Você está na página 1de 2

VOLUME III BOOK 1/4

TECHNICAL SPECIFICATIONS

CONTENTS

Section 1 General Requirements

Section 1-1 Scope of Work..........................................................................................1-1/1


Section 1-2 Applicable Standards................................................................................1-2/1
Section 1-3 Project Management................................................................................1-3/1
Section 1-4 Submittals and Substitutions....................................................................1-4/1
Section 1-5 Project Meetings.......................................................................................1-5/1
Section 1-6 Construction Schedule..............................................................................1-6/1
Section 1-7 Mobilisation and Demobilisation...............................................................1-7/1
Section 1-8 Temporary Facilities and Controls............................................................1-8/1
Section 1-9 Construction Surveys...............................................................................1-9/1
Section 1-10 Quality Assurance and Testing Laboratory.............................................1-10/1
Section 1-11 Project Records......................................................................................1-11/1
Section 1-12 Environmental Protection.......................................................................1-12/1
Section 1-13 Occupational Safety, Health and Environment.......................................1-13/1

Section 2 Earthworks

Section 2-1 Earthworks Definitions and Classifications ..............................................2-1/1


Section 2-2 Clearing and Grubbing ............................................................................2-2/1
Section 2-3 Excavation ............................................................................................... 2-3/1
Section 2-4 Structure Excavation and Backfill ...........................................................2-4/1
Section 2-5 Embankment ........................................................................................... 2-5/1
Section 2-6 Subballast and Subbase ..........................................................................2-6/1
Section 2-7 Topsoil and Grassing ...............................................................................2-7/1

Section 3 Road and Station Access

Section 3-1 Aggregate Base Course............................................................................3-1/1


Section 3-2 Shoulders for Roads ................................................................................3-2/1
Section 3-3 Scarification & Reconstruction of Existing Pavement .............................3-3/1

CONTENTS (Cont)
The Construction of Track Doubling Project : Technical Specifications Contents
(Section : Den Chai Chiang Mai)
i
Section 3-4 Prime Coat and Tack Coat........................................................................3-4/1
Section 3-5 Asphalt Concrete Pavement ....................................................................3-5/1
Section 3-6 Asphalt Surface Treatment ......................................................................3-6/1
Section 3-7 Portland Cement Concrete Pavement......................................................3-7/1
Section 3-8 Concrete Kerb and Gutter .......................................................................3-8/1
Section 3-9 Slope Protection.......................................................................................3-9/1
Section 3-10 Miscellaneous Structures .......................................................................3-10/1
Section 3-11 Concrete Sidewalk .................................................................................3-11/1
Section 3-12 Grassing ................................................................................................ 3-12/1
Section 3-13 Top Soil .................................................................................................. 3-13/1
Section 3-14 Guard Rails ............................................................................................ 3-14/1
Section 3-15 Fencing .................................................................................................. 3-15/1
Section 3-16 Markers and Guide Posts ......................................................................3-16/1
Section 3-17 Road Signs ............................................................................................ 3-17/1
Section 3-18 Road Lighting ........................................................................................ 3-18/1
Section 3-19 Road Markings ......................................................................................3-19/1

Section 4 Railway Structures

Section 4-1 Concrete for Structures............................................................................4-1/1


Section 4-2 Reinforcement .........................................................................................4-2/1
Section 4-3 Precast Concrete......................................................................................4-3/1
Section 4-4 Prestressing Reinforcement.....................................................................4-4/1
Section 4-5 Driven Piles..............................................................................................4-5/1
Section 4-6 Bored Piles...............................................................................................4-6/1
Section 4-7 Pile Load Tests.........................................................................................4-7/1
Section 4-8 Precast Segmental Viaduct......................................................................4-8/1
Section 4-9 Bridges Constructed in Balanced Cantilevering.......................................4-9/1
Section 4-10 Structural Steel Work.............................................................................4-10/1
Section 4-11 Joints, Bearing and Sundries..................................................................4-11/1
Section 4-12 Epoxy Bonding Agent.............................................................................4-12/1
Section 4-13 Parapets and Railings.............................................................................4-13/1
Section 4-14 Revetments............................................................................................ 4-14/1
Section 4-15 Demolition and Removal of Existing Structures.....................................4-15/1
Section 4-16 Repairing The Existing Structures..........................................................4-16/1

The Construction of Track Doubling Project : Technical Specifications Contents


(Section : Den Chai Chiang Mai)
ii

Você também pode gostar