Published Under The Authority of Director General CPWD
All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced in
any form or by any means, electronic or mechanical including photocopy, recording or any information storage and re
This Analysis of Rates 2014 for Delhi is prepared for the use of CPWD. However, this may be used by other Govt. de
A GOVERNMENT OF INDIA PUBLICATION
Published by
Director General
Central Public Works Department Nirman Bhawan
New Delhi-110011
Price : Rs. 3000/-
Per Set of 2 Volumes
Excluding, Postage, Packing and Delivery Charges etc.
Printed and Marketed by
M/s Kshitiz Enterprises D-57 South Extension Part-1 New Delhi-110049
Phone : 011-41648857,
Mobile : 9811032311, 9311332311
Email: sales@kshitiz.com
kshitizenterprisesdel@gmail.com
Also available at
All leading Govt. Book Dealers in India
ii
V.K. GUPTA
Director General
Hkkjr ljdkj
Government of India
FOREWORD
56/1317, Fax : 23061884
Email: cpwd_dgw@nic.in
Two 13 Finishing
14 Repairs to Buildings
15 Dismantling and Demolishing
Two
16 Road Work
17 Sanitary Installations
18 Water Supply
19 Drainage
20 Pile work
21 Aluminium Work
22 Water Proofing
23 Horticulture and Landscaping
24 Rain Water Harvesting & Tube wells
25 Conservation of Heritage buildings
26 Structural Glazing and Composite
Aluminium Panel
4. The new items for 100 mm thick M-25, RCC drain covers and M-30 PU mould paver
blocks have been introduced in Sub head-16 Road work.
Analysis of few existing items in sub head -20 (pile Work) have been deleted. Similarly, analyses of many items have
5. Analysis of Rates for Delhi, 2014 is based on the current market rates of materials at
Delhi, collected during the period of March- April 2014. The basic rates of materials, incorporated in the an
6. The nomenclatures of main items have been printed along with the analysis of first
Sub item only to conserve the space and number of pages.
7. Sundries have been considered as 1.78 times, based on Cost Index of Delhi as on
01.04.2014 with a base as per PAR-2007.
8. A lot of effort has gone into the preparation of this DAR-2014, I convey my deep
appreciation and sincere thanks to Shri Mathura Prasad SE(TAS), Sh.P.P. Singh SE(QA), Shri K.R. Meena
9. Due care has been taken to print the C.P.W.D. Analysis of Rates for Delhi as correctly
as possible. It is, however possible that some errors might have crept in. In case any error or omission is n
New Delhi
June, 2014
(Mukesh Vij)
ADG (TD), CPWD,
Nirman Bhawan, New Delhi.
vi
CONTENTS
Vol. 2
SH. No. NAME OF SUB-HEAD PAGE No.
13 Finishing 689-740
19 Drainage 1203-1280
UB HEAD : 13.0
FINISHING
689
690
13.1 12 mm cement plaster of mix:
13.1.1 1:4 (1 cement : 4 fine sand)
MATERIAL:
LABOUR:
0155 day 0,940 41,700 39,198
Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 261,372
Add Water Charges @ 1% 2,614
TOTAL 263,986
Add CPOH @ 15% 39,598
Cost of 10 sqm 303,584
Cost of 1 sqm 30,358
Say 30,360
13.10 15 mm cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement on the
rough side of single or half brick wall.
36 Top layer Cement mortar 1:6 (1 cement : 6 fine sand) cum 0,072 280,575 20,201
Rate as per Item Number 3.6 of SH: Mortars
0155 LABOUR: day 1,210 41,700 50,457
Mason (average)
0115 Coolie day 1,290 32,900 42,441
0101 Bhisti day 1,050 36,300 38,115
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 207,090
Add Water Charges @ 1% 2,071
TOTAL 209,161
Add CPOH @ 15% 31,374
Cost of 10 sqm 240,535
Cost of 1 sqm 24,054
Say 24,055
13.12 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse
sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.
13.14 15 mm cement plaster 1:2 (1 cement : 2 stone dust) on the rough side of single or half brick wall. Code No
Details of cost for 10 sqm
MATERIAL:
312 Cement mortar 1:2 (1 cement : 2 stone dust) Rate as per Item cum 0,172 583,865 100,425
Number 3.12 of SH: Mortars
LABOUR:
0155 day 0,510 41,700 21,267
Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Extra for removing burrs, cleaning with wire brushes, pock making
L.S. 13,390 178 2,383
with pointed tool etc.
9999 Scaffolding and sundries. L.S. 11,700 178 2,083
TOTAL 115,976
Add Water Charges @ 1% 1,160
TOTAL 117,136
Add CPOH @ 15% 17,570
Cost of 10 sqm 134,706
Cost of 1 sqm 13,471
Say 13,470
13.17 6 mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat of neat cement and thick
coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.
6,453
065
6,518
978
7,496
5,065
5,065
TOTAL
Water Charges @ 1%
TAL Add CPOH @ 15%
ement used in the mix.
Say
13.22 Extra for plastering exterior walls of height more than 10 m from ground level for every additional height
of 3 m or part thereof.
Code No Description Unit Quantity Rate ` Amount `
9999 Details of cost for 10 sqm L.S. 53,820 178 9,580
Scaffolding and sundries.
LABOUR:
0155 Mason (average) day 0,200 41,700 8,340
LABOUR:
TOTAL 396.83
TOTAL 400.80
m 460.92
46.09
Say 46.10
13.26 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the
surface even and smooth complete.
LABOUR:
0155 day 0,270 41,700 11,259
Mason (average)
0115 Coolie day 0,270 32,900 8,883
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 1,430 178 255
TOTAL 27,304
Add Water Charges @ 1% 273
TOTAL 27,577
Add CPOH @ 15% 4,137
Cost of 10 metre long and 10cm wide band 31,714
Cost of 1 cm per metre 317
Say 315
13.28.2 Sunk Band
LABOUR:
0155 day 0,300 41,700 12,510
Mason (average)
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 2,080 178 370
TOTAL 29,657
Add Water Charges @ 1% 297
TOTAL 29,954
Add CPOH @ 15% 4,493
Cost of 10 metre long and 10cm wide band 34,447
Cost of 1 cm per metre 344
Say 345
13.28.3 Raised Band
LABOUR:
0155 day 0,500 41,700 20,850
Mason (average)
0115 Coolie day 0,600 32,900 19,740
0101 Bhisti day 0,930 36,300 33,759
9999 Sundries L.S. 7,150 178 1,273
9999 Scaffolding and racking out joints including sundries L.S. 14,300 178 2,545
TOTAL 91,572
Add Water Charges @ 1% 916
TOTAL 92,488
Add CPOH @ 15% 13,873
Cost of 10 sqm 106,361
Cost of 1 sqm 10,636
Say 10,635
13.31.2 Raised and cut pointing
TOTAL 148,714
Add Water Charges @ 1% 1,487
TOTAL 150,201
Add CPOH @ 15% 22,530
Cost of 10 sqm 172,731
Cost of 1 sqm 17,273
Say 17,275
13.32 Pointing on tile brick work with cement mortar 1:3 (1 cement :3 fine sand):
13.32.1 Flush / Ruled / Struck or weathered pointing
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item
33 cum 0,046 446,835 20,554
Number 3.3 of SH: Mortars
9999 Sundries LABOUR: L.S. 7,150 178 1,273
TOTAL 254,348
Add Water Charges @ 1% 2,543
TOTAL 256,891
Add CPOH @ 15% 38,534
Cost of 10 sqm 295,425
Cost of 1 sqm 29,543
Say 29,540
13.35 Pointing on stone slab ceiling with cement mortar 1:2 (1 cement : 2 fine sand):
13.35.1 Flush / Ruled pointing
LABOUR:
TOTAL 47.66
TOTAL 48.14
m 55.36
5.54
Say 5.55
13.41.1 New work (two or more coats) over and including priming coat with water thinnable cement primer Code No De
Details of cost for 10 sqm
0808 MATERIAL:
Water thinnable cement primer for interior wall surface,
having VOC content less than 50 grams/ litre litre 0,700 8,000 5,600
9999 Brushes, putty etc. L.S. 7,150 178 1,273
9999 Sundries including carriage L.S. 8,060 178 1,435
0816 Oil bound washable distemper/ Acrylic distemper kilogram 1,500 5,500 8,250
9999 Carriage of material L.S. 4,420 178 787
9999 Brushes, sand paper and putty for filling holes L.S. 11.700 1.78 20.83
0131 LABOUR: day 1.000 399.00 399.00
Painter
0115 Coolie day 0,500 32,900 16,450
9999 Sundries L.S. 8,060 178 1,435
TOTAL 77,213
Add Water Charges @ 1% 772
TOTAL 77,985
Add CPOH @ 15% 11,698
Cost of 10 sqm 89,683
Cost of 1 sqm 8,968
Say 8,970
13.42 Distempering with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer, of
required shade and colour complete as per manufacturers specification.
13.42.1 Two or more coats on new work
MATERIAL:
0816 Oil bound washable distemper/ Acrylic distemper kilogram 1.500 55.00 82.50
ltr/ 10 sqm over an under coat of primer applied @ 0.75 ltr/ 10 sqm of approved brand and manufacture Code No Descri
Details of cost for 10 sqm
MATERIAL:
8504 Multi surface paint litre 0,900 29,000 26,100
8509 Special Primer (C.W.) litre 0,750 15,000 11,250
9999 Carriage of material L.S. 1,560 178 278
LABOUR:
0131 day 0,600 39,900 23,940
Painter
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,020 178 1,250
Code No Description Unit Quantity Rate ` Amount `
9999 Sundries L.S. 8,060 178 1,435
TOTAL 75,938
Add Water Charges @ 1% 759
TOTAL 76,697
Add CPOH @ 15% 11,505
Cost of 10 sqm 88,202
Cost of 1 sqm 8,820
Say 8,820
13.48.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @
0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
8504 MATERIAL: litre 0,900 29,000 26,100
Multi surface paint
8510 Metal Primer (U.G.) litre 0,800 16,000 12,800
9999 Carriage of material LABOUR: L.S. 1.560 1.78 2.78
0131 Painter day 0.600 399.00 239.40
9999 Materials for filling in holes and cracks L.S. 6,760 178 1,203
9999 Carriage of material LABOUR: L.S. 1.430 1.78 2.55
0131 Painter day 0.540 399.00 215.46
TOTAL 998.19
TOTAL 1008.17
5% 151.23
e 1159.40
e 38.65
Say 38.65
TOTAL 91,460
Add Water Charges @ 1% 915
TOTAL 92,375
Add CPOH @ 15% 13,856
Cost of 10 sqm 106,231
Cost of 1 sqm 10,623
Say 10,625
13.63 Painting with aluminium paint of approved brand and manufacture to give an even shade.
13.63.1 Two or more coats on new work
Rates for Delhi 2013 with updated correction slips, including analysis of existing items and also corresponding new items introdu
ses of many items have been modified to correspond to items of DSR 2014. Few new analysis and sub items have been introd
ncorporated in the analysis, pertain to materials conforming to BIS Standards/ CPWD Specifications/Materials of goo
QA), Shri K.R. Meena EE (TAS-I), Sh. A.K. Goel EE(QA-I), Shri Chhabilal Singh AE, Shri S.C. Saxena AE, Shri Ram
error or omission is noticed, it may be brought to the notice of the Superintending Engineer (TAS), CPWD, Room no
GE No.
-740
-796
-830
-936
-1008
9-1202
3-1280
1-1306
7-1330
1-1350
1-1352
3-1372
3-1380
1-1392
52,374
27,939
24,675
33,396
2,245
140,629
1,406
142,035
21,305
163,340
16,334
16,335
40,403
27,939
24,675
33,396
2,245
128,658
1,287
129,945
19,492
149,437
14,944
14,945
62,557
33,360
28,952
35,937
2,245
163,051
1,631
164,682
24,702
189,384
18,938
18,940
48,259
33,360
28,952
35,937
2,245
148,753
1,488
150,241
22,536
172,777
17,278
17,280
81,470
39,198
33,558
39,930
2,245
196,401
1,964
198,365
29,755
228,120
22,812
22,810
62,849
39,198
33,558
39,930
2,245
177,780
1,778
179,558
26,934
206,492
20,649
20,650
60,078
27,939
24,675
33,396
2,245
148,333
1,483
149,816
22,472
172,288
17,229
17,230
27,939
24,675
33,396
2,245
136,362
1,364
137,726
20,659
158,385
15,839
15,840
Unit Quantity Rate ` Amount `
71,759
33,360
28,952
35,937
2,245
172,253
1,723
173,976
26,096
200,072
20,007
20,005
57,461
33,360
28,952
35,937
2,245
157,955
1,580
159,535
23,930
183,465
18,347
18,345
93,454
39,198
33,558
39,930
2,245
208,385
2,084
210,469
31,570
242,039
24,204
24,205
39,198
33,558
39,930
2,245
189,764
1,898
191,662
28,749
220,411
22,041
22,040
64,344
27,939
24,675
33,396
2,245
12,600
189
11,259
8,883
1,435
186,965
1,870
188,835
28,325
217,160
21,716
21,715
52,374
27,939
24,675
33,396
2,245
12,600
189
11,259
8,883
1,435
174,995
1,750
176,745
26,512
203,257
20,326
20,325
28,952
35,937
2,245
12,600
189
11,259
8,883
1,435
211,716
2,117
213,833
32,075
245,908
24,591
24,590
62,557
33,360
28,952
35,937
2,245
12,600
189
11,259
8,883
1,435
197,417
1,974
199,391
29,909
229,300
22,930
22,930
27,939
24,675
33,396
2,245
Amount `
12,600
189
11,259
8,883
1,435
194,669
1,947
196,616
29,492
226,108
22,611
22,610
112,075
39,198
33,558
39,930
2,245
12,600
189
11,259
8,883
1,435
261,372
2,614
263,986
39,598
303,584
30,358
30,360
86,058
33,360
28,952
35,937
2,245
12,600
189
11,259
8,883
Amount `
1,435
220,918
2,209
223,127
33,469
256,596
25,660
25,660
53,631
20,201
50,457
42,441
38,115
2,245
207,090
2,071
209,161
31,374
240,535
24,054
24,055
53,631
36,024
50,457
42,441
38,115
2,245
84,077
27,939
24,675
33,396
2,245
172,332
1,723
174,055
26,108
200,163
20,016
20,015
100,425
33,360
28,952
35,937
2,245
200,919
2,009
202,928
30,439
233,367
23,337
23,335
130,786
39,198
33,558
39,930
2,245
245,717
2,457
248,174
37,226
285,400
28,540
28,540
32,172
21,267
24,675
33,396
2,383
2,083
115,976
1,160
117,136
17,570
134,706
13,471
13,470
32,172
21,267
24,675
33,396
2,383
2,083
12,600
189
11,259
8,883
1,435
500
370
093
2,541
2,303
486
Amount `
13,860
208
11,259
8,883
1,435
35,645
356
36,001
5,400
41,401
4,140
4,140
layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster 1:3 (1 cement : 3 fine sand) mixed with 10% finel
60,078
27,939
24,675
33,396
17.59
536.20
25,437
22,701
30,855
1,759
11,000
363
2,070
648
20,850
16,450
3,630
1,759
10,875
8,225
358,089
3,581
361,670
54,250
415,920
41,592
41,590
2 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) mixed w
60,078
27,939
24,675
33,396
17.59
536.20
25,437
22,701
30,855
1,759
11,000
363
2,070
648
20,850
16,450
3,630
1,759
787
339,776
3,398
343,174
51,476
394,650
39,465
39,465
Amount `
Amount `
9,580
8,340
9,870
3,630
1,273
32,693
327
33,020
4,953
37,973
3,797
3,795
Amount `
8,340
6,580
1,273
16,193
162
16,355
2,453
18,808
1,881
1,880
Amount `
12,510
9,870
2,383
24,763
248
25,011
3,752
28,763
2,876
2,875
Amount `
125,100
65,800
32,900
9,075
2,383
235,258
2,353
237,611
35,642
273,253
27,325
27,325
Amount `
208,500
98,700
65,800
11,979
2,383
387,362
3,874
391,236
58,685
449,921
44,992
44,990
Amount `
31,275
24,346
4,790
60,411
604
61,015
9,152
70,167
7,017
7,015
Amount `
33,360
26,320
6,063
65,743
657
66,400
9,960
76,360
7,636
7,635
29,939
14,948
95,516
955
96,471
14,471
110,942
11,094
11,095
Amount `
20,850
16,450
324
37,624
376
38,000
5,700
43,700
4,370
4,370
5,092
11,259
8,883
1,815
255
27,304
273
27,577
4,137
31,714
317
315
12,510
9,870
1,815
370
29,657
297
29,954
4,493
34,447
344
345
5,092
14,595
11,515
1,815
486
33,503
335
33,838
5,076
38,914
389
390
5,092
27,105
21,385
1,815
278
55,675
557
56,232
8,435
64,667
647
645
7,274
15,012
11,844
2,178
486
36,794
368
37,162
5,574
42,736
427
425
7,274
17,514
13,818
2,178
787
41,571
416
41,987
6,298
48,285
483
485
8,729
35,862
28,294
1,815
486
75,186
752
75,938
11,391
87,329
873
875
5,214
36.37
358.62
28,294
1,815
486
75,308
753
76,061
11,409
87,470
875
875
Amount `
13,405
20,850
19,740
33,759
1,273
2,545
91,572
916
92,488
13,873
106,361
10,636
10,635
44,619
43,099
36,300
1,273
Amount `
2,869
148,714
1,487
150,201
22,530
172,731
17,273
17,275
Amount `
20,554
1,273
27,939
26,320
46,464
2,869
125,419
1,254
126,673
19,001
145,674
14,567
14,565
Amount `
10,277
1,273
38,364
45,073
33,759
2,869
131,615
1,316
132,931
19,940
152,871
15,287
15,285
Amount `
16,980
12.73
834.00
97,384
36,300
2,869
238,206
2,382
240,588
36,088
276,676
27,668
27,670
33,122
12.73
834.00
97,384
36,300
2,869
254,348
2,543
256,891
38,534
295,425
29,543
29,540
8,188
19,599
22,701
21,417
Amount `
2,869
74,774
748
75,522
11,328
86,850
8,685
8,685
Amount `
1,950
1.62
72.60
3,290
787
486
13,935
139
14,074
2,111
16,185
1,619
1,620
500
370
093
2,904
Amount `
1,316
486
5,669
057
5,726
859
6,585
659
660
Amount `
1,950
1,435
162
10,890
3,290
787
486
19,000
190
19,190
2,878
22,068
2,207
2,205
Amount `
1,950
1,435
162
10,890
3,290
486
486
18,699
187
18,886
2,833
21,719
2,172
2,170
5,600
486
5,400
278
12.73
319.20
13,160
949
59,066
591
59,657
8,949
68,606
6,861
6,860
5,600
1,273
1,435
8,250
787
20.83
399.00
16,450
1,435
77,213
772
77,985
11,698
89,683
8,968
8,970
15,134
1,435
43,625
436
44,061
6,609
50,670
5,067
5,065
Unit Quantity Rate ` Amount `
5,600
12.73
159.60
6,580
1,435
30,848
308
31,156
4,673
35,829
3,583
3,585
17,280
2.78
183.54
7,567
3,630
1,273
1,435
49,817
498
50,315
7,547
57,862
5,786
5,785
78,720
8,800
2.78
239.40
9,870
1,815
1,250
1,435
126,108
1,261
127,369
19,105
146,474
14,647
14,645
or primer applied @ 2.20 kg/ 10 sqm)
Amount `
30,060
8,800
2.78
239.40
9,870
1,815
1,273
1,435
77,471
775
78,246
11,737
89,983
8,998
9,000
34,320
8,800
278
Amount `
23,940
9,870
1,815
1,273
1,435
81,731
817
82,548
12,382
94,930
9,493
9,495
36,250
11,250
278
23,940
9,870
1,815
1,250
1,435
86,088
861
86,949
13,042
99,991
9,999
10,000
26,100
11,250
278
23,940
9,870
1,815
1,250
Amount `
1,435
75,938
759
76,697
11,505
88,202
8,820
8,820
Amount `
26,100
12,800
2.78
239.40
9,870
1,815
1,250
1,435
77,488
775
78,263
11,739
90,002
9,000
9,000
nd soft wood)
Amount `
6,750
486
0.69
99.75
8,225
949
1,921
28,375
284
28,659
4,299
32,958
3,296
3,295
Amount `
9,750
486
0.69
99.75
8,225
949
1,921
31,375
314
31,689
4,753
36,442
3,644
3,645
3,780
0.93
95.76
7,896
1,921
23,266
233
23,499
3,525
27,024
2,702
2,700
0.69
47.88
3,948
1,273
12,598
126
12,724
1,909
14,633
1,463
1,465
36,000
093
4.86
107.73
8,883
949
1,921
59,105
591
59,696
8,954
68,650
6,865
6,865
57,600
093
4.86
171.57
14,147
1,518
3,072
94,073
941
95,014
14,252
109,266
10,927
10,925
9,975
8,225
972
Unit Quantity Rate ` Amount `
18.97
312.50
2.55
215.46
17,766
1,203
1,435
100,329
1,003
101,332
15,200
116,532
11,653
11,655
7,560
2,407
0.93
99.75
8,225
486
14.35
302.50
1,203
2.55
215.46
17,766
1,921
1,203
104,325
1,043
105,368
15,805
121,173
12,117
12,115
mordant solution.
2,520
069
4,788
3,948
1,273
12,800
255
21,546
17,766
1,203
1,435
67,603
676
68,279
10,242
78,521
7,852
7,850
Amount `
1,140
324
162
23,940
19,740
6,387
6,387
58,080
581
58,661
8,799
67,460
2,698
2,700
Amount `
045
390
286
026
324
1.62
239.40
19,740
6,387
6,387
57,687
577
58,264
8,740
67,004
2,680
2,680
3,780
0.93
95.76
7,896
19.21
109.25
2.55
215.46
17,766
949
1,435
949
10,876
87,967
880
88,847
13,327
102,174
3,406
3,405
5,600
14,364
11,844
2,846
1.62
162.15
3.70
319.20
26,320
1,531
2,129
1,273
16,753
131,327
1,313
132,640
19,896
152,536
5,085
5,085
er on new work.
3,780
093
9,576
7,896
1,921
20,880
255
949
21,546
17,766
1,203
2,129
5,600
1.16
143.64
11,844
28.46
309.60
370
14.12
319.20
26,320
1,782
3,170
18,049
148,753
1,488
150,241
22,536
172,777
5,759
5,760
Amount `
15,000
0.93
59.85
4,935
740
694
27,447
274
27,721
4,158
31,879
3,188
3,190
171,000
2.55
215.46
17,766
1,203
1,435
213,205
2,132
215,337
32,301
247,638
24,764
24,765
Amount `
255
8,400
255
24.00
141.47
949
949
27,355
274
27,629
4,144
31,773
3,177
3,175
25,410
1,203
255
21,546
17,766
1,921
Unit Quantity Rate ` Amount `
1,203
69,304
693
69,997
10,500
80,497
8,050
8,050
20,880
949
2.55
215.46
17,766
1,203
1,435
64,034
640
64,674
9,701
74,375
7,438
7,440
6,750
486
069
9,975
8,225
949
1,921
20,880
255
21,546
17,766
1,203
91,460
915
92,375
13,856
106,231
10,623
10,625
12,800
255
9.49
215.46
17,766
1,203
2,129
56,648
566
57,214
8,582
65,796
6,580
6,580
23,200
255
9.49
215.46
17,766
1,203
1,435
66,354
664
67,018
10,053
77,071
7,707
7,705
10,925
2.55
215.46
17,766
949
1,435
52,876
529
53,405
8,011
61,416
6,142
6,140
21,460
255
9.49
215.46
17,766
1,203
1,435
64,614
646
65,260
9,789
75,049
7,505
7,505
7,000
490
22,040
255
949
35,910
Amount `
29,610
1,203
1,273
98,730
987
99,717
14,958
114,675
11,468
11,470
Amount `
7,000
490
23,940
255
4.86
359.10
29,610
1,203
1,273
100,167
1,002
101,169
15,175
116,344
11,634
11,635
Amount `
11,410
1,273
7,200
486
2,869
2,383
2.55
1396.50
1,435
166,961
1,670
168,631
25,295
193,926
19,393
19,395
CPWD, New Delhi
. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using o
machinery in various items of work normally involved in civil construction projects.
13. Since publication of Analysis of Rates for Delhi -2013, prices of labour and materials have registere
Shri B.B. Dhar, Chief Engineer(CSQ) and the efforts put in by Shri Mathura Prasad, SE TAS (CSQ) and h
ndertakings also besides various units of CPWD.
ecifications/Materials of good quality generally available in the market. Labour rates are the minimum wages issued
S.C. Saxena AE, Shri Ram Janam Chaudhary JE, Shri Vijay Kumar Chief Estimator, Shri Bahal Singh Sr. Drafts Man
eer (TAS), CPWD, Room no. 418, A-wing, Nirman Bhawan, New Delhi.
Unit Quantity Rate ` Amount `
3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
Unit Quantity Rate ` Amount `
Unit Quantity Rate ` Amount `
directly or indirectly by using or following items of DSR by such Govt./Private bodies or individuals.
materials have registered substantial increase. Besides the increased cost, there has been a spurt of
asad, SE TAS (CSQ) and his team of officers in TAS unit in finalizing Analysis of Rates for Delhi 2014 in
the minimum wages issued by the Government of Delhi w.e.f. 01.04.2014.
ri Bahal Singh Sr. Drafts Man, Shri Vijay Singh Sr.Drafts Man, and other officers & staff of TAS unit for sincere efforts
here has been a spurt of new construction materials and introduction of Green Building Concept of con