Você está na página 1de 77

Broadway/Lawrence Streetscape

Design Charrette March 7, 2014


Agenda

Introductions
Goals for Charrette
Project Overview
Project Scoping
Alternative Development
Streetscape Concepts

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Overview

Phase 1:
North of Leland Avenue
2015 construction

Phase 2:
South of Leland Avenue
2016 construction*

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Project Objectives

Streetscape improvements
New pedestrian plaza at Broadway/Racine intersection
Pedestrian-friendly street on Clifton between Lawrence Avenue
and Broadway
Broadway between Gunnison St and Wilson Ave
Lawrence Ave between Broadway and Winthrop Ave

Desired Outcome
Spur economic development, increase safety, and support mode
shift in Uptown community

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Context

Existing Neighborhood
Within 0.5 mile of project
corridor: 28,000 residents,
6,900 jobs
Within 1 mile: 70,000 residents,
22,000 jobs
Regional entertainment
destinations
Aragon 4,500 capacity
Riviera Theatre 2,500 capacity

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Context

Historic Area
Uptown Square
Sheridan Park
Uptown Theatre
Uptown Broadway Bldg
Trust & Savings Bank
Study area is
commercial,
entertainment,
transportation core
Schools, parks, homes
adjacent to study area
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Context

Corridor Zoning
Shopping
Mixed-Use
Commercial
Surrounded by
residential

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Pedestrians

Pedestrian Street overlay


Designated for Chicagos
best examples of
pedestrian-oriented
shopping streets
Opportunities to enhance
pedestrian travel paths
Existing sidewalk widths
(each side)
Broadway: 15-22 ft
Lawrence: 6-12 ft

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Transit

Bus Routes
Rt 81 - Lawrence
24 hrs/day every day
Peak: 7-9 minutes
Off-peak: 20-30 minutes

Rt 36 - Broadway
Approx 4:00 am - 1:00 am every day
Peak: 9 minutes
Off-peak: 20 minutes

Rt 78 Montrose (Wilson/Broadway)
Approx 5:00 am - 11:00 pm every day
Peak: 8-10 minutes
Off-peak: 20-30 minutes

Lawrence L Station
4,500 avg weekday entries
Wilson L Station
7,000 avg weekday entries
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Transit Wilson Station Reconstruction

Looking
northwest at
Wilson &
Broadway

Before and
After

Source: CTA

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Transit Wilson Station Reconstruction

Fewer CTA
columns in
Broadway
Improve sight
lines, safety,
and street
experience for
automobiles,
bikes,
pedestrians

Source: CTA

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Bicycle Facilities

0.5 mile to regional


Lakefront Trail
Streets for Cycling 2020
Plan
Crosstown routes
Lawrence & Broadway
Neighborhood routes
Winthrop & Leland

Source: Streets for Cycling 2020

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Automobiles

Street Functional ADT Lanes


Class
Broadway Minor Arterial 21,600 4 (2 future)
Lawrence Minor Arterial 15,700 2
Wilson Major Collector 9,200 2
Racine Local n/a 2
Clifton Local n/a 1

Street Form/Function

Broadway Thoroughfare

Lawrence Connector
Wilson Connector

Racine Neighborhood
Street (NS)

Clifton Neighborhood
Street (NS) or
Service Way
(SW)

No truck routes or SRAs

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Crash Analysis

Quantity Injury Type


1 Fatality
11 A - incapacitating
41 B - non-incapacitating
49 C injury reported, not evident
379 Property damage

All fatal and severe injury


crashes were on Broadway
Broadway/Lawrence
intersection
25% of study area crashes
Fatality location

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Crashes Ped/Bike

35 Pedestrian (1 fatal)
24 Cyclist
Pedestrian and cyclist
crashes more likely to
result in injuries than
automobile-only crashes
64% of A injuries
56% of B injuries

Select Locations Pedestrian Cyclist Crashes


Crashes
Broadway/Lawrence 8 10
Broadway/Wilson 10 3
Broadway CTA 7 4
Underpass

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Complete Streets and Hierarchy

Building Typology
Center/Corridor (C)
Roadway Form and Function
Thoroughfare: Broadway
Connector: Lawrence Ave, Wilson Ave
Neighborhood Street: Racine Ave, Clifton Ave (or Service Way)
Mode Hierarchy
P-T-B-A (default)

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Complete Streets

Thoroughfare: Broadway
City Connector: Lawrence Ave, Wilson Ave
Neighborhood Street/Lane: Racine Ave, Clifton Ave (or Service Way/Alley)

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Alternatives

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Alternatives

Racine Ave Cul-de-Sac


Pros
Eliminates potential
turning conflicts
Larger pedestrian plaza
Cons
Fire truck movement
Narrow pedestrian path
between Racine Cul-de-
Sac & Broadway (7 ft)

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Alternatives

Racine Ave Two-


Way T-intersection
Pros
Pedestrian plaza
Fire truck access
Cons
Potential turning
conflicts
Sight lines limit
landscaping

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Alternatives

Racine Ave One-Way


Northbound T-
intersection
Pros
Eliminates some conflicts
Better sight lines allow
landscaping
Pedestrian plaza
Cons
Changes two-way street
to one way (however, it
will match Racine Ave
South)
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Alternatives

Clifton Ave One-


Way Northbound
Pros
Maintain existing
access/route
New ADA sidewalks
and crossings
Cons
Potential vehicle bypass
Potential conflicts with
bikes and pedestrians

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Alternatives

Clifton Ave Dead-


End
Pros
Pedestrian plaza
Reduction of conflicts
Cons
Elimination of a vehicle
path
Bank loading area
access constrained

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Sustainable Urban Infrastructure Guidelines (SUIG)

Streetscape Requirements evaluated per the Sustainable


Urban Infrastructure Guidelines:
Water
Energy
Economics
Materials and Waste
Climate and Air Quality
Beauty and Community
Urban Ecology
Commissioning

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Streetscape Concepts
Existing Conditions: Bridges Divide Broadway

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Existing Conditions South of Bridge

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Existing Conditions: North of Bridge

West Side: Trees in grates and cobra head lights East Side: Vaulted Sidewalks

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Existing Conditions: Riviera and Bank

West: Trees only on Racine. No Trees north of Pancake House


East: Pots and Vaulted Sidewalks

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Existing Conditions: Lawrence and Broadway

No Trees, Vaulted Sidewalks, Pots and Cobra Heads


Note outdoor dine on Broadway

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Existing Conditions: Lawrence and Broadway

Vaulted Sidewalks on Lawrence west of Broadway


Trees in grates N. Side of Lawrence east of Broadway
Vaulted Sidewalk at Bank east of Broadway

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Future Treatments

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Future Treatments: CDOT Family of Elements

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Potential New Linked Public Spaces on Broadway

Very different in character, scale and


urban impact,

one activated by adjacent uses,


the other needs use generated

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Potential New Linked Public Spaces on Broadway

Both could be part of a


secondary pedestrian system

Both could be part of a secondary pedestrian system


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Axis Termination on Broadway

Draw Interest to the South

Both could be part of a secondary pedestrian system


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Axis Termination on Broadway

Potential Plaza Directly on Axis & Connected to Riviera

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Axis Termination on Broadway

Provides a terminus, draws eye south and helps create and outdoor room

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Potential Plaza Connected to Riviera and Restaurant

Outdoor Dine, Stage and Entertainment, Festivals, Connection to Boarders


Building and across Broadway to Bank Plaza? Note Windy City Rib Fest held here
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Potential Plaza 5,000 Sq. Ft. approx.

69 feet

Potential Plaza of 5,000 sq. ft.


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Concept: Music, Dine, part of a series of festival sites

Potential Plaza of 5,000 sq. ft.


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Concept: Music, Dine, part of a series of festival sites

Leading the New American Culture

Hollywood on Lake Michigan

Jazz Age

Melting Pot/Stew

Potential Plaza of 5,000 sq. ft.


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Example: Milwaukee and Division 5,000 SQ. FT

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Example: Rush and State 6,000 SQ. FT

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Example: (Kempf) Giddings Plaza 6,000 sq. ft. approx.

Fountain Stage

Outdoor dine

Giddings Plaza: Larger and rectangle approx. 125 ft. x 49 ft. or 6,000 sq. ft.
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Example: Giddings Plaza 6,000 sq. ft.

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Example: Giddings Plaza 6,000 sq. ft.

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Stages

OTHER DESIGNS DIFFERENT SCALES

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Stages

Planter and raised platform available from Rough and Ready

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Idea: Integrate an Art Component

Music Columns, engraved with tunes from famous local artists can be read and
played outside the Riviera. Could be repeated through secondary pedestrian system
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Idea: Integrate an Art Component

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Idea: Plaza, temp seating, stage, music columns

stage

There could be many configurations


Chicago Department of Transportation
Broadway/Lawrence Streetscape
Potential Plaza Issues: Vaulted Side Walk

Chicago Department of Transportation


Broadway/Lawrence Streetscape
CDOT Planters and Family of Elements

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Planters

Use above ground planters with no seating component

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Planters

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Public Art

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Public Art: Potential Wall Treatments

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Public Art: Potential Wall Treatments

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Clifton creates a gap in the urban wall

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Join open spaces unite urban wall

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Gateway

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Gateway

MORE TRADITIONAL

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Clifton Potential Plaza and Flex Street

95 FT.

Approx. 11,000 sq. ft. without sidewalk, more than double the size of Riviera Plaza
Chicago Department of Transportation
Broadway/Lawrence Streetscape
Giddings Overlaid on Plaza

GIDDINGS 6,000 sq. ft.

REF: ICE RINK AT MILLENIUM IS 13,000 SQ. FT.

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Plazas

Very little seating, only grass to maintain


However not flexible

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Plaza

Flexible with stage

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Idea : Temporary Dine

Malaga: Role out artificial turf, drop down concession pod and open for business

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Temporary Dine

San Franciscos PROXY project brought small businesses,


like Ritual Coffee, together on a series of city-owned vacant lots.

Chicago Department of Transportation


Broadway/Lawrence Streetscape
People Spots

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Clifton Flex Street

Chicago Department of Transportation


Broadway/Lawrence Streetscape
FLEX

Chicago Department of Transportation


Broadway/Lawrence Streetscape
FLEX

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Markets and Festivals

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Markets and Festivals

NEW NIGHTIME FARMERS MARKET AT ARGYLE BY BROADWAY

Chicago Department of Transportation


Broadway/Lawrence Streetscape
General : Elements and Features

Kiosks as Focal Points

Storefront Art for Vacant Buildings

Chicago Department of Transportation


Broadway/Lawrence Streetscape
Recap

Streetscape improvements
New pedestrian plaza at Broadway/Racine intersection
Pedestrian-friendly street on Clifton between Lawrence Ave
and Broadway
Broadway between Gunnison St and Wilson Ave
Lawrence between Broadway and Winthrop Ave

Desired Outcome
Spur economic development, increase safety, and support mode
shift in Uptown community

Chicago Department of Transportation


Broadway/Lawrence Streetscape

Você também pode gostar