76 84.24 96.72 109.20 118.56 131.04 143.52
Ren diario 2.72 2.72 2.72 2.72 3.63 2.72 2.72 2.72 2.72 3.63 2.72 2.72
en. Acum. 2.72 2.72 2.72 2.72 2.87 2.84 2.83 2.81 2.80 2.87 2.85 2.84
Rend. Pres 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70 2.70

DE VIGAS

6
8.5
a de obra 1 2 3 4 5 6 7 8 9 10 11 12
hh 51.00 51.00 51.00 51.00 51.00 51.00 51.00 51.00 51.00 51.00 51.00
hhacum - 51.00 102.00 153.00 204.00 255.00 306.00 357.00 408.00 459.00 510.00 561.00
met 17.10 16.97 16.83 17.10 16.92 17.10 16.97 16.83 17.10 16.92 17.10
met acum - 17.10 34.07 50.90 68.00 84.92 102.02 118.99 135.82 152.92 169.84 186.94
Ren diario - 2.98 3.01 3.03 2.98 3.01 2.98 3.01 3.03 2.98 3.01 2.98
en. Acum. - 2.98 2.99 3.01 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Rend. Pres 2.95 2.95 2.95 2.95 2.95 2.95 2.95 2.95 2.95 2.95 2.95