Você está na página 1de 16

TIAA CREF, 555 12th Street, Oakland, CA 94612

TIAA CREF
555 12th Street, Oakland, CA 94612

1
TIAA CREF, 555 12th Street, Oakland, CA 94612

Table Of Contents

1. Project Specifications 3

2. Statistics 4

3. Hauling Method 6

4. Materials Usage 7

5. Facilities & Tickets 11

6. Messages & History 16

2
TIAA CREF, 555 12th Street, Oakland, CA 94612

Project Name TIAA CREF


Address 555 12th Street, Suite 1280, Oakland, CA 94612 Plan Status: Created
Name Shannon Fong
Submitted
Phone 925-283-4550-125
Permit/APN # B1601421 - 04/05/16 Approved

Tract Number Tickets Uploaded (3)


Start Date 04/11/16
Submitted for Final
End Date 06/28/16
Construction Type Tenant Improvement Completed
Building Type Commercial
Project Value $408,450
Square Ft. 5,621
Description TI to office suite 1280, includes two ADA restroom upgrades
Tracking # GH550-420-5403
Property ID

Name Position Email Phone Cell

1. Trevor Davis Project Engineer tdavis@peacockconstruction.com 925-283-4550-120 925-788-2377

2. Jesse DeValle Project Manager jessedevalle@peacockconstruction.com 925-283-4550-123 925-451-8960

3. Shannon Fong Office Manager sfong@peacockconstruction.com 925-283-4550-125

3
TIAA CREF, 555 12th Street, Oakland, CA 94612

Project Performance

Estimated Project Diversion Rate Current Project Diversion Rate

68.8% 95.02%
Your Estimated Diversion Actual Recycling Totals
Reused, Recycled, and Disposed Reused, Recycled, and Disposed
Disposed % : 4.98

Disposed % : 31.2

Sal/Rec % : 68.8

Sal/Rec % : 95.02

Estimated Tons % of project Actual Tons % of project

Recycled 5.88 68.8 Recycled 0.26 tons 95.02

Reused 0.00 0 Reused 0.00 tons 0.00

Disposed 2.67 31.2 Disposed 0.01 tons 4.98

Diversion Requirements

Diversion Rate Required by City Diversion Rate Required for Project/Company

65.00%
City Required Diversion
Reused, Recycled, and Disposed

Disposed % : 35

Sal/Rec % : 65

The City Diversion Requirements is 65.00%


which means that your project must
Reuse and or Recycle at least 65.00%
of all construction debris from your project.
to meet the City's recycling requirements.

Inerts Diverted

Inerts Diversion Rate Non-Inerts Diversion Rate

Non-Inerts Diversion Rate


Reused, Recycled, and Disposed
Disposed % : 4.98

Sal/Rec % : 95.02

Project Waste Averages

Typical project range for Commercial/Tenant Improvement is 2 to 6 lbs per sq. ft. Median is 4.7 lbs per sq.

4
TIAA CREF, 555 12th Street, Oakland, CA 94612
Estimated Actual

Low Low

Median Median

High High

Your Project Your Project

0 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7

Your Project High Median Low Your Project High Median Low

5
TIAA CREF, 555 12th Street, Oakland, CA 94612

Self Haul Guidelines


The following parties may haul materials without obtaining a non-exclusive franchise from the City: Reuse Facilities collecting salvaged materials donated by the property owner
or contractor; The property owner or full-time employee of the owner using the owners equipment to transport materials; A construction contractor performing construction work
at the service address, whose collection and transport of the C&D debris is incidental to the service being performed, provided that such contractor uses a fixed-body vehicle for
the collection and transportation of the C&D debris, and such contractor collects and transports the materials at no additional or separate fee using contractors employees and
contractors equipment. Incidental to the service being performed shall mean that the material requiring collection and transportation is generated by the activity of the contractor
performing the hauling; Parties who haul C&D debris in violation of the terms of Ordinance #13315 may be subject to City enforcement actions as detailed in the Ordinance.

6
TIAA CREF, 555 12th Street, Oakland, CA 94612

Materials Usage

Metal : 0.27

Estimated Actual
Displayed In Tons
Disposed : 0 Reused : 0

Recycled : 0.12

reused % of project recycled % of project disposed % of project

Estimated 0.00 0% 0.12 100% 0.00 0%

Actual 0.00 0% 0.00 0% 0.00 0%

Facility Address Phone

Premier Recycle (map) 260 Leo Avenue, San Jose, CA 95112 408-297-7910

7
TIAA CREF, 555 12th Street, Oakland, CA 94612

Estimated Actual
Displayed In Tons Displayed In tons
Disposed : 0 Reused : 0 Disposed : 0.01 Reused : 0

Recycled : 1.43 Recycled : 0.26

reused % of project recycled % of project disposed % of project

Estimated 0.00 0% 1.43 100% 0.00 0%

Actual 0.00 0% 0.26 96% 0.01 5%

Facility Address Phone

Pleasant Paper Recycling, Inc. (map) 1313 Galaxy Way, Concord, CA 94520 925-689-3900

8
TIAA CREF, 555 12th Street, Oakland, CA 94612

Estimated Actual
Displayed In Tons
Disposed : 0 Reused : 0

Recycled : 7

reused % of project recycled % of project disposed % of project

Estimated 0.00 0% 7.00 100% 0.00 0%

Actual 0.00 0% 0.00 0% 0.00 0%

Facility Address Phone

Premier Recycle (map) 260 Leo Avenue, San Jose, CA 95112 408-297-7910

Premier Recycle Company (map) 260 Leo Ave., San Jose, CA 95112

9
TIAA CREF, 555 12th Street, Oakland, CA 94612

Material Facilities selected for this material

1. Ceiling Tiles Premier Recycle (0.12 tons recycled)

2. Metal Pleasant Paper Recycling, Inc. (1.43 tons recycled)

3. Mixed C & D Premier Recycle, Premier Recycle Company (7.00 tons recycled)

Material Facilities actually used

1. Metal Pleasant Paper Recycling, Inc.

10
TIAA CREF, 555 12th Street, Oakland, CA 94612

Facilities Usage
Separated by Facility/Reuse Option

Pleasant Paper Recycling Inc : 0.27

11
TIAA CREF, 555 12th Street, Oakland, CA 94612
FACILITIES AND TICKETS

Material Submitted By Ticket Weight Diversion % Recycled Applied % Date View

1. Metal Shannon Fong 59568 0.00 95 0.00 100 04/19/16 View

12
TIAA CREF, 555 12th Street, Oakland, CA 94612
2. Material Submitted By Ticket Weight Diversion % Recycled Applied % Date View

Metal Shannon Fong 59639 0.00 95 0.00 100 04/22/16 View

13
TIAA CREF, 555 12th Street, Oakland, CA 94612
3. Material Submitted By Ticket Weight Diversion % Recycled Applied % Date View

Metal Shannon Fong 59696 0.27 95 0.26 100 04/26/16 View

14
TIAA CREF, 555 12th Street, Oakland, CA 94612
FACILITIES AND MATERIALS

Facility Materials to be taken to this facility

1. Pleasant Paper Recycling, Inc. Metal

2. Premier Recycle Ceiling Tiles, Mixed C & D

3. Premier Recycle Company Mixed C & D

Facility Materials taken to this facility

1. Pleasant Paper Recycling, Inc. Metal

15
TIAA CREF, 555 12th Street, Oakland, CA 94612

1. From: Oakland 04/07/16

Thanks for your plan. Please revise and segregate the materials to bring the recycling rate above the 65% minimum, currently @ 50%. Drywall is an
easy target. In addition, if there are doors or other fixtures to be reused or stockpiled f ...

2. From: Shannon Fong 04/07/16

I don't know for sure yet as this is just a preliminary. Once I get the reports/recycle tags from our subcontractor, I will update it to reflect the items
being recycled. It's hard to say a head of time what they are recycling until I get ...

3. From: Shannon Fong 04/12/16

Patrick, Any word on my email that I sent on 4/7/16? We just received an email stated that our plans were approved however, it's on hold due to the
Construction Recycling Dept. The plans will be processed for issuance of the permit but ...

4. From: Shannon Fong 04/14/16

Good Afternoon, Patrick! Any word on this? Thank you. Shannon Fong

5. From: Shannon Fong 04/18/16

Patrick, We paid to get the permit expedited and would be very disappointed if we do not get it because the waste management hasn't been
approved yet. Can you please review this morning so that we can hopefully move forward? Thank yo ...

6. From: Shannon Fong 07/25/16

Good Morning, Patrick. We are trying to call for our final inspection however, we cannot move forward until we get your blessing on this. Can you
please review? Thank you for your time. Shannon Fong

7. From: Shannon Fong 07/30/16

Any word on this? We need to call for our final inspection. Thank you. Shannon Fong

At this time, there are no notes for this project.

Plan Status: Completed

Permit Number: B1601421


B1601421 - 04/05/16
Date Start: 04/11/16

Date Submitted for Approval: 04/12/16 18:07:24

Created and/or Submitted by: Shannon Fong , Contractor

Date Approved: 04/20/16 01:01:17


Approved by: Patrick Hayes , Recycling Specialist

Date Submitted for Final: 06/29/16 16:51:43

Submitted by: Shannon Fong , Office Manager

Date of Final Approval: 07/30/16 04:38:44


Approved by: Ferial Mosley , C&D Associate

Note

Contractor has read and agreed to the City's Terms and Conditions on 04/05/16 Read More
1.

2. Rejected by phayes@oaklandnet.com on 04/07/16


Contractor has read and agreed to the City's Terms and Conditions on 04/12/16 Read More
3.

4. Patrick, I have updated TIAA. Can you please review? Thank you. by sfong@peacockconstruction.com on 04/12/16
ACCELA Workflow - Verified by fmosley@oaklandnet.com on 07/30/16
5.

6. Special Inspection Hold & General Hold - Verified by fmosley@oaklandnet.com on 07/30/16

16

Você também pode gostar