PT AGROLESTARI MANDIRI

Repair of Loading Ramp Hopper


at Pekawai 40 80 TPH Palm Oil Mill

TECHNICAL SPECIFICATIONS FOR CIVIL WORKS


CODE NO LR LOADING RAMP HOPPER FOUNDATION DATE May 17
PROJECT SERVICE LOCATION LOADING RAMP STATION REVISION 0
PREPARED BY EPDV DRAWING NO PKWM-MOD.40-80-13-C-LR SHEET NO 1 of 1

1. GENERAL

Dimension, shape, construction detail, quality of material, and construction methods must
refer to Civil Drawings and General Specifications for Civil Works.

Scope of work includes:


- New Loading Ramp Hopper foundation
- Repair existing Loading Ramp Hopper Foundation
- Demolished of existing concrete ground beam for foundation works

2. NEW LOADING RAMP HOPPER FOUNDATION

- Foundations are made of reinforced concrete of K225 quality which reinforcement


details refers to drawings.
- Soil beneath the foundations must be compacted by hand compactor until it reaches 95%
of maximum density, covered with 50 mm thick lean concrete of 1:3:5 mixture.
- In case for new loading ramp hopper foundation works, the existing ground beam must
be demolished, and then re-concrete with new K225 concrete quality with existing
rebar. Boundary of demolition area refers to drawings.
- Connection between new and existing concrete must applied bonding agent. The
bonding agent to be applied is a SIKA product i.e. SIKABond NV. The bonding agent
application must refer to the manufacturers application standard.
- Grouting is a product of SIKA i.e SIKAGrout 214-11 type. Detailed application
requirements must refer to General Specification of Concrete Work.

3. REPAIR EXISTING LOADING RAMP HOPPER FOUNDATION

- Existing foundation must be demolished and then re-concrete whit new K225 concrete
quality with existing rebar. Boundary of demolition area refers to drawings.
- Connection between new and existing concrete must applied bonding agent. The
bonding agent to be applied is a SIKA product i.e. SIKABond NV. The bonding agent
application must refer to the manufacturers application standard.
- Before pouring new concrete, the existing concrete surface must be cleaned from all
loose concrete debris, dirt, oil and dust.
- Grouting is a product of SIKA i.e SIKAGrout 214-11 type. Detailed application
requirements must refer to General Specification of Concrete Work.