GOVERNMENT OF INDIA
LIC WORKS DEPARTMENT

F RATES FOR DELHI


(VOL -2)

###
Published Under The Authority of Director General CPWD
All rights reserved. No part of this publication, either in English or in Hindi, may be reproduced in
any form or by any means, electronic or mechanical including photocopy, recording or any information storage and re
This Analysis of Rates 2014 for Delhi is prepared for the use of CPWD. However, this may be used by other Govt. de
A GOVERNMENT OF INDIA PUBLICATION
Published by
Director General
Central Public Works Department Nirman Bhawan
New Delhi-110011
Price : Rs. 3000/-
Per Set of 2 Volumes
Excluding, Postage, Packing and Delivery Charges etc.
Printed and Marketed by
M/s Kshitiz Enterprises D-57 South Extension Part-1 New Delhi-110049
Phone : 011-41648857,
Mobile : 9811032311, 9311332311
Email: sales@kshitiz.com
kshitizenterprisesdel@gmail.com
Also available at
All leading Govt. Book Dealers in India
ii
V.K. GUPTA
Director General
Hkkjr ljdkj
Government of India

FOREWORD
56/1317, Fax : 23061884
Email: cpwd_dgw@nic.in

Central Public Works Department Analysis of Rates for Delhi is a very


comprehensive and useful document forming basis for the rates of various items. It is based o
It was first compiled in the year 1950, followed by subsequent publication or revision in the ye
The analysis of existing items has been updated in conformity with updated items of works in
I wish to place on record the technical input and the effective coordination on the part of Shri
I am sure that C.P.W.D. Analysis of Rates for Delhi 2014 shall be very useful document to vario
Place : New Delhi
Date : July 2014 (V.K. Gupta)
..
PREFACE
1. C.P.W.D. Analysis of Rates for Delhi 2014 is the revised edition of C.P.W.D. Analysis
of Rates for Delhi 2013.
2. Analysis of Rates for Delhi 2014 incorporates most of the analysis of items of Analysis of Rates for Delhi 2013 with
3. Analysis of Rates for Delhi, 2014 is published in two volumes i.e. volume I & II as under:
Volume Number Sub-head No. Content/ Sub-head

One 00 Basic Rates Carriage of materials Earth Work


01 Mortars Concrete Work
02 Reinforced Cement Concrete Brick Work
03 Stone Work
04 Marble & Granite Work Wood and PVC Work Steel
05 Work
06 Flooring Roofing
07
08
09
10
11
12

Two 13 Finishing
14 Repairs to Buildings
15 Dismantling and Demolishing
Two

16 Road Work
17 Sanitary Installations
18 Water Supply
19 Drainage
20 Pile work
21 Aluminium Work
22 Water Proofing
23 Horticulture and Landscaping
24 Rain Water Harvesting & Tube wells
25 Conservation of Heritage buildings
26 Structural Glazing and Composite
Aluminium Panel
4. The new items for 100 mm thick M-25, RCC drain covers and M-30 PU mould paver
blocks have been introduced in Sub head-16 Road work.
Analysis of few existing items in sub head -20 (pile Work) have been deleted. Similarly, analyses of many items have
5. Analysis of Rates for Delhi, 2014 is based on the current market rates of materials at
Delhi, collected during the period of March- April 2014. The basic rates of materials, incorporated in the an
6. The nomenclatures of main items have been printed along with the analysis of first
Sub item only to conserve the space and number of pages.
7. Sundries have been considered as 1.78 times, based on Cost Index of Delhi as on
01.04.2014 with a base as per PAR-2007.
8. A lot of effort has gone into the preparation of this DAR-2014, I convey my deep
appreciation and sincere thanks to Shri Mathura Prasad SE(TAS), Sh.P.P. Singh SE(QA), Shri K.R. Meena
9. Due care has been taken to print the C.P.W.D. Analysis of Rates for Delhi as correctly
as possible. It is, however possible that some errors might have crept in. In case any error or omission is n
New Delhi
June, 2014
(Mukesh Vij)
ADG (TD), CPWD,
Nirman Bhawan, New Delhi.
vi
CONTENTS
Vol. 2
SH. No. NAME OF SUB-HEAD PAGE No.
13 Finishing 689-740

14 Repairs to Building 741-796

15 Dismantling & Demolishing 797-830

16 Road Work 831-936

17 Sanitary Installations 937-1008


18 Water Supply 1009-1202

19 Drainage 1203-1280

20 Pile Work 1281-1306

21 Aluminium Work 1307-1330

22 Water Proofing 1331-1350

23 Horticulture & Landscaping 1351-1352

24 Rain Water Harvesting & Tubewells 1353-1372

25 Conservation of Heritage Buildings 1373-1380

26 Structural Glazing and Aluminium Composite Panel 1381-1392


Note : For Sub Heads 1 to 12 refer to Vol.1
.

UB HEAD : 13.0
FINISHING
689
690
13.1 12 mm cement plaster of mix:
13.1.1 1:4 (1 cement : 4 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm.
MATERIAL:
Cement mortar 1 : 4 (1 cement: 4 fine sand) Rate as per Item
34 Number 3.4 of SH: Mortars cum 0,144 363,705 52,374
0155 Mason (average) day 0,670 41,700 27,939
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 140,629
Add Water Charges @ 1% 1,406
TOTAL 142,035
Add CPOH @ 15% 21,305
Cost of 10 sqm 163,340
Cost of 1 sqm 16,334
Say 16,335
13.1.2 1:6 (1 cement : 6 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1 : 6 (1 cement: 6 fine sand) Rate as per Item
36 Number 3.6 of SH: Mortars cum 0,144 280,575 40,403
0155 LABOUR: day 0,670 41,700 27,939
Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 128,658
Add Water Charges @ 1% 1,287
TOTAL 129,945
Add CPOH @ 15% 19,492
Cost of 10 sqm 149,437
Cost of 1 sqm 14,944
Say 14,945
13.2 15 mm cement plaster on the rough side of single or half brick wall of mix:
13.2.1 1:4 (1 cement : 4 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1 : 4 (1 cement: 4 fine sand) Rate as per Item
34 Number 3.4 of SH: Mortars cum 0,172 363,705 62,557
0155 LABOUR: day 0,800 41,700 33,360
Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 163,051
Add Water Charges @ 1% 1,631
TOTAL 164,682
Add CPOH @ 15% 24,702
Cost of 10 sqm 189,384
Cost of 1 sqm 18,938
Say 18,940
13.2.2 1:6 (1 cement : 6 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
36 Cement mortar 1 : 6 (1 cement: 6 fine sand) Rate as per Item cum 0,172 280,575 48,259
Number 3.6 of SH: Mortars

0155 LABOUR: day 0,800 41,700 33,360


Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 148,753
Add Water Charges @ 1% 1,488
TOTAL 150,241
Add CPOH @ 15% 22,536
Cost of 10 sqm 172,777
Cost of 1 sqm 17,278
Say 17,280
13.3 20 mm cement plaster of mix:
13.3.1 1:4 (1 cement : 4 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1 : 4 (1 cement: 4 fine sand) Rate as per Item
34 Number 3.4 of SH: Mortars cum 0,224 363,705 81,470
0155 LABOUR: day 0,940 41,700 39,198
Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 196,401
Add Water Charges @ 1% 1,964
TOTAL 198,365
Add CPOH @ 15% 29,755
Cost of 10 sqm 228,120
Cost of 1 sqm 22,812
Say 22,810
13.3.2 1:6 (1 cement : 6 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1 : 6 (1 cement: 6 fine sand) Rate as per Item
36 Number 3.6 of SH: Mortars cum 0,224 280,575 62,849
0155 LABOUR: day 0,940 41,700 39,198
Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 177,780
Add Water Charges @ 1% 1,778
TOTAL 179,558
Add CPOH @ 15% 26,934
Cost of 10 sqm 206,492
Cost of 1 sqm 20,649
Say 20,650
13.4 12 mm cement plaster of mix:
13.4.1 1:4 (1 cement : 4 coarse sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:4 (1 cement : 4 coarse sand) Rate as per Item
39 Number 3.9 of SH: Mortars cum 0,144 417,205 60,078
0155 LABOUR: day 0,670 41,700 27,939
Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 148,333
Add Water Charges @ 1% 1,483
TOTAL 149,816
Add CPOH @ 15% 22,472
Cost of 10 sqm 172,288
Cost of 1 sqm 17,229
Say 17,230
13.4.2 1:6 (1 cement : 6 coarse sand)

Code No Description Unit Quantity


MATERIAL:
311 Cement mortar 1:6 (1 cement : 6 coarse sand) Rate as per Item cum 0,144 334,075 48,107
Number 3.11 of SH: Mortars

0155 LABOUR: day 0,670 41,700 27,939


Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 136,362
Add Water Charges @ 1% 1,364
TOTAL 137,726
Add CPOH @ 15% 20,659
Cost of 10 sqm 158,385
Cost of 1 sqm 15,839
Say 15,840
13.5 15 mm cement plaster on rough side of single or half brick wall of mix:
13.5.1 1:4 (1 cement : 4 coarse sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:4 (1 cement : 4 coarse sand) Rate as per Item
39 Number 3.9 of SH: Mortars cum 0,172 417,205 71,759
0155 LABOUR: day 0,800 41,700 33,360
Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 172,253
Add Water Charges @ 1% 1,723
TOTAL 173,976
Add CPOH @ 15% 26,096
Cost of 10 sqm 200,072
Cost of 1 sqm 20,007
Say 20,005
13.5.2 1:6 (1 cement : 6 coarse sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
311 Cement mortar 1:6 (1 cement : 6 coarse sand) Rate as per Item cum 0,172 334,075 57,461
Number 3.11 of SH: Mortars

0155 LABOUR: day 0,800 41,700 33,360


Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 157,955
Add Water Charges @ 1% 1,580
TOTAL 159,535
Add CPOH @ 15% 23,930
Cost of 10 sqm 183,465
Cost of 1 sqm 18,347
Say 18,345
13.6 20 mm cement plaster of mix:
13.6.1 1:4 (1 cement : 4 coarse sand)

Code No Description Unit Quantity


MATERIAL:
39 Cement mortar 1:4 (1 cement : 4 coarse sand) Rate as per Item cum 0,224 417,205 93,454
Number 3.9 of SH: Mortars

0155 LABOUR: day 0,940 41,700 39,198


Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 208,385
Add Water Charges @ 1% 2,084
TOTAL 210,469
Add CPOH @ 15% 31,570
Cost of 10 sqm 242,039
Cost of 1 sqm 24,204
Say 24,205
13.6.2 1:6 (1 cement : 6 coarse sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
311 Cement mortar 1:6 (1 cement : 6 coarse sand) Rate as per Item cum 0,224 334,075 74,833
Number 3.11 of SH: Mortars

0155 LABOUR: day 0,940 41,700 39,198


Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 189,764
Add Water Charges @ 1% 1,898
TOTAL 191,662
Add CPOH @ 15% 28,749
Cost of 10 sqm 220,411
Cost of 1 sqm 22,041
Say 22,040
13.7 12 mm cement plaster finished with a floating coat of neat cement of mix:
13.7.1 1:3 (1 cement : 3 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
33 Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item cum 0,144 446,835 64,344
Number 3.3 of SH: Mortars

0155 LABOUR: day 0,670 41,700 27,939


Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 186,965
Add Water Charges @ 1% 1,870
TOTAL 188,835
Add CPOH @ 15% 28,325
Cost of 10 sqm 217,160
Cost of 1 sqm 21,716
Say 21,715
13.7.2 1:4 (1 cement : 4 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
34 Cement mortar 1 : 4 (1 cement: 4 fine sand) Rate as per Item cum 0,144 363,705 52,374
Number 3.4 of SH: Mortars

0155 LABOUR: day 0,670 41,700 27,939


Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 174,995
Add Water Charges @ 1% 1,750
TOTAL 176,745
Add CPOH @ 15% 26,512
Cost of 10 sqm 203,257
Cost of 1 sqm 20,326
Say 20,325
13.8 15 mm cement plaster on rough side of single or halfbrick wall finished with a floating coat of neat
cement of mix :
13.8.1 1:3 (1 cement : 3 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm

MATERIAL:

Cement mortar 1:3 (1 cement : 3 fine sand)

Code No Description Unit Quantity


3.3 Rate as per Item Number 3.3 of SH: Mortars LABOUR: cum 0.172 4468.35 768.56
0155 Mason (average) day 0.800 417.00 333.60

0115 Coolie day 0,880 32,900 28,952


0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 211,716
Add Water Charges @ 1% 2,117
TOTAL 213,833
Add CPOH @ 15% 32,075
Cost of 10 sqm 245,908
Cost of 1 sqm 24,591
Say 24,590
13.8.2 1:4 (1 cement : 4 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
34 Cement mortar 1 : 4 (1 cement: 4 fine sand) Rate as per Item cum 0,172 363,705 62,557
Number 3.4 of SH: Mortars

0155 LABOUR: day 0,800 41,700 33,360


Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 197,417
Add Water Charges @ 1% 1,974
TOTAL 199,391
Add CPOH @ 15% 29,909
Cost of 10 sqm 229,300
Cost of 1 sqm 22,930
Say 22,930
13.9 cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement.
13.9.1 12 mm cement plaster

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 coarse sand)
38 Rate as per Item Number 3.8 of SH: Mortars cum 0,144 500,335 72,048
LABOUR:
0155 Mason (average) day 0,670 41,700 27,939
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
Code No Description Unit Quantity Rate ` Amount `
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 194,669
Add Water Charges @ 1% 1,947
TOTAL 196,616
Add CPOH @ 15% 29,492
Cost of 10 sqm 226,108
Cost of 1 sqm 22,611
Say 22,610
13.9.2 20 mm cement plaster

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
38 Cement mortar 1:3 (1 cement : 3 coarse sand) Rate as per Item cum 0,224 500,335 112,075
Number 3.8 of SH: Mortars

LABOUR:
0155 day 0,940 41,700 39,198
Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 261,372
Add Water Charges @ 1% 2,614
TOTAL 263,986
Add CPOH @ 15% 39,598
Cost of 10 sqm 303,584
Cost of 1 sqm 30,358
Say 30,360
13.10 15 mm cement plaster 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement on the
rough side of single or half brick wall.

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 coarse sand)
38 Rate as per Item Number 3.8 of SH: Mortars cum 0,172 500,335 86,058
LABOUR:
0155 Mason (average) day 0,800 41,700 33,360
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
Code No Description Unit Quantity Rate ` Amount `
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 220,918
Add Water Charges @ 1% 2,209
TOTAL 223,127
Add CPOH @ 15% 33,469
Cost of 10 sqm 256,596
Cost of 1 sqm 25,660
Say 25,660
13.11 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse
sand) finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand).

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
310 Under layer Cement mortar 1:5 (1 cement : 5 coarse sand) cum 0,144 372,440 53,631
Rate as per Item Number 3.10 of SH: Mortars

36 Top layer Cement mortar 1:6 (1 cement : 6 fine sand) cum 0,072 280,575 20,201
Rate as per Item Number 3.6 of SH: Mortars
0155 LABOUR: day 1,210 41,700 50,457
Mason (average)
0115 Coolie day 1,290 32,900 42,441
0101 Bhisti day 1,050 36,300 38,115
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 207,090
Add Water Charges @ 1% 2,071
TOTAL 209,161
Add CPOH @ 15% 31,374
Cost of 10 sqm 240,535
Cost of 1 sqm 24,054
Say 24,055
13.12 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse
sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge.

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Under layer Cement mortar 1:5 (1 cement :
5 coarse sand)
310 Rate as per Item Number 3.10 of SH: Mortars cum 0,144 372,440 53,631
Top layer Cement mortar 1:3 (1 cement : 3 coarse sand)
38 Rate as per Item Number 3.8 of SH: Mortars cum 0,072 500,335 36,024
LABOUR:
0155 Mason (average) day 1,210 41,700 50,457
0115 Coolie day 1,290 32,900 42,441
0101 Bhisti day 1,050 36,300 38,115
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
13.13 12 mm cement plaster 1:2 (1 cement : 2 stone dust)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
312 Cement mortar 1:2 (1 cement : 2 stone dust) Rate as per Item cum 0,144 583,865 84,077
Number 3.12 of SH: Mortars

0155 LABOUR: day 0,670 41,700 27,939


Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 172,332
Add Water Charges @ 1% 1,723
TOTAL 174,055
Add CPOH @ 15% 26,108
Cost of 10 sqm 200,163
Cost of 1 sqm 20,016
Say 20,015

13.14 15 mm cement plaster 1:2 (1 cement : 2 stone dust) on the rough side of single or half brick wall. Code No
Details of cost for 10 sqm
MATERIAL:
312 Cement mortar 1:2 (1 cement : 2 stone dust) Rate as per Item cum 0,172 583,865 100,425
Number 3.12 of SH: Mortars

0155 LABOUR: day 0,800 41,700 33,360


Mason (average)
0115 Coolie day 0,880 32,900 28,952
0101 Bhisti day 0,990 36,300 35,937
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 200,919
Add Water Charges @ 1% 2,009
TOTAL 202,928
Add CPOH @ 15% 30,439
Cost of 10 sqm 233,367
Cost of 1 sqm 23,337
Say 23,335
13.15 20 mm cement plaster 1:2 (1 cement : 2 stone dust)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
312 Cement mortar 1:2 (1 cement : 2 stone dust) Rate as per Item cum 0,224 583,865 130,786
Number 3.12 of SH: Mortars

0155 LABOUR: day 0,940 41,700 39,198


Mason (average)
0115 Coolie day 1,020 32,900 33,558
0101 Bhisti day 1,100 36,300 39,930
9999 Scaffolding and sundries. L.S. 12,610 178 2,245
TOTAL 245,717
Add Water Charges @ 1% 2,457
TOTAL 248,174
Add CPOH @ 15% 37,226
Cost of 10 sqm 285,400
Cost of 1 sqm 28,540
Say 28,540
13.16 6 mm cement plaster of mix:
13.16.1 1:3 (1 cement : 3 fine sand)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
33 Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item cum 0,072 446,835 32,172
Number 3.3 of SH: Mortars

LABOUR:
0155 day 0,510 41,700 21,267
Mason (average)
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Extra for removing burrs, cleaning with wire brushes, pock making
L.S. 13,390 178 2,383
with pointed tool etc.
9999 Scaffolding and sundries. L.S. 11,700 178 2,083
TOTAL 115,976
Add Water Charges @ 1% 1,160
TOTAL 117,136
Add CPOH @ 15% 17,570
Cost of 10 sqm 134,706
Cost of 1 sqm 13,471
Say 13,470
13.17 6 mm cement plaster 1:3 (1 cement : 3 fine sand) finished with a floating coat of neat cement and thick
coat of Lime wash on top of walls when dry for bearing of R.C.C. slabs and beams.

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 fine sand)
33 Rate as per Item Number 3.3 of SH: Mortars cum 0,072 446,835 32,172
LABOUR:
0155 Mason (average) day 0,510 41,700 21,267
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Extra for removing burrs, cleaning with wire brushes,
pock making with pointed tool etc.
complete L.S. 13,390 178 2,383
9999 Scaffolding and sundries. L.S. 11,700 178 2,083
0367 Portland Cement tonne 0,020 630,000 12,600
2209 Carriage of cement tonne 0,020 9,465 189
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
0776 Satna lime quintal 0,010 50,000 500
9999 Indigo gum etc. L.S. 2,080 178 370
9999 Sundries, ladder etc. L.S. 0,520 178 093
0141 White Washer day 0,070 36,300 2,541
0115 Coolie day 0,070 32,900 2,303
9999 Sundries L.S. 2,730 178 486
13.18 Neat cement punning
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0367 LABOUR: tonne 0,022 630,000 13,860
Portland Cement
2209 Carriage of cement tonne 0,022 9,465 208
0155 Mason (average) day 0,270 41,700 11,259
0115 Coolie day 0,270 32,900 8,883
9999 Scaffolding and sundries. L.S. 8,060 178 1,435
TOTAL 35,645
Add Water Charges @ 1% 356
TOTAL 36,001
Add CPOH @ 15% 5,400
Cost of 10 sqm 41,401
Cost of 1 sqm 4,140
Say 4,140
13.19 Rough cast plaster upto 10 m height above ground level with a mixture of sand and gravel or crushed
stone from 6 mm to 10 mm nominal size, dashed over and including the fresh plaster in two layers, under layer 12 mm cement plast
13.19.1 Ordinary cement finish using ordinary cement

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
39 Under layer 12 mm thick cement plaster with cement mortar 1:4 (1 cum 0,144 417,205 60,078
cement : 4 coarse sand)
Rate as per Item Number 3.9 of SH: Mortars
0155 Mason (average) day 0,670 41,700 27,939
0115 Coolie day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 9.880 1.78 17.59
3.3 Top layer 10 mm thick cement plaster with cement mortar 1:3 (1 cum 0.120 4468.35 536.20
cement : 3 fine sand)
Rate as per Item Number 3.3 of SH: Mortars
0155 Mason (average) day 0,610 41,700 25,437
0114 Beldar day 0,690 32,900 22,701
0101 Bhisti day 0,850 36,300 30,855
9999 Scaffolding and sundries. L.S. 9,880 178 1,759
1179 Crushed stone 2.36 mm to 12.5 mm size cum 0,100 110,000 11,000
0101 Bhisti day 0,010 36,300 363
0777 Dry hydrated lime (factory made) quintal 0,090 23,000 2,070
9999 Carriage of lime L.S. 3,640 178 648
0155 Mason (average) day 0,500 41,700 20,850
0114 Beldar day 0,500 32,900 16,450
0101 Bhisti day 0,100 36,300 3,630
9999 Scaffolding and sundries. L.S. 9,880 178 1,759
0123 Mason (brick layer) 1 st class day 0,250 43,500 10,875
0114 Beldar day 0,250 32,900 8,225
TOTAL 358,089
Add Water Charges @ 1% 3,581
TOTAL 361,670
Add CPOH @ 15% 54,250
Cost of 10 sqm 415,920
Cost of 1 sqm 41,592
Say 41,590
13.20 Pebble dash plaster upto 10 m height above ground level with a mixture of washed pebble or crushed
stone 6 mm to 12.5 mm nominal size, dashed over and including fresh plaster in two layers under layer 12 mm cement plaster 1:4 (1

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Under layer 12mm thick cement plaster Under layer 12 mm thick
cement plaster
with cement mortar 1:4 (1 cement : 4 coarse sand) Rate as per
39 Item Number 3.9 of SH: Mortars cum 0,144 417,205 60,078
0155 LABOUR: day 0,670 41,700 27,939
Mason (average)
0114 Beldar day 0,750 32,900 24,675
0101 Bhisti day 0,920 36,300 33,396
9999 Scaffolding and sundries. L.S. 9.880 1.78 17.59
3.3 Top layer 10mm thick cement plaster cum 0.120 4468.35 536.20
Top layer 10 mm thick cement plaster with cement mortar 1:3 (1
cement : 3 fine sand)
Rate as per Item Number 3.3 of SH: Mortars
0155 Mason (average) day 0,610 41,700 25,437
0114 Beldar day 0,690 32,900 22,701
0101 Bhisti day 0,850 36,300 30,855
9999 Scaffolding and sundries. L.S. 9,880 178 1,759
1179 Crushed stone 2.36 mm to 12.5 mm size cum 0,100 110,000 11,000
0101 Bhisti day 0,010 36,300 363
0777 Dry hydrated lime (factory made) quintal 0,090 23,000 2,070
9999 Carriage of lime L.S. 3,640 178 648
0155 Mason (average) day 0,500 41,700 20,850
0114 Beldar day 0,500 32,900 16,450
0101 Bhisti day 0,100 36,300 3,630
9999 Scaffolding and sundries. L.S. 9,880 178 1,759
9999 Scaffolding and sundries. L.S. 4,420 178 787
TOTAL 339,776
Add Water Charges @ 1% 3,398
TOTAL 343,174
Add CPOH @ 15% 51,476
Cost of 10 sqm 394,650
Cost of 1 sqm 39,465
Say 39,465
13.21 Extra for providing and mixing water proofing material in cement plaster work in proportion recommended
by the manufacturers.
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 12 mm cement plaster
1:3 (1 cement:3 sand) = 10 sqm or 1.48
bags of cement used in the mix
Cement required for 10 sqm = 73.89 kg
Water proofing material required @ 1 kg per
50 kg of cement = 1.48 kg
1213 Water proofing materials kilogram 1.480 35.00 51.80
9999 Sundries L.S. 7.150 1.78 12.73

6,453
065
6,518
978
7,496
5,065
5,065
TOTAL
Water Charges @ 1%
TAL Add CPOH @ 15%
ement used in the mix.
Say
13.22 Extra for plastering exterior walls of height more than 10 m from ground level for every additional height
of 3 m or part thereof.
Code No Description Unit Quantity Rate ` Amount `
9999 Details of cost for 10 sqm L.S. 53,820 178 9,580
Scaffolding and sundries.

LABOUR:
0155 Mason (average) day 0,200 41,700 8,340

0115 Coolie day 0,300 32,900 9,870


0101 Bhisti day 0,100 36,300 3,630
9999 Sundries L.S. 7,150 178 1,273
TOTAL 32,693
Add Water Charges @ 1% 327
TOTAL 33,020
Add CPOH @ 15% 4,953
Cost of 10 sqm 37,973
Cost of 1 sqm 3,797
Say 3,795
13.23 Extra for plastering on circular work not exceeding 6 m in radius.
13.23.1 In one coat
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
LABOUR:
day 0,200 41,700 8,340
0155 Mason (average)

0114 Beldar day 0,200 32,900 6,580


9999 Sundries L.S. 7,150 178 1,273
TOTAL 16,193
Add Water Charges @ 1% 162
TOTAL 16,355
Add CPOH @ 15% 2,453
Cost of 10 sqm 18,808
Cost of 1 sqm 1,881
Say 1,880
13.23.2 In two coats

Code No Description Unit Quantity Rate ` Amount `


Details of cost for 10 sqm
LABOUR:
day 0,300 41,700 12,510
0155 Mason (average)

0114 Beldar day 0,300 32,900 9,870


9999 Sundries L.S. 13,390 178 2,383
TOTAL 24,763
Add Water Charges @ 1% 248
TOTAL 25,011
Add CPOH @ 15% 3,752
Cost of 10 sqm 28,763
Cost of 1 sqm 2,876
Say 2,875
13.24 Extra for plastering done on moulding cornices or architraves including neat finish to line and level:
13.24.1 In one coat
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
LABOUR: day 3,000 41,700 125,100
0155 Mason (average)

0114 Beldar day 2,000 32,900 65,800


0115 Coolie day 1,000 32,900 32,900
0101 Bhisti day 0,250 36,300 9,075
9999 Sundries L.S. 13,390 178 2,383
TOTAL 235,258
Add Water Charges @ 1% 2,353
TOTAL 237,611
Add CPOH @ 15% 35,642
Cost of 10 sqm 273,253
Cost of 1 sqm 27,325
Say 27,325
13.24.2 In two coats

Code No Description Unit Quantity Rate ` Amount `


Details of cost for 10 sqm
LABOUR: day 5,000 41,700 208,500
0155 Mason (average)

0114 Beldar day 3,000 32,900 98,700


0115 Coolie day 2,000 32,900 65,800
0101 Bhisti day 0,330 36,300 11,979
9999 Sundries L.S. 13,390 178 2,383
TOTAL 387,362
Add Water Charges @ 1% 3,874
TOTAL 391,236
Add CPOH @ 15% 58,685
Cost of 10 sqm 449,921
Cost of 1 sqm 44,992
Say 44,990
13.25 Extra for plastering :

13.25.1 Spherical ceiling


Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
LABOUR: day 0,750 41,700 31,275
0155 Mason (average)

0114 Beldar day 0,740 32,900 24,346


9999 Sundries L.S. 26,910 178 4,790
TOTAL 60,411
Add Water Charges @ 1% 604
TOTAL 61,015
Add CPOH @ 15% 9,152
Cost of 10 sqm 70,167
Cost of 1 sqm 7,017
Say 7,015
13.25.2 Groined ceiling
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0155 LABOUR: day 0,800 41,700 33,360
Mason (average)
0114 Beldar day 0,800 32,900 26,320
9999 Sundries L.S. 34,060 178 6,063
TOTAL 65,743
Add Water Charges @ 1% 657
TOTAL 66,400
Add CPOH @ 15% 9,960
Cost of 10 sqm 76,360
Cost of 1 sqm 7,636
Say 7,635
13.25 Extra for plastering :
13.25.3 Flewing soffits

Code No Description Unit Quantity


Details of cost for 10 sqm

LABOUR:

0155 Mason (average) day 0.500 417.00 208.50

0114 Beldar day 0.500 329.00 164.50

9999 Sundries L.S. 13.390 1.78 23.83

TOTAL 396.83

Add Water Charges @ 1% 3.97

TOTAL 400.80

Add CPOH @ 15% 60.12

m 460.92

46.09

Say 46.10

13.26 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the
surface even and smooth complete.

Code No Description Unit Quantity


Details of cost for 10sqm
MATERIAL:
Plaster of paris
10x0.002 x 1121 = 22.42kg
Add 2% wastage= 0.45kg Total = 22.87kg
Say 23 kg Plaster of Paris

0869 kilogram 23,000 450 10,350


9999 Carriage of plaster of paris LABOUR: L.S. 3.900 1.78 6.94
0122 Mason (for plaster of paris work) 1 st class day 0.910 435.00 395.85

0114 Beldar day 0,910 32,900 29,939


9999 Scaffolding and sundries. L.S. 83,980 178 14,948
TOTAL 95,516
Add Water Charges @ 1% 955
TOTAL 96,471
Add CPOH @ 15% 14,471
Cost of 10 sqm 110,942
Cost of 1 sqm 11,094
Say 11,095
13.27 Extra for lining out plaster to imitate stone or concrete blocks walling.
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0155 LABOUR: day 0,500 41,700 20,850
Mason (average)
0114 Beldar day 0,500 32,900 16,450
9999 Solution of lime putty L.S. 1,820 178 324
TOTAL 37,624
Add Water Charges @ 1% 376
TOTAL 38,000
Add CPOH @ 15% 5,700
Cost of 10 sqm 43,700
Cost of 1 sqm 4,370
Say 4,370
13.28 12 mm thick plain cement mortar bands in cement mortar 1:4 (1 cement : 4 fine sand) :
13.28.1 Flush Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
34 Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item cum 0,014 363,705 5,092
Number 3.4 of SH: Mortars

LABOUR:
0155 day 0,270 41,700 11,259
Mason (average)
0115 Coolie day 0,270 32,900 8,883
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 1,430 178 255
TOTAL 27,304
Add Water Charges @ 1% 273
TOTAL 27,577
Add CPOH @ 15% 4,137
Cost of 10 metre long and 10cm wide band 31,714
Cost of 1 cm per metre 317
Say 315
13.28.2 Sunk Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
34 Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item cum 0,014 363,705 5,092
Number 3.4 of SH: Mortars

LABOUR:
0155 day 0,300 41,700 12,510
Mason (average)
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 2,080 178 370
TOTAL 29,657
Add Water Charges @ 1% 297
TOTAL 29,954
Add CPOH @ 15% 4,493
Cost of 10 metre long and 10cm wide band 34,447
Cost of 1 cm per metre 344
Say 345
13.28.3 Raised Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item
Number 3.4 of SH: Mortars
34 cum 0,014 363,705 5,092
0155 LABOUR: day 0,350 41,700 14,595
Mason (average)
0115 Coolie day 0,350 32,900 11,515
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 2,730 178 486
TOTAL 33,503
Add Water Charges @ 1% 335
TOTAL 33,838
Add CPOH @ 15% 5,076
Cost of 10 metre long and 10cm wide band 38,914
Cost of 1 cm per metre 389
Say 390
13.28.4 Moulded Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item
34 Number 3.4 of SH: Mortars cum 0,014 363,705 5,092
0155 LABOUR: day 0,650 41,700 27,105
Mason (average)
0115 Coolie day 0,650 32,900 21,385
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 1,560 178 278
TOTAL 55,675
Add Water Charges @ 1% 557
TOTAL 56,232
Add CPOH @ 15% 8,435
Cost of 10 metre long and 10cm wide band 64,667
Cost of 1 cm per metre 647
Say 645
13.29 18 mm thick plain cement mortar band in cement mortar 1:4 (1 cement : 4 fine sand):
13.29.1 Flush Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item
34 Number 3.4 of SH: Mortars cum 0,020 363,705 7,274
0155 LABOUR: day 0,320 41,700 13,344
Mason (average)
0115 Coolie day 0,320 32,900 10,528
0101 Bhisti day 0,060 36,300 2,178
9999 Sundries L.S. 2,080 178 370
TOTAL 33,694
Add Water Charges @ 1% 337
TOTAL 34,031
Add CPOH @ 15% 5,105
Cost of 10 metre long and 10cm wide band 39,136
Cost of 1 cm per metre 391
Say 390
13.29.2 Sunk Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
34 Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item cum 0,020 363,705 7,274
Number 3.4 of SH: Mortars

0155 LABOUR: day 0,360 41,700 15,012


Mason (average)
0115 Coolie day 0,360 32,900 11,844
0101 Bhisti day 0,060 36,300 2,178
9999 Sundries L.S. 2,730 178 486
TOTAL 36,794
Add Water Charges @ 1% 368
TOTAL 37,162
Add CPOH @ 15% 5,574
Cost of 10 metre long and 10cm wide band 42,736
Cost of 1 cm per metre 427
Say 425
13.29.3 Raised Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
34 Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item cum 0,020 363,705 7,274
Number 3.4 of SH: Mortars

0155 LABOUR: day 0,420 41,700 17,514


Mason (average)
0115 Coolie day 0,420 32,900 13,818
0101 Bhisti day 0,060 36,300 2,178
9999 Sundries L.S. 4,420 178 787
TOTAL 41,571
Add Water Charges @ 1% 416
TOTAL 41,987
Add CPOH @ 15% 6,298
Cost of 10 metre long and 10cm wide band 48,285
Cost of 1 cm per metre 483
Say 485
13.29.4 Moulded Band

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
34 Cement mortar 1:4 (1 cement : 4 fine sand) Rate as per Item cum 0,024 363,705 8,729
Number 3.4 of SH: Mortars
0155 LABOUR: day 0,860 41,700 35,862
Mason (average)
0115 Coolie day 0,860 32,900 28,294
0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 2,730 178 486
TOTAL 75,186
Add Water Charges @ 1% 752
TOTAL 75,938
Add CPOH @ 15% 11,391
Cost of 10 metre long and 10cm wide band 87,329
Cost of 1 cm per metre 873
Say 875
13.30 18 mm thick moulded cement mortar band in two coats under layer 12 mm thick with cement mortar 1:5
(1 cement : 5 coarse sand) top layer 6mm thick with cement mortar 1:4 (1 cement : 4 fine sand).

Code No Description Unit Quantity


Details of cost for 10 metre long and 10cm wide band
MATERIAL:
Cement mortar 1:5 (1 cement : 5 coarse sand) Rate as per Item
310 cum 0,014 372,440 5,214
Number 3.10 of SH: Mortars
Cement mortar 1:4 (1 cement : 4 fine sand)
3.4 Rate as per Item Number 3.4 of SH: Mortars LABOUR: cum 0.010 3637.05 36.37
0155 Mason (average) day 0.860 417.00 358.62

0115 Coolie day 0,860 32,900 28,294


0101 Bhisti day 0,050 36,300 1,815
9999 Sundries L.S. 2,730 178 486
TOTAL 75,308
Add Water Charges @ 1% 753
TOTAL 76,061
Add CPOH @ 15% 11,409
Cost of 10 metre long and 10cm wide band 87,470
Cost of 1 cm per metre 875
Say 875
13.31 Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand) :
13.31.1 Flush / Ruled / Struck or weathered pointing
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
33 Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item cum 0,030 446,835 13,405
Number 3.3 of SH: Mortars

LABOUR:
0155 day 0,500 41,700 20,850
Mason (average)
0115 Coolie day 0,600 32,900 19,740
0101 Bhisti day 0,930 36,300 33,759
9999 Sundries L.S. 7,150 178 1,273
9999 Scaffolding and racking out joints including sundries L.S. 14,300 178 2,545
TOTAL 91,572
Add Water Charges @ 1% 916
TOTAL 92,488
Add CPOH @ 15% 13,873
Cost of 10 sqm 106,361
Cost of 1 sqm 10,636
Say 10,635
13.31.2 Raised and cut pointing

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item
33 cum 0,046 446,835 20,554
Number 3.3 of SH: Mortars
LABOUR:
0155 day 1,070 41,700 44,619
Mason (average)
0115 Coolie day 1,310 32,900 43,099
0101 Bhisti day 1,000 36,300 36,300
9999 Sundries L.S. 7,150 178 1,273
Code No Description Unit Quantity Rate ` Amount `
9999 Scaffolding and racking out joints including sundries L.S. 16,120 178 2,869

TOTAL 148,714
Add Water Charges @ 1% 1,487
TOTAL 150,201
Add CPOH @ 15% 22,530
Cost of 10 sqm 172,731
Cost of 1 sqm 17,273
Say 17,275
13.32 Pointing on tile brick work with cement mortar 1:3 (1 cement :3 fine sand):
13.32.1 Flush / Ruled / Struck or weathered pointing
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item
33 cum 0,046 446,835 20,554
Number 3.3 of SH: Mortars
9999 Sundries LABOUR: L.S. 7,150 178 1,273

0155 Mason (average) day 0,670 41,700 27,939


0115 Coolie day 0,800 32,900 26,320
0101 Bhisti day 1,280 36,300 46,464
9999 Scaffolding and racking out joints including sundries L.S. 16,120 178 2,869
TOTAL 125,419
Add Water Charges @ 1% 1,254
TOTAL 126,673
Add CPOH @ 15% 19,001
Cost of 10 sqm 145,674
Cost of 1 sqm 14,567
Say 14,565
13.33 Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :
13.33.1 Flush / Ruled pointing
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:3 (1 cement : 3 fine sand)
33 Rate as per Item Number 3.3 of SH: Mortars cum 0,023 446,835 10,277
9999 Sundries L.S. 7,150 178 1,273
LABOUR:
0155 day 0,920 41,700 38,364
Mason (average)
0115 Coolie day 1,370 32,900 45,073
0101 Bhisti day 0,930 36,300 33,759
9999 Scaffolding and racking out joints including sundries L.S. 16,120 178 2,869
TOTAL 131,615
Add Water Charges @ 1% 1,316
TOTAL 132,931
Add CPOH @ 15% 19,940
Cost of 10 sqm 152,871
Cost of 1 sqm 15,287
Say 15,285
13.33.2 Raised and cut pointing
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
33 Cement mortar 1:3 (1 cement : 3 fine sand) Rate as per Item cum 0,038 446,835 16,980
Number 3.3 of SH: Mortars

9999 Sundries LABOUR: L.S. 7.150 1.78 12.73


0155 Mason (average) day 2.000 417.00 834.00

0115 Coolie day 2,960 32,900 97,384


0101 Bhisti day 1,000 36,300 36,300
9999 Scaffolding and racking out joints including sundries L.S. 16,120 178 2,869
TOTAL 238,206
Add Water Charges @ 1% 2,382
TOTAL 240,588
Add CPOH @ 15% 36,088
Cost of 10 sqm 276,676
Cost of 1 sqm 27,668
Say 27,670
13.34 Raised and cut pointing on stone work in white cement mortar 1:3 (1 white cement : 3 marble dust)

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
White cement mortar 1:3 (1 white cement : 3 marble dust)
Rate as per Item Number 3.16 of SH: Mortars

316 cum 0,038 871,635 33,122


9999 Sundries LABOUR: L.S. 7.150 1.78 12.73
0155 Mason (average) day 2.000 417.00 834.00

0115 Coolie day 2,960 32,900 97,384


0101 Bhisti day 1,000 36,300 36,300
9999 Scaffolding and racking out joints including sundries
L.S. 16,120 178 2,869

TOTAL 254,348
Add Water Charges @ 1% 2,543
TOTAL 256,891
Add CPOH @ 15% 38,534
Cost of 10 sqm 295,425
Cost of 1 sqm 29,543
Say 29,540
13.35 Pointing on stone slab ceiling with cement mortar 1:2 (1 cement : 2 fine sand):
13.35.1 Flush / Ruled pointing

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
Cement mortar 1:2 (1 cement : 2 fine sand)
32 Rate as per Item Number 3.2 of SH: Mortars cum 0,015 545,865 8,188
LABOUR:
0155 Mason (average) day 0,470 41,700 19,599
0115 Coolie day 0,690 32,900 22,701
0101 Bhisti day 0,590 36,300 21,417
Code No Description Unit Quantity Rate ` Amount `
9999 Scaffolding and racking out joints i ncluding L.S. 16,120 178 2,869
TOTAL 74,774
Add Water Charges @ 1% 748
TOTAL Add CPOH @ 15%
Cost of 10 sqm Cost of 1 sqm
Say
TOTAL
Add Water Charges @ 1%
TOTAL Add CPOH @ 15% 75,522
Cost of 10 sqm Cost of 1 sqm 11,328
Say 86,850
8,685
8,685
13.36 Extra for pointing on walls on the outside at height more than 10 m from ground level for every additional
height of 3 m or part there of.

Code No Description Unit Quantity


Details of cost for 10 sqm

LABOUR:

9999 Scaffolding L.S. 13.390 1.78 23.83

9999 Sundries L.S. 13.390 1.78 23.83

TOTAL 47.66

Add Water Charges @ 1% 0.48

TOTAL 48.14

Add CPOH @ 15% 7.22

m 55.36

5.54

Say 5.55

13.37 White washing with lime to give an even shade:


13.37.1 New work (three or more coats)
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0775 MATERIAL: quintal 0,030 65,000 1,950
Dehradun white lime
9999 Carriage of lime L.S. 0.910 1.78 1.62
0141 LABOUR: day 0.200 363.00 72.60
White Washer
0115 Coolie day 0,100 32,900 3,290
9999 Indigo gum etc. L.S. 4,420 178 787
9999 Sundries ladders etc. L.S. 2,730 178 486
TOTAL 13,935
Add Water Charges @ 1% 139
TOTAL 14,074
Add CPOH @ 15% 2,111
Cost of 10 sqm 16,185
Cost of 1 sqm 1,619
Say 1,620
13.38 Satna lime wash on walls with one coat

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
0776 Satna lime quintal 0,010 50,000 500
9999 Carriage of lime L.S. 2,080 178 370
9999 Indigo gum etc. L.S. 0,520 178 093
LABOUR:
0141 White Washer day 0,080 36,300 2,904
Code No Description Unit Quantity Rate ` Amount `
0115 Coolie day 0,040 32,900 1,316
9999 Sundries ladders etc. L.S. 2,730 178 486
TOTAL 5,669
Add Water Charges @ 1% 057
TOTAL 5,726
Add CPOH @ 15% 859
Cost of 10 sqm 6,585
Cost of 1 sqm 659
Say 660
13.39 Colour washing such as green, blue or buff to give an even shade:
13.39.1 New work (two or more coats) with a base coat of white washing with lime
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
0775 quintal 0,030 65,000 1,950
Dehradun white lime
9999 Carriage of lime L.S. 8,060 178 1,435
9999 Add for colouring stuff L.S. 0,910 178 162
LABOUR:
0141 day 0,300 36,300 10,890
White Washer
0115 Coolie day 0,100 32,900 3,290
9999 Indigo gum etc. L.S. 4,420 178 787
9999 Sundries ladders etc. L.S. 2,730 178 486
TOTAL 19,000
Add Water Charges @ 1% 190
TOTAL 19,190
Add CPOH @ 15% 2,878
Cost of 10 sqm 22,068
Cost of 1 sqm 2,207
Say 2,205
13.39.2 New work (two or more coats) with a base coat of whiting

Code No Description Unit Quantity Rate ` Amount `


Details of cost for 10 sqm
MATERIAL:
0775 quintal 0,030 65,000 1,950
Dehradun white lime
9999 Carriage of lime L.S. 8,060 178 1,435
9999 Add for colouring stuff L.S. 0,910 178 162
LABOUR:
0141 day 0,300 36,300 10,890
White Washer
0115 Coolie day 0,100 32,900 3,290
9999 Indigo gum etc. L.S. 2,730 178 486
9999 Sundries ladders etc. L.S. 2,730 178 486
TOTAL 18,699
Add Water Charges @ 1% 187
TOTAL 18,886
Add CPOH @ 15% 2,833
Cost of 10 sqm 21,719
Cost of 1 sqm 2,172
Say 2,170
13.40 Distempering with dry distemper of approved brand and manufacture (two or more coats) of required
including water thinnable priming coat to give an even shade :

Code No Description Unit Quantity


Details of cost for 10 sqm
0808 MATERIAL:
Water thinnable cement primer for interior wall surface,
having VOC content less than 50 grams/ litre litre 0,700 8,000 5,600
9999 Putty, glue etc. L.S. 2,730 178 486
0815 Dry distemper kilogram 1,500 3,600 5,400
9999 Carriage of material L.S. 1,560 178 278
9999 Brushes, sand paper etc. L.S. 7.150 1.78 12.73
0131 LABOUR: day 0.800 399.00 319.20
Painter
0115 Coolie day 0,400 32,900 13,160
9999 Sundries L.S. 5,330 178 949
TOTAL 59,066
Add Water Charges @ 1% 591
TOTAL 59,657
Add CPOH @ 15% 8,949
Cost of 10 sqm 68,606
Cost of 1 sqm 6,861
Say 6,860
13.41 Distempering with oil bound washable distemper of approved brand and manufacture to give an even
shade :

13.41.1 New work (two or more coats) over and including priming coat with water thinnable cement primer Code No De
Details of cost for 10 sqm
0808 MATERIAL:
Water thinnable cement primer for interior wall surface,
having VOC content less than 50 grams/ litre litre 0,700 8,000 5,600
9999 Brushes, putty etc. L.S. 7,150 178 1,273
9999 Sundries including carriage L.S. 8,060 178 1,435
0816 Oil bound washable distemper/ Acrylic distemper kilogram 1,500 5,500 8,250
9999 Carriage of material L.S. 4,420 178 787
9999 Brushes, sand paper and putty for filling holes L.S. 11.700 1.78 20.83
0131 LABOUR: day 1.000 399.00 399.00
Painter
0115 Coolie day 0,500 32,900 16,450
9999 Sundries L.S. 8,060 178 1,435
TOTAL 77,213
Add Water Charges @ 1% 772
TOTAL 77,985
Add CPOH @ 15% 11,698
Cost of 10 sqm 89,683
Cost of 1 sqm 8,968
Say 8,970
13.42 Distempering with 1st quality acrylic washable distemper (ready mixed) of approved manufacturer, of
required shade and colour complete as per manufacturers specification.
13.42.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm

MATERIAL:

0816 Oil bound washable distemper/ Acrylic distemper kilogram 1.500 55.00 82.50

Code No Description Unit Quantity


9999 Carriage of material L.S. 4,420 178 787
9999 Brushes, sand paper and putty for filling holes L.S. 11.570 1.78 20.59
0131 LABOUR: day 0.400 399.00 159.60
Painter
0114 Beldar day 0,460 32,900 15,134
9999 Sundries L.S. 8,060 178 1,435
TOTAL 43,625
Add Water Charges @ 1% 436
TOTAL 44,061
Add CPOH @ 15% 6,609
Cost of 10 sqm 50,670
Cost of 1 sqm 5,067
Say 5,065
13.43 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:
13.43.1 Water thinnable cement primer

Code No Description Unit Quantity


Details of cost for 10sqm
0808 MATERIAL:
Water thinnable cement primer for interior wall surface,
having VOC content less than 50 grams/ litre litre 0,700 8,000 5,600
9999 Brushes, putty etc. L.S. 7.150 1.78 12.73
0131 LABOUR: day 0.400 399.00 159.60
Painter
0115 Coolie day 0,200 32,900 6,580
9999 Sundries includingcarriage L.S. 8,060 178 1,435
TOTAL 30,848
Add Water Charges @ 1% 308
TOTAL 31,156
Add CPOH @ 15% 4,673
Cost of 10 sqm 35,829
Cost of 1 sqm 3,583
Say 3,585
13.44 Finishing walls with water proofing cement paint of required shade:
13.44.1 New work (Two or more coats applied @ 3.84 kg/ 10 sqm)

Code No Description Unit Quantity


Details of cost for 10 sqm
0851 MATERIAL: kilogram 3,840 4,500 17,280
Water proofing cement paint
9999 Carriage of material L.S. 1.560 1.78 2.78
0131 LABOUR: day 0.460 399.00 183.54
Painter
0115 Coolie day 0,230 32,900 7,567
0101 Bhisti day 0,100 36,300 3,630
9999 Brushes, sand paper etc. L.S. 7,150 178 1,273
9999 Sundries L.S. 8,060 178 1,435
TOTAL 49,817
Add Water Charges @ 1% 498
TOTAL 50,315
Add CPOH @ 15% 7,547
Cost of 10 sqm 57,862
Cost of 1 sqm 5,786
Say 5,785
13.45 Finishing walls with textured exterior paint of required shade :
13.45.1 New work (Two or more coats applied @ 3.28 ltr/ 10 sqm) over and including priming coat of exterior primer applied @ 2.20
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
8507 MATERIAL: litre 3,280 24,000 78,720
Textured exterior paint
0809 Exterior primer kilogram 2,200 4,000 8,800
9999 Carriage of material L.S. 1.560 1.78 2.78
0131 LABOUR: day 0.600 399.00 239.40
Painter
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,020 178 1,250
9999 Sundries L.S. 8,060 178 1,435
TOTAL 126,108
Add Water Charges @ 1% 1,261
TOTAL 127,369
Add CPOH @ 15% 19,105
Cost of 10 sqm 146,474
Cost of 1 sqm 14,647
Say 14,645
13.46 Finishing walls with Acrylic Smooth exterior paint of required shade :
13.46.1 New work (Two or more coat applied @ 1.67 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
8505 MATERIAL: litre 1,670 18,000 30,060
Acrylic exterior paint
0809 Exterior primer kilogram 2,200 4,000 8,800
9999 Carriage of material L.S. 1.560 1.78 2.78
0131 LABOUR: day 0.600 399.00 239.40
Painter
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,150 178 1,273
9999 Sundries L.S. 8,060 178 1,435
TOTAL 77,471
Add Water Charges @ 1% 775
TOTAL 78,246
Add CPOH @ 15% 11,737
Cost of 10 sqm 89,983
Cost of 1 sqm 8,998
Say 9,000
13.47 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:
13.47.1 New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 k

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
8506 Premium Acrylic exterior paint litre 1,430 24,000 34,320
0809 Exterior primer kilogram 2,200 4,000 8,800
9999 Carriage of material L.S. 1,560 178 278
Code No Description Unit Quantity Rate ` Amount `
LABOUR:
0131 Painter day 0,600 39,900 23,940
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,150 178 1,273
9999 Sundries L.S. 8,060 178 1,435
TOTAL 81,731
Add Water Charges @ 1% 817
TOTAL 82,548
Add CPOH @ 15% 12,382
Cost of 10 sqm 94,930
Cost of 1 sqm 9,493
Say 9,495
13.48 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per
manufacturers specifications :
13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sq
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
MATERIAL:
8504 litre 1,250 29,000 36,250
Multi surface paint
8509 Special Primer (C.W.) litre 0,750 15,000 11,250
9999 Carriage of material LABOUR: L.S. 1,560 178 278

0131 Painter day 0,600 39,900 23,940


0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,020 178 1,250
9999 Sundries L.S. 8,060 178 1,435
TOTAL 86,088
Add Water Charges @ 1% 861
TOTAL 86,949
Add CPOH @ 15% 13,042
Cost of 10 sqm 99,991
Cost of 1 sqm 9,999
Say 10,000
13.48.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90

ltr/ 10 sqm over an under coat of primer applied @ 0.75 ltr/ 10 sqm of approved brand and manufacture Code No Descri
Details of cost for 10 sqm
MATERIAL:
8504 Multi surface paint litre 0,900 29,000 26,100
8509 Special Primer (C.W.) litre 0,750 15,000 11,250
9999 Carriage of material L.S. 1,560 178 278
LABOUR:
0131 day 0,600 39,900 23,940
Painter
0115 Coolie day 0,300 32,900 9,870
0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,020 178 1,250
Code No Description Unit Quantity Rate ` Amount `
9999 Sundries L.S. 8,060 178 1,435
TOTAL 75,938
Add Water Charges @ 1% 759
TOTAL 76,697
Add CPOH @ 15% 11,505
Cost of 10 sqm 88,202
Cost of 1 sqm 8,820
Say 8,820
13.48.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @
0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
8504 MATERIAL: litre 0,900 29,000 26,100
Multi surface paint
8510 Metal Primer (U.G.) litre 0,800 16,000 12,800
9999 Carriage of material LABOUR: L.S. 1.560 1.78 2.78
0131 Painter day 0.600 399.00 239.40

0115 Coolie day 0,300 32,900 9,870


0101 Bhisti day 0,050 36,300 1,815
9999 Brushes, sand paper etc. L.S. 7,020 178 1,250
9999 Sundries L.S. 8,060 178 1,435
TOTAL 77,488
Add Water Charges @ 1% 775
TOTAL 78,263
Add CPOH @ 15% 11,739
Cost of 10 sqm 90,002
Cost of 1 sqm 9,000
Say 9,000
13.50 Applying priming coat:
13.50.1 With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood)
Details of cost for 10 sqm
Code No Description Unit Quantity Rate ` Amount `
0823 MATERIAL: litre 0,750 9,000 6,750
Pink primer (for wood)
9999 Putty L.S. 2,730 178 486
9999 Carriage LABOUR: L.S. 0.390 1.78 0.69
0131 Painter day 0.250 399.00 99.75

0115 Coolie day 0,250 32,900 8,225


9999 Brushes, sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 10,790 178 1,921
TOTAL 28,375
Add Water Charges @ 1% 284
TOTAL 28,659
Add CPOH @ 15% 4,299
Cost of 10 sqm 32,958
Cost of 1 sqm 3,296
Say 3,295
13.50.2 With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
4201 MATERIAL: litre 0,750 13,000 9,750
Aluminium primer
9999 Putty L.S. 2,730 178 486
9999 Carriage L.S. 0.390 1.78 0.69
0131 LABOUR: day 0.250 399.00 99.75
Painter
0115 Coolie day 0,250 32,900 8,225
9999 Brushes, sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 10,790 178 1,921
TOTAL 31,375
Add Water Charges @ 1% 314
TOTAL 31,689
Add CPOH @ 15% 4,753
Cost of 10 sqm 36,442
Cost of 1 sqm 3,644
Say 3,645
13.50.3 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised
iron/steel works

Code No Description Unit Quantity


Details of cost for 10 sqm
4202 MATERIAL: litre 0,540 7,000 3,780
Red oxide Zinc chromate primer
9999 Carriage L.S. 0.520 1.78 0.93
0131 LABOUR: day 0.240 399.00 95.76
Painter
0115 Coolie day 0,240 32,900 7,896
9999 Brushes, sand paper including sundries L.S. 10,790 178 1,921
TOTAL 23,266
Add Water Charges @ 1% 233
TOTAL 23,499
Add CPOH @ 15% 3,525
Cost of 10 sqm 27,024
Cost of 1 sqm 2,702
Say 2,700
13.50.4 With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work
(second coat)

Code No Description Unit Quantity


Details of cost for 10 sqm
4202 MATERIAL: litre 0,360 7,000 2,520
Red oxide Zinc chromate primer
9999 Carriage L.S. 0.390 1.78 0.69
0131 LABOUR: day 0.120 399.00 47.88
Painter
0115 Coolie day 0,120 32,900 3,948
9999 Brushes, sand paper including sundries L.S. 7,150 178 1,273
TOTAL 12,598
Add Water Charges @ 1% 126
TOTAL 12,724
Add CPOH @ 15% 1,909
Cost of 10 sqm 14,633
Cost of 1 sqm 1,463
Say 1,465
13.51 Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture
on wet or patchy portion of plastered surfaces:
13.51.1 One coat

Code No Description Unit Quantity


Details of cost for 10 sqm
0801 MATERIAL: litre 1,800 20,000 36,000
Silicon and acrylic emulsion
9999 Carriage of material L.S. 0,520 178 093
9999 Putty etc. L.S. 2.730 1.78 4.86
0131 LABOUR: day 0.270 399.00 107.73
Painter
0115 Coolie day 0,270 32,900 8,883
9999 Brushes, sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 10,790 178 1,921
TOTAL 59,105
Add Water Charges @ 1% 591
TOTAL 59,696
Add CPOH @ 15% 8,954
Cost of 10 sqm 68,650
Cost of 1 sqm 6,865
Say 6,865
13.51.2 Two coats

Code No Description Unit Quantity


Details of cost for 10 sqm
0801 MATERIAL: litre 2,880 20,000 57,600
Silicon and acrylic emulsion
9999 Carriage of material L.S. 0,520 178 093
9999 Putty etc. L.S. 2.730 1.78 4.86
0131 LABOUR: day 0.430 399.00 171.57
Painter
0115 Coolie day 0,430 32,900 14,147
9999 Brushes, sand paper etc. L.S. 8,530 178 1,518
9999 Sundries L.S. 17,260 178 3,072
TOTAL 94,073
Add Water Charges @ 1% 941
TOTAL 95,014
Add CPOH @ 15% 14,252
Cost of 10 sqm 109,266
Cost of 1 sqm 10,927
Say 10,925
13.52 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers
specifications including appropriate priming coat, preparation of surface, etc. complete.
13.52.1 On steel work

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
4202 Red oxide Zinc chromate primer litre 0,750 7,000 5,250
9999 Putty L.S. 2,730 178 486
9999 Carriage L.S. 0,390 178 069
LABOUR:
0131 Painter day 0,250 39,900 9,975
0115 Coolie day 0,250 32,900 8,225
9999 Brushes, sand paper etc. L.S. 5,460 178 972
Code No Description Unit Quantity
9999 Sundries L.S. 10.660 1.78 18.97
7239 EPOXY PAINTING MATERIAL: litre 1.250 250.00 312.50
Epoxy paint

9999 Carriage of material LABOUR: L.S. 1.430 1.78 2.55


0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Putty, brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 100,329
Add Water Charges @ 1% 1,003
TOTAL 101,332
Add CPOH @ 15% 15,200
Cost of 10 sqm 116,532
Cost of 1 sqm 11,653
Say 11,655
13.52.2 On concrete work

Code No Description Unit Quantity


Details of cost for 10 sqm PRIMING COAT MATERIAL:
Distemper primer

0821 litre 0,840 9,000 7,560


9999 Putty L.S. 13,520 178 2,407
9999 Carriage LABOUR: L.S. 0.520 1.78 0.93
0131 Painter day 0.250 399.00 99.75

0115 Coolie day 0,250 32,900 8,225


9999 Brushes, sand paper etc. L.S. 2,730 178 486
9999 Sundries L.S. 8.060 1.78 14.35
7239 EPOXY PAINTING MATERIAL: litre 1.210 250.00 302.50
Epoxy paint

9999 Materials for filling in holes and cracks L.S. 6,760 178 1,203
9999 Carriage of material LABOUR: L.S. 1.430 1.78 2.55
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Putty, brushes, sand paper etc. L.S. 10,790 178 1,921
9999 Sundries L.S. 6,760 178 1,203
TOTAL 104,325
Add Water Charges @ 1% 1,043
TOTAL 105,368
Add CPOH @ 15% 15,805
Cost of 10 sqm 121,173
Cost of 1 sqm 12,117
Say 12,115
13.53 Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour
to give an even shade:
13.53.1 New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution.

Code No Description Unit Quantity


Details of cost for 10 sqm
PRIMING COAT
MATERIAL:
4202 Red oxide Zinc chromate primer litre 0,360 7,000 2,520
9999 Carriage L.S. 0,390 178 069
LABOUR:
0131 day 0,120 39,900 4,788
Painter
0114 Beldar day 0,120 32,900 3,948
9999 Brushes, sand paper etc. L.S. 7,150 178 1,273
EPOXY PAINTING MATERIAL:

0834 Synthetic enamel paint in all shades except black or chocolate


litre 0,800 16,000 12,800
shade
9999 Carriage LABOUR: L.S. 1,430 178 255

0131 Painter day 0,540 39,900 21,546


0115 Coolie day 0,540 32,900 17,766
9999 Putty, brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 67,603
Add Water Charges @ 1% 676
TOTAL 68,279
Add CPOH @ 15% 10,242
Cost of 10 sqm 78,521
Cost of 1 sqm 7,852
Say 7,850
13.54 Applying a coat of mordant solution on G.S. sheet:
13.54.1 With a solution of 38 gms of copper acetate in a litre of soft water
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 25 sqm
MATERIAL:
4203 kilogram 0,038 30,000 1,140
Copper acetate
9999 Soft water L.S. 1,820 178 324
9999 Carriage L.S. 0,910 178 162
LABOUR:
0131 day 0,600 39,900 23,940
Painter
0115 Coolie day 0,600 32,900 19,740
9999 Brushes, sand paper etc. L.S. 35,880 178 6,387
9999 Sundries L.S. 35,880 178 6,387
TOTAL 58,080
Add Water Charges @ 1% 581
TOTAL 58,661
Add CPOH @ 15% 8,799
Cost of 25 sqm 67,460
Cost of 1 sqm 2,698
Say 2,700
13.54.2 With a solution made of 13 gms of hydrochloric acid in a solution of 13 gms each of copper chloride,
copper nitrate and ammonium chloride dissolved in a litre of soft water
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 25 sqm
4204 MATERIAL: kilogram 0,013 3,500 045
Hydrochloric acid
4205 Copper chloride kilogram 0,013 30,000 390
4206 Copper nitrate kilogram 0,013 22,000 286
4207 Ammonium chloride kilogram 0,013 2,000 026
9999 Soft water L.S. 1,820 178 324
9999 Carriage LABOUR: L.S. 0.910 1.78 1.62
0131 Painter day 0.600 399.00 239.40

0115 Coolie day 0,600 32,900 19,740


9999 Brushes, sand paper etc. L.S. 35,880 178 6,387
9999 Sundries L.S. 35,880 178 6,387
TOTAL 57,687
Add Water Charges @ 1% 577
TOTAL 58,264
Add CPOH @ 15% 8,740
Cost of 25 sqm 67,004
Cost of 1 sqm 2,680
Say 2,680
13.55 Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings with black anticorrosive
bitumastic paint of approved brand and manufacture, over and including a priming of ready mixed zinc chromate yellow primer on n
13.55.1 100 mm diameter pipes

Code No Description Unit Quantity


Area=22/7x106.4mm x30m=10.032sqm MATERIAL:
4202 Red oxide Zinc chromate primer litre 0,540 7,000 3,780

9999 Carriage LABOUR: L.S. 0.520 1.78 0.93


0131 Painter day 0.240 399.00 95.76

0115 Coolie day 0,240 32,900 7,896


9999 Brushes, sand paper etc. MATERIAL: L.S. 10.790 1.78 19.21
0828 Anticorrosive bituminous paint (black) litre 0.950 115.00 109.25

9999 Carriage LABOUR: L.S. 1.430 1.78 2.55


0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Putty , sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 8,060 178 1,435
9999 Wire brushes for cleaning L.S. 5,330 178 949
9999 Extra for delays L.S. 61,100 178 10,876
TOTAL 87,967
Add Water Charges @ 1% 880
TOTAL 88,847
Add CPOH @ 15% 13,327
Cost of 30 metre 102,174
Cost of 1 metre 3,406
Say 3,405
13.55.2 150 mm diameter pipes

Code No Description Unit Quantity


Details of cost for 30 mtrs
Area =22/7 x 0.15720 x 30 m = 14.82 MATERIAL:
4202 Red oxide Zinc chromate primer litre 0,800 7,000 5,600
LABOUR:
0131 day 0,360 39,900 14,364
Painter
0115 Coolie day 0,360 32,900 11,844
9999 Brushes, sand paper etc. L.S. 15,990 178 2,846
9999 Carriage MATERIAL: L.S. 0.910 1.78 1.62
0828 Anticorrosive bituminous paint (black) litre 1.410 115.00 162.15

9999 Carriage LABOUR: L.S. 2.080 1.78 3.70


0131 Painter day 0.800 399.00 319.20

0115 Coolie day 0,800 32,900 26,320


9999 Putty , sand paper etc. L.S. 8,600 178 1,531
9999 Sundries L.S. 11,960 178 2,129
9999 Wire brushes for cleaning L.S. 7,150 178 1,273
9999 extra for delays L.S. 94,120 178 16,753
TOTAL 131,327
Add Water Charges @ 1% 1,313
TOTAL 132,640
Add CPOH @ 15% 19,896
Cost of 30 metre 152,536
Cost of 1 metre 5,085
Say 5,085
13.56 Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings with synthetic enamel
paint of approved brand and manufacture and required colour over a priming coat of approved steel primer on new work.
13.56.1 100 mm diameter pipes

Code No Description Unit Quantity


Details of cost for 30 mtrs
Area=22/7 x 106.40/1000 x 30 m = 10.032
MATERIAL:
4202 Red oxide Zinc chromate primer litre 0,540 7,000 3,780
9999 Carriage L.S. 0,520 178 093
LABOUR:
0131 Painter day 0,240 39,900 9,576
0115 Coolie day 0,240 32,900 7,896
9999 Sundries L.S. 10,790 178 1,921
MATERIAL:
0833 Synthetic enamel paint in black or chocolate shade litre 1,160 18,000 20,880
9999 Carriage L.S. 1,430 178 255
9999 Putty , sand paper etc. L.S. 5,330 178 949
LABOUR:
0131 Painter day 0,540 39,900 21,546
0115 Coolie day 0,540 32,900 17,766
9999 Sundries L.S. 6,760 178 1,203
9999 Wire brushes for cleaning L.S. 11,960 178 2,129

Code No Description Unit Quantity


9999 extra for delays L.S. 66.430 1.78 118.25

TOTAL 998.19

Add Water Charges @ 1% 9.98

TOTAL 1008.17

5% 151.23

e 1159.40

e 38.65
Say 38.65

13.56.2 150 mm diameter pipes

Code No Description Unit Quantity


Details of cost for 30 mtrs
Area = 22/7 x157.2mm x30m =14.82sqm MATERIAL:
Red oxide Zinc chromate primer
4202 litre 0,800 7,000 5,600
9999 Carriage L.S. 0.650 1.78 1.16
0131 LABOUR: day 0.360 399.00 143.64
Painter
0115 Coolie day 0,360 32,900 11,844
9999 Sundries L.S. 15.990 1.78 28.46
0833 MATERIAL: litre 1.720 180.00 309.60
Synthetic enamel paint in black or chocolate shade
9999 Carriage L.S. 2,080 178 370
9999 Putty , sand paper etc. L.S. 7.930 1.78 14.12
0131 LABOUR: day 0.800 399.00 319.20
Painter
0115 Coolie day 0,800 32,900 26,320
9999 Sundries L.S. 10,010 178 1,782
9999 Wire brushes for cleaning L.S. 17,810 178 3,170
9999 extra for delays L.S. 101,400 178 18,049
TOTAL 148,753
Add Water Charges @ 1% 1,488
TOTAL 150,241
Add CPOH @ 15% 22,536
Cost of 30 metre 172,777
Cost of 1 metre 5,759
Say 5,760
13.57 Painting with oil type wood preservative of approved brand and manufacture:
13.57.1 New work (two or more coats)
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0859 MATERIAL: litre 1,000 15,000 15,000
Oil type wood preservative
9999 Carriage of material L.S. 0.520 1.78 0.93
0131 LABOUR: day 0.150 399.00 59.85
Painter
0115 Coolie day 0,150 32,900 4,935
9999 Brushes etc. L.S. 4,160 178 740
9999 Sundries L.S. 3,900 178 694
TOTAL 27,447
Add Water Charges @ 1% 274
TOTAL 27,721
Add CPOH @ 15% 4,158
Cost of 10 sqm 31,879
Cost of 1 sqm 3,188
Say 3,190
13.58 Providing and applying two coats of fire retardant paint on cleaned wood/ply surface @ 3.5 sqm per litre
per coat including preparation of base surface as per recommendations of manufacturer to make the surface fire retardant.

Code No Description Unit Quantity


Details of cost for 10 sqm
7240 MATERIAL: litre 5,700 30,000 171,000
Fire retardant paint
9999 Carriage of material LABOUR: L.S. 1.430 1.78 2.55
0131 Painter day 0.540 399.00 215.46

0114 Beldar day 0,540 32,900 17,766


9999 Putty , brushes sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 213,205
Add Water Charges @ 1% 2,132
TOTAL 215,337
Add CPOH @ 15% 32,301
Cost of 10 sqm 247,638
Cost of 1 sqm 24,764
Say 24,765
13.59 Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and
second coat respectively.
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
9999 MATERIAL: L.S. 1,430 178 255
Lime
0324 Coal Tar litre 2,800 3,000 8,400
9999 Carriage of material L.S. 1,430 178 255
0771 Kerosene oil LABOUR: litre 0.500 48.00 24.00
0114 Beldar day 0.430 329.00 141.47

9999 Brushes etc. L.S. 5,330 178 949


9999 Sundries L.S. 5,330 178 949
TOTAL 27,355
Add Water Charges @ 1% 274
TOTAL 27,629
Add CPOH @ 15% 4,144
Cost of 10 sqm 31,773
Cost of 1 sqm 3,177
Say 3,175
13.60 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:
13.60.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
0835 Plastic emulsion paint litre 1,210 21,000 25,410
9999 Materials for filling in holes and cracks
(putty etc.) L.S. 6,760 178 1,203
9999 Carriage of material L.S. 1,430 178 255
LABOUR:
0131 Painter day 0,540 39,900 21,546
0115 Coolie day 0,540 32,900 17,766
9999 Brushes, sand paper etc. L.S. 10,790 178 1,921
Code No Description Unit Quantity
9999 Sundries L.S. 6,760 178 1,203
TOTAL 69,304
Add Water Charges @ 1% 693
TOTAL 69,997
Add CPOH @ 15% 10,500
Cost of 10 sqm 80,497
Cost of 1 sqm 8,050
Say 8,050
13.61 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:
13.61.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
0833 MATERIAL: litre 1,160 18,000 20,880
Synthetic enamel paint in black or chocolate shade
9999 Materials for filling in holes and cracks (putty etc.) L.S. 5,330 178 949
9999 Carriage LABOUR: L.S. 1.430 1.78 2.55
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 64,034
Add Water Charges @ 1% 640
TOTAL 64,674
Add CPOH @ 15% 9,701
Cost of 10 sqm 74,375
Cost of 1 sqm 7,438
Say 7,440
13.62 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an
even shade:
13.62.1 Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufactu

Code No Description Unit Quantity


Details of cost for 10 sqm
0823 MATERIAL: litre 0,750 9,000 6,750
Pink primer (for wood)
9999 Putty L.S. 2,730 178 486
9999 Carriage L.S. 0,390 178 069
LABOUR:
0131 Painter day 0,250 39,900 9,975
0115 Coolie day 0,250 32,900 8,225
9999 Brushes, sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 10,790 178 1,921
MATERIAL:
0833 Synthetic enamel paint in black or chocolate shade litre 1,160 18,000 20,880
9999 Carriage of paint and material L.S. 1,430 178 255
LABOUR:
0131 Painter day 0,540 39,900 21,546
0115 Coolie day 0,540 32,900 17,766
9999 Brushes, sand paper etc. L.S. 6,760 178 1,203

Code No Description Unit Quantity


9999 Sundries L.S. 8,060 178 1,435

TOTAL 91,460
Add Water Charges @ 1% 915
TOTAL 92,375
Add CPOH @ 15% 13,856
Cost of 10 sqm 106,231
Cost of 1 sqm 10,623
Say 10,625
13.63 Painting with aluminium paint of approved brand and manufacture to give an even shade.
13.63.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
0826 MATERIAL: litre 0,800 16,000 12,800
Aluminium paint

9999 Carriage of paint and material L.S. 1,430 178 255


9999 Putty etc. LABOUR: L.S. 5.330 1.78 9.49
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 11,960 178 2,129
TOTAL 56,648
Add Water Charges @ 1% 566
TOTAL 57,214
Add CPOH @ 15% 8,582
Cost of 10 sqm 65,796
Cost of 1 sqm 6,580
Say 6,580
13.64 Painting with acid proof paint of approved brand and manufacture of required colour to give an even
shade:
13.64.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
0827 MATERIAL: litre 1,160 20,000 23,200
Acid proof paint (chocolate or black)

9999 Carriage of paint L.S. 1,430 178 255


9999 Putty LABOUR: L.S. 5.330 1.78 9.49
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 66,354
Add Water Charges @ 1% 664
TOTAL 67,018
Add CPOH @ 15% 10,053
Cost of 10 sqm 77,071
Cost of 1 sqm 7,707
Say 7,705
13.65 Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even
shade:
13.65.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
0828 MATERIAL: litre 0,950 11,500 10,925
Anticorrosive bituminous paint (black)
9999 Carriage LABOUR: L.S. 1.430 1.78 2.55
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Putty, brushes, sand paper etc. L.S. 5,330 178 949
9999 Sundries L.S. 8,060 178 1,435
TOTAL 52,876
Add Water Charges @ 1% 529
TOTAL 53,405
Add CPOH @ 15% 8,011
Cost of 10 sqm 61,416
Cost of 1 sqm 6,142
Say 6,140
13.66 Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an
even shade:
13.66.1 Two or more coats on new work

Code No Description Unit Quantity


Details of cost for 10 sqm
0831 MATERIAL: litre 1,480 14,500 21,460
Floor enamel paint in all shades except green
9999 Carriage L.S. 1,430 178 255
9999 Putty etc. LABOUR: L.S. 5.330 1.78 9.49
0131 Painter day 0.540 399.00 215.46

0115 Coolie day 0,540 32,900 17,766


9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 8,060 178 1,435
TOTAL 64,614
Add Water Charges @ 1% 646
TOTAL 65,260
Add CPOH @ 15% 9,789
Cost of 10 sqm 75,049
Cost of 1 sqm 7,505
Say 7,505
13.67 Varnishing with varnish of approved brand and manufacture:
13.67.1 Two or more coats of glue sizing with copal varnish over an under coat of flatting varnish

Code No Description Unit Quantity


Details of cost for 10 sqm
MATERIAL:
0856 Ordinary varnish litre 0,700 10,000 7,000
0763 Glue kilogram 0,070 7,000 490
0857 Superior copal varnish litre 1,160 19,000 22,040
9999 Carriage L.S. 1,430 178 255
9999 Putty for repair to holes etc. L.S. 5,330 178 949
LABOUR:
0131 Painter (0.36+0.54=0.90) day 0,900 39,900 35,910
Code No Description Unit Quantity Rate ` Amount `
0115 Coolie (0.36+0.54=0.90) day 0,900 32,900 29,610
9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 7,150 178 1,273
TOTAL 98,730
Add Water Charges @ 1% 987
TOTAL 99,717
Add CPOH @ 15% 14,958
Cost of 10 sqm 114,675
Cost of 1 sqm 11,468
Say 11,470
13.67.2 Two or more coats glue sizing with spar varnish or an under coat of flatting varnish
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
0856 MATERIAL: litre 0,700 10,000 7,000
Ordinary varnish
0763 Glue kilogram 0,070 7,000 490
0858 Superior spar varnish litre 1,260 19,000 23,940
9999 Carriage L.S. 1,430 178 255
9999 Repair etc. L.S. 2.730 1.78 4.86
0131 LABOUR: day 0.900 399.00 359.10
Painter (0.36+0.54=0.90)
0115 Coolie (0.36+0.54=0.90) day 0,900 32,900 29,610
9999 Brushes, sand paper etc. L.S. 6,760 178 1,203
9999 Sundries L.S. 7,150 178 1,273
TOTAL 100,167
Add Water Charges @ 1% 1,002
TOTAL 101,169
Add CPOH @ 15% 15,175
Cost of 10 sqm 116,344
Cost of 1 sqm 11,634
Say 11,635
13.68 French spirit polishing:
13.68.1 Two or more coats on new works including a coat of wood filler
Code No Description Unit Quantity Rate ` Amount `
Details of cost for 10 sqm
1000 MATERIAL: litre 1,630 7,000 11,410
Spirit
9999 Pigment L.S. 7,150 178 1,273
0999 Shellac kilogram 0,240 30,000 7,200
9999 Carriage of material L.S. 2,730 178 486
9999 White woolen cloth, putty L.S. 16,120 178 2,869
9999 Sand paper cotton etc. L.S. 13,390 178 2,383
9999 Lineseed oil L.S. 1.430 1.78 2.55
0131 LABOUR: day 3.500 399.00 1396.50
Painter
9999 Sundries L.S. 8,060 178 1,435
TOTAL 166,961
Add Water Charges @ 1% 1,670
TOTAL 168,631
Add CPOH @ 15% 25,295
Cost of 10 sqm 193,926
Cost of 1 sqm 19,393
Say 19,395
neral CPWD, Nirman Bhawan, New Delhi
ormation storage and retrieval system, without permission, in writing, from the Director General, CPWD, New Delhi
e used by other Govt. departments, PSUs, private bodies & individuals also at their own discretion. CPWD shall not be responsib
items. It is based on scientific assessment of Inputs of materials, labour and machinery in various item
or revision in the years 1955, 1962, 1972, 1977, 1985, 1997, 2007, 2012 & 2013. Since publication of
d items of works in DSR 2014.
on the part of Shri Diwakar Garg, Special D.G.(HQ), Shri Mukesh Vij, ADG (TD), Shri B.B. Dhar, Chief En
l document to various Central Govt. Ministries, Departments & Public Sector Undertakings also besides

Rates for Delhi 2013 with updated correction slips, including analysis of existing items and also corresponding new items introdu
ses of many items have been modified to correspond to items of DSR 2014. Few new analysis and sub items have been introd

ncorporated in the analysis, pertain to materials conforming to BIS Standards/ CPWD Specifications/Materials of goo

QA), Shri K.R. Meena EE (TAS-I), Sh. A.K. Goel EE(QA-I), Shri Chhabilal Singh AE, Shri S.C. Saxena AE, Shri Ram

error or omission is noticed, it may be brought to the notice of the Superintending Engineer (TAS), CPWD, Room no

GE No.
-740

-796

-830

-936

-1008
9-1202

3-1280

1-1306

7-1330

1-1350

1-1352

3-1372

3-1380

1-1392

Unit Quantity Rate ` Amount `

52,374
27,939
24,675
33,396
2,245
140,629
1,406
142,035
21,305
163,340
16,334
16,335

Unit Quantity Rate ` Amount `

40,403
27,939
24,675
33,396
2,245
128,658
1,287
129,945
19,492
149,437
14,944
14,945

Unit Quantity Rate ` Amount `

62,557
33,360
28,952
35,937
2,245
163,051
1,631
164,682
24,702
189,384
18,938
18,940

Unit Quantity Rate ` Amount `

48,259

33,360
28,952
35,937
2,245
148,753
1,488
150,241
22,536
172,777
17,278
17,280

Unit Quantity Rate ` Amount `

81,470
39,198
33,558
39,930
2,245
196,401
1,964
198,365
29,755
228,120
22,812
22,810

Unit Quantity Rate ` Amount `

62,849
39,198
33,558
39,930
2,245
177,780
1,778
179,558
26,934
206,492
20,649
20,650

Unit Quantity Rate ` Amount `

60,078
27,939
24,675
33,396
2,245
148,333
1,483
149,816
22,472
172,288
17,229
17,230

Unit Quantity Rate ` Amount `


48,107

27,939
24,675
33,396
2,245
136,362
1,364
137,726
20,659
158,385
15,839
15,840
Unit Quantity Rate ` Amount `

71,759
33,360
28,952
35,937
2,245
172,253
1,723
173,976
26,096
200,072
20,007
20,005

Unit Quantity Rate ` Amount `

57,461

33,360
28,952
35,937
2,245
157,955
1,580
159,535
23,930
183,465
18,347
18,345

Unit Quantity Rate ` Amount `

93,454

39,198
33,558
39,930
2,245
208,385
2,084
210,469
31,570
242,039
24,204
24,205

Unit Quantity Rate ` Amount `


74,833

39,198
33,558
39,930
2,245
189,764
1,898
191,662
28,749
220,411
22,041
22,040

Unit Quantity Rate ` Amount `

64,344

27,939
24,675
33,396
2,245
12,600
189
11,259
8,883
1,435
186,965
1,870
188,835
28,325
217,160
21,716
21,715

Unit Quantity Rate ` Amount `

52,374

27,939
24,675
33,396
2,245
12,600
189
11,259
8,883
1,435
174,995
1,750
176,745
26,512
203,257
20,326
20,325

Unit Quantity Rate ` Amount `

Unit Quantity Rate ` Amount `


768.56
333.60

28,952
35,937
2,245
12,600
189
11,259
8,883
1,435
211,716
2,117
213,833
32,075
245,908
24,591
24,590

Unit Quantity Rate ` Amount `

62,557

33,360
28,952
35,937
2,245
12,600
189
11,259
8,883
1,435
197,417
1,974
199,391
29,909
229,300
22,930
22,930

Unit Quantity Rate ` Amount `


72,048

27,939
24,675
33,396
2,245
Amount `
12,600
189
11,259
8,883
1,435
194,669
1,947
196,616
29,492
226,108
22,611
22,610

Unit Quantity Rate ` Amount `

112,075

39,198
33,558
39,930
2,245
12,600
189
11,259
8,883
1,435
261,372
2,614
263,986
39,598
303,584
30,358
30,360

Unit Quantity Rate ` Amount `

86,058

33,360
28,952
35,937
2,245
12,600
189
11,259
8,883
Amount `
1,435
220,918
2,209
223,127
33,469
256,596
25,660
25,660

Unit Quantity Rate ` Amount `

53,631

20,201

50,457
42,441
38,115
2,245
207,090
2,071
209,161
31,374
240,535
24,054
24,055

Unit Quantity Rate ` Amount `

53,631

36,024

50,457
42,441
38,115
2,245

Unit Quantity Rate ` Amount `

84,077

27,939
24,675
33,396
2,245
172,332
1,723
174,055
26,108
200,163
20,016
20,015

half brick wall. Code No Description Unit Qu

100,425

33,360
28,952
35,937
2,245
200,919
2,009
202,928
30,439
233,367
23,337
23,335

Unit Quantity Rate ` Amount `

130,786

39,198
33,558
39,930
2,245
245,717
2,457
248,174
37,226
285,400
28,540
28,540

Unit Quantity Rate ` Amount `

32,172

21,267
24,675
33,396
2,383
2,083
115,976
1,160
117,136
17,570
134,706
13,471
13,470

Unit Quantity Rate ` Amount `

32,172

21,267
24,675
33,396

2,383
2,083
12,600
189
11,259
8,883
1,435
500
370
093
2,541
2,303
486

Amount `

13,860

208
11,259
8,883
1,435
35,645
356
36,001
5,400
41,401
4,140
4,140

layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster 1:3 (1 cement : 3 fine sand) mixed with 10% finel

Unit Quantity Rate ` Amount `

60,078

27,939
24,675
33,396
17.59
536.20

25,437
22,701
30,855
1,759
11,000
363
2,070
648
20,850
16,450
3,630
1,759
10,875
8,225
358,089
3,581
361,670
54,250
415,920
41,592
41,590

2 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) mixed w

Unit Quantity Rate ` Amount `

60,078
27,939
24,675
33,396
17.59
536.20

25,437
22,701
30,855
1,759
11,000
363
2,070
648
20,850
16,450
3,630
1,759
787
339,776
3,398
343,174
51,476
394,650
39,465
39,465
Amount `

Amount `
9,580

8,340

9,870
3,630
1,273
32,693
327
33,020
4,953
37,973
3,797
3,795

Amount `

8,340

6,580
1,273
16,193
162
16,355
2,453
18,808
1,881
1,880

Amount `

12,510

9,870
2,383
24,763
248
25,011
3,752
28,763
2,876
2,875

Amount `

125,100

65,800
32,900
9,075
2,383
235,258
2,353
237,611
35,642
273,253
27,325
27,325

Amount `

208,500

98,700
65,800
11,979
2,383
387,362
3,874
391,236
58,685
449,921
44,992
44,990
Amount `

31,275

24,346
4,790
60,411
604
61,015
9,152
70,167
7,017
7,015

Amount `

33,360

26,320
6,063
65,743
657
66,400
9,960
76,360
7,636
7,635

Unit Quantity Rate ` Amount `

Unit Quantity Rate ` Amount `


10,350
6.94
395.85

29,939
14,948
95,516
955
96,471
14,471
110,942
11,094
11,095

Amount `

20,850

16,450
324
37,624
376
38,000
5,700
43,700
4,370
4,370

Unit Quantity Rate ` Amount `

5,092

11,259
8,883
1,815
255
27,304
273
27,577
4,137
31,714
317
315

Unit Quantity Rate ` Amount `


5,092

12,510
9,870
1,815
370
29,657
297
29,954
4,493
34,447
344
345

Unit Quantity Rate ` Amount `

5,092
14,595
11,515
1,815
486
33,503
335
33,838
5,076
38,914
389
390

Unit Quantity Rate ` Amount `

5,092
27,105
21,385
1,815
278
55,675
557
56,232
8,435
64,667
647
645

Unit Quantity Rate ` Amount `


7,274
13,344
10,528
2,178
370
33,694
337
34,031
5,105
39,136
391
390

Unit Quantity Rate ` Amount `

7,274

15,012
11,844
2,178
486
36,794
368
37,162
5,574
42,736
427
425

Unit Quantity Rate ` Amount `

7,274

17,514
13,818
2,178
787
41,571
416
41,987
6,298
48,285
483
485

Unit Quantity Rate ` Amount `

8,729
35,862
28,294
1,815
486
75,186
752
75,938
11,391
87,329
873
875

Unit Quantity Rate ` Amount `

5,214

36.37
358.62

28,294
1,815
486
75,308
753
76,061
11,409
87,470
875
875

Amount `

13,405

20,850
19,740
33,759
1,273
2,545
91,572
916
92,488
13,873
106,361
10,636
10,635

Unit Quantity Rate ` Amount `


20,554

44,619
43,099
36,300
1,273
Amount `
2,869

148,714
1,487
150,201
22,530
172,731
17,273
17,275

Amount `

20,554
1,273

27,939
26,320
46,464
2,869
125,419
1,254
126,673
19,001
145,674
14,567
14,565

Amount `

10,277
1,273
38,364
45,073
33,759
2,869
131,615
1,316
132,931
19,940
152,871
15,287
15,285
Amount `

16,980

12.73
834.00

97,384
36,300
2,869
238,206
2,382
240,588
36,088
276,676
27,668
27,670

Unit Quantity Rate ` Amount `

33,122
12.73
834.00

97,384
36,300
2,869

254,348
2,543
256,891
38,534
295,425
29,543
29,540

Unit Quantity Rate ` Amount `

8,188

19,599
22,701
21,417
Amount `
2,869
74,774
748
75,522
11,328
86,850
8,685
8,685

Unit Quantity Rate ` Amount `

Amount `

1,950

1.62
72.60

3,290
787
486
13,935
139
14,074
2,111
16,185
1,619
1,620

Unit Quantity Rate ` Amount `

500
370
093

2,904
Amount `
1,316
486
5,669
057
5,726
859
6,585
659
660

Amount `

1,950
1,435
162
10,890
3,290
787
486
19,000
190
19,190
2,878
22,068
2,207
2,205

Amount `

1,950
1,435
162
10,890
3,290
486
486
18,699
187
18,886
2,833
21,719
2,172
2,170

Unit Quantity Rate ` Amount `

5,600
486
5,400
278
12.73
319.20

13,160
949
59,066
591
59,657
8,949
68,606
6,861
6,860

ment primer Code No Description Unit Quantit

5,600
1,273
1,435
8,250
787
20.83
399.00

16,450
1,435
77,213
772
77,985
11,698
89,683
8,968
8,970

Unit Quantity Rate ` Amount `

Unit Quantity Rate ` Amount `


787
20.59
159.60

15,134
1,435
43,625
436
44,061
6,609
50,670
5,067
5,065
Unit Quantity Rate ` Amount `

5,600
12.73
159.60

6,580
1,435
30,848
308
31,156
4,673
35,829
3,583
3,585

Unit Quantity Rate ` Amount `

17,280

2.78
183.54

7,567
3,630
1,273
1,435
49,817
498
50,315
7,547
57,862
5,786
5,785

rior primer applied @ 2.20 kg/ 10 sqm


Amount `

78,720

8,800
2.78
239.40

9,870
1,815
1,250
1,435
126,108
1,261
127,369
19,105
146,474
14,647
14,645
or primer applied @ 2.20 kg/ 10 sqm)
Amount `

30,060

8,800
2.78
239.40

9,870
1,815
1,273
1,435
77,471
775
78,246
11,737
89,983
8,998
9,000

ior primer applied @ 2.20 kg/ 10 sqm)

Unit Quantity Rate ` Amount `

34,320
8,800
278
Amount `

23,940
9,870
1,815
1,273
1,435
81,731
817
82,548
12,382
94,930
9,493
9,495

er applied @ 0.75 ltr /10 sqm


Amount `

36,250
11,250
278

23,940
9,870
1,815
1,250
1,435
86,088
861
86,949
13,042
99,991
9,999
10,000

ufacture Code No Description Unit Quantity

26,100
11,250
278
23,940
9,870
1,815
1,250
Amount `
1,435
75,938
759
76,697
11,505
88,202
8,820
8,820

Amount `

26,100

12,800
2.78
239.40

9,870
1,815
1,250
1,435
77,488
775
78,263
11,739
90,002
9,000
9,000

nd soft wood)

Amount `
6,750

486
0.69
99.75

8,225
949
1,921
28,375
284
28,659
4,299
32,958
3,296
3,295

Amount `

9,750

486
0.69
99.75

8,225
949
1,921
31,375
314
31,689
4,753
36,442
3,644
3,645

Unit Quantity Rate ` Amount `

3,780

0.93
95.76

7,896
1,921
23,266
233
23,499
3,525
27,024
2,702
2,700

Unit Quantity Rate ` Amount `


2,520

0.69
47.88

3,948
1,273
12,598
126
12,724
1,909
14,633
1,463
1,465

Unit Quantity Rate ` Amount `

36,000

093
4.86
107.73

8,883
949
1,921
59,105
591
59,696
8,954
68,650
6,865
6,865

Unit Quantity Rate ` Amount `

57,600

093
4.86
171.57

14,147
1,518
3,072
94,073
941
95,014
14,252
109,266
10,927
10,925

Unit Quantity Rate ` Amount `


5,250
486
069

9,975
8,225
972
Unit Quantity Rate ` Amount `
18.97
312.50

2.55
215.46

17,766
1,203
1,435
100,329
1,003
101,332
15,200
116,532
11,653
11,655

Unit Quantity Rate ` Amount `

7,560
2,407
0.93
99.75

8,225
486
14.35
302.50

1,203
2.55
215.46

17,766
1,921
1,203
104,325
1,043
105,368
15,805
121,173
12,117
12,115

mordant solution.

Unit Quantity Rate ` Amount `

2,520
069
4,788
3,948
1,273

12,800
255

21,546
17,766
1,203
1,435
67,603
676
68,279
10,242
78,521
7,852
7,850

Amount `

1,140
324
162
23,940
19,740
6,387
6,387
58,080
581
58,661
8,799
67,460
2,698
2,700

Amount `
045

390
286
026
324
1.62
239.40

19,740
6,387
6,387
57,687
577
58,264
8,740
67,004
2,680
2,680

hromate yellow primer on new work:

Unit Quantity Rate ` Amount `

3,780

0.93
95.76

7,896
19.21
109.25

2.55
215.46

17,766
949
1,435
949
10,876
87,967
880
88,847
13,327
102,174
3,406
3,405

Unit Quantity Rate ` Amount `

5,600
14,364
11,844
2,846
1.62
162.15

3.70
319.20

26,320
1,531
2,129
1,273
16,753
131,327
1,313
132,640
19,896
152,536
5,085
5,085

er on new work.

Unit Quantity Rate ` Amount `

3,780
093

9,576
7,896
1,921

20,880
255
949

21,546
17,766
1,203
2,129

Unit Quantity Rate ` Amount `


Unit Quantity Rate ` Amount `

5,600
1.16
143.64

11,844
28.46
309.60

370
14.12
319.20

26,320
1,782
3,170
18,049
148,753
1,488
150,241
22,536
172,777
5,759
5,760

Amount `
15,000

0.93
59.85

4,935
740
694
27,447
274
27,721
4,158
31,879
3,188
3,190

ace fire retardant.

Unit Quantity Rate ` Amount `

171,000

2.55
215.46

17,766
1,203
1,435
213,205
2,132
215,337
32,301
247,638
24,764
24,765

Amount `
255

8,400
255
24.00
141.47

949
949
27,355
274
27,629
4,144
31,773
3,177
3,175

Unit Quantity Rate ` Amount `

25,410

1,203
255

21,546
17,766
1,921
Unit Quantity Rate ` Amount `
1,203
69,304
693
69,997
10,500
80,497
8,050
8,050

Unit Quantity Rate ` Amount `

20,880

949
2.55
215.46

17,766
1,203
1,435
64,034
640
64,674
9,701
74,375
7,438
7,440

oved brand and manufacture.

Unit Quantity Rate ` Amount `

6,750

486
069

9,975
8,225
949
1,921

20,880
255

21,546
17,766
1,203

Unit Quantity Rate ` Amount `


1,435

91,460
915
92,375
13,856
106,231
10,623
10,625

Unit Quantity Rate ` Amount `

12,800

255
9.49
215.46

17,766
1,203
2,129
56,648
566
57,214
8,582
65,796
6,580
6,580

Unit Quantity Rate ` Amount `

23,200

255
9.49
215.46

17,766
1,203
1,435
66,354
664
67,018
10,053
77,071
7,707
7,705

Unit Quantity Rate ` Amount `

10,925

2.55
215.46

17,766
949
1,435
52,876
529
53,405
8,011
61,416
6,142
6,140

Unit Quantity Rate ` Amount `

21,460

255
9.49
215.46

17,766
1,203
1,435
64,614
646
65,260
9,789
75,049
7,505
7,505

Unit Quantity Rate ` Amount `

7,000
490
22,040
255
949

35,910

Amount `
29,610
1,203
1,273
98,730
987
99,717
14,958
114,675
11,468
11,470

Amount `

7,000

490
23,940
255
4.86
359.10

29,610
1,203
1,273
100,167
1,002
101,169
15,175
116,344
11,634
11,635
Amount `

11,410

1,273
7,200
486
2,869
2,383
2.55
1396.50

1,435
166,961
1,670
168,631
25,295
193,926
19,393
19,395
CPWD, New Delhi
. CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using o
machinery in various items of work normally involved in civil construction projects.
13. Since publication of Analysis of Rates for Delhi -2013, prices of labour and materials have registere

Shri B.B. Dhar, Chief Engineer(CSQ) and the efforts put in by Shri Mathura Prasad, SE TAS (CSQ) and h
ndertakings also besides various units of CPWD.

rresponding new items introduced in DSR 2014.


nd sub items have been introduced in Analysis of Rates for Delhi 2014.

ecifications/Materials of good quality generally available in the market. Labour rates are the minimum wages issued

S.C. Saxena AE, Shri Ram Janam Chaudhary JE, Shri Vijay Kumar Chief Estimator, Shri Bahal Singh Sr. Drafts Man

eer (TAS), CPWD, Room no. 418, A-wing, Nirman Bhawan, New Delhi.
Unit Quantity Rate ` Amount `
3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.
Unit Quantity Rate ` Amount `
Unit Quantity Rate ` Amount `
directly or indirectly by using or following items of DSR by such Govt./Private bodies or individuals.
materials have registered substantial increase. Besides the increased cost, there has been a spurt of

asad, SE TAS (CSQ) and his team of officers in TAS unit in finalizing Analysis of Rates for Delhi 2014 in
the minimum wages issued by the Government of Delhi w.e.f. 01.04.2014.

ri Bahal Singh Sr. Drafts Man, Shri Vijay Singh Sr.Drafts Man, and other officers & staff of TAS unit for sincere efforts
here has been a spurt of new construction materials and introduction of Green Building Concept of con

f Rates for Delhi 2014 in a record time.


f TAS unit for sincere efforts made in the preparation of this document in such a short time. Various field units, who c
n Building Concept of construction. This has necessitated revision of existing Analysis of Rates for Delh
me. Various field units, who contributed field inputs, also deserve appreciation for their timely help.
Analysis of Rates for Delhi 2013 to include the above changes. Accordingly, this Analysis of Rates for D
is Analysis of Rates for Delhi 2014 has been prepared.