Você está na página 1de 5

ALBERTO A.

MARASIGAN

POSITION DESIRED : PIPING SUPERVISOR/PIPING LINECHECKER/


COMMISSIONING SUPERVISOR
PERSONAL DATA
Date of Birth : November 21, 1969
Height : 52
Weight : 60 kgs.
Civil Status : Married
Nationality : Filipino
SSS No. : 04-07094088
Language/Dialect Spoken : English/Tagalog
Passport No. : XX4997965 valid until 18 November 2014

EDUCATIONAL BACKGROUND
College : Batangas State University (BSU) formerly
Pablo Borbon Memorial Institute of Technology
(PBMIT)
Rizal Avenue, Batangas City
Technical Drafting
1989 Graduated
Bachelor of Science in Mechanical Engineering
Undergraduate

Secondary : Bauan High School


Bauan, Batangas
1987 Graduated

Elementary : San Pascual Elementary School


San Pascual, Batangas
1983 Graduated

SUMMARY OF WORK EXPERIENCE

More than 16 years work experience in piping (construction supervision,


construction engineering design / drafting, test package preparation, line checking, pipe
fitting, commissioning) in various construction projects like refineries, chemical plants,
LNG projects, shipyard and power plant.

EMPLOYMENT RECORD

Employer : CHIYODA CORPORATION-HYUNDAI HEAVY


INDUSTRIES CO.LTD CONSORTIUM
Project : Qatar Shell GTL Project
FGP (Fuel Gas Preparation)
Country : Ras Laffan Industrial City, State of Qatar
Position : Commissioning Supervisor
Date of Employment : September 22, 2010 to November 30, 2010
February 19, 2011 to September 26, 2011

DUTIES AND RESPONSIBILITIES

: Conducts daily safety tool box meeting to Implementation Contractor


before start
work.
: Attend coordination meeting regarding the work flow at site.
: Permit to start work signatory for pre-commissioning/commissioning
activities.
: Supervision for the commissioning activities.
: Supervision for the re-instatement activities.
: Coordinates to superiors regarding the progress of work.

Employer : CB&I Lummus-TOYO J.V.


Project : SHELL ECC (Ethylene Cracker Complex)
Project
Country : Pulau Ular, Singapore
Position : Underground Piping Supervisor
Date of Employment : July 17, 2008 to September 30, 2009

DUTIES AND RESPONSIBILITIES


: Conducts daily safety tool box meeting to Implementation Contractor before work.
: Implement STA (Safety Task Assignment).
: Check work site before signing Work Permit of Implementation Contractor.
: Attend coordination meeting regarding the work flow at site.
: Supervise Piping construction and test pressure of U/G GRE piping of: Fire Water
Line, Cooling Water Line and Sewer System.
: Coordinates with the witness regarding the inspection of piping lines and pressure
test as
per package.
: Coordinates to superior regarding the progress of work.

Employer : CHIYODA-TOYO SAKHALIN DEVT. (CTSD Ltd.)


Project : Sakhalin II LNG/ OET Project
Country : Prigorodnoye, Sakhalin
Russian Federation
Position : Piping Supervisor
Date of Employment : December 17, 2006 to March 9, 2008

DUTIES AND RESPONSIBILITIES


Piping line check as per Test Package.
Conduct daily safety toolbox meeting to sub contractor.
Piping construction and Piping pressure test supervision.
Coordinates to superiors and client regarding progress of work.

Employer : WAN CHI STEEL INDUSTRIAL CO., LTD.


Project : FBPCC HAC Project (Acid Plant) & SM3
Project (Styrene Monomer Plant) under the
management of Formosa Chemical and Fiber Corp.
Country : Formosa Industrial Park, Mai Liao, Taiwan,
Republic of China
Position : Piping Supervisor
Date of Employment : March 25, 2005 to September 11, 2006

DUTIES AND RESPONSIBILITIES


Test package preparation and updating of control status.
Conducted inspection for line checking.
Revised and as-built isometric drawings as per actual field installation.
Supervised revision / additional piping work.
Punch work and hydro test supervision and coordination.
Report status (problems encountered and prepared necessary actions to meet
target date of completion prior to commissioning).

Employer : CHICAGO BRIDGE & IRON COMPANY


Project : Nigeria LNG Plus Project
under the management of TSKJ
Country : Bonny Island, Nigeria
Position : Piping Foreman
Date Employment : September 21, 2003 to September 18, 2004

DUTIES AND RESPONSIBILITIES


Responsible for the preparation of manpower distribution.
Responsible for the preparation of tools and equipment and all materials needed
for each individual area.
Responsible for fabrication and erection of different kinds of pipe spool at Train 4.
Conducted daily start safety meeting to ensure that everybody was aware of all
hazards that may be encountered in any assigned task.
Carried out final piping inspection, line checking and prepared punch list of
priority lines as per isometric and PEFS (Process Engineering Flow Scheme).
Also responsible for the hydro testing, water flushing, air blowing and
reinstatement prior to commissioning.
Reported progress of work in terms of installed quantities.

Employer : WAN CHI STEEL INDUSTRIAL CO., LTD.


Project : Phenol Project, INA Project, PC Project and EPOXY
Project under the management of Formosa Chemical
and Fiber Corp. (FCFC)
Country : Formosa Industrial Park, Mai Liao, Taiwan,
Republic of China
Position : Piping Foreman / Line Checker
Date Employment : July 29, 1999 to July 20, 2002

DUTIES AND RESPONSIBILITIES


Responsible for the preparation of manpower distribution.
Supervision of piping fabrication and installation.
Made proper pipe spooling on isometric for efficient fabrication and installation.
Represented and coordinated with client regarding the progress of job.
Prepared information data sheet for revision and additional work.
Prepared and control test package.
Responsible for piping field line check as per test package.
Piping punch listing and hydro testing supervision.

Employer : MI Contractors
Project : KEPPEL SHIPYARD (Ship build / repair Project)
Country : San Roque, Bauan, Batangas, Philippines
Position : Pipe Fitter
Date of Employment : April 01, 1998 to June 15, 1999

DUTIES AND RESPONSIBILITIES


Worked safely and was aware of all hazards, practiced good housekeeping
Prepared tools and materials.
Installation of piping inside the ship.
Piping modification work.
Demolished old piping, valves, bolts, gasket etc. and changed new as instructed.
Line testing after completed installation (Hydro or Pneumatic)
Reported progress of work in terms of installed quantities.

Employer : Shinwha Engineering & Contraction Co., Ltd.


Project : Paiton Private Power Project Phase I (Unit 7 & 8)
Under the management of Toyo Engineering
Country : Paiton Probolingo, East Java, Republic of Indonesia
Position : Piping Designer / Piping Supervisor
Date of Employment : February 28, 1997 to February 28, 1998

DUTIES AND RESPONSIBILITIES


Supervision of sub-contractor for fabrication & installation of piping works.
Conducted twice a week meeting with sub-contractor superior regarding the
progress of actual field installation.
Responsible for proper pipe spooling on isometric for efficient fabrication and
installation.
Prepared isometric detailed drawing based on general arrangement drawing
(GAD) with conform piping & instrument diagram (P&ID).
Prepared material take off and compute work volume as per drawing requirement.
Revised per isometric drawing if in case design or discrepancies with actual field
installation.
Designated pipe routing at site.

Employer : SANKO ENGINEERING CORPORATION


Project : QGL Plant Project under the management of
CHIYODA Engineering
Country : Ras Laffan, State of Qatar
Position : Piping Draftsman
Date of Employment : January 06, 1996 to September 17, 1996

DUTIES AND RESPONSIBILITIES


Detailing of jacketed pipe for sulfur line.
Made proper pipe spooling on isometric drawing for efficient fabrication &
installation.
Marking of weld joints on isometric drawing.
Computed work volume per isometric drawing.
Revised per isometric drawing if in case design changes or discrepancies with an
actual field installation.
Separated and transferred piping isometric drawing based on general
arrangement drawing.

Employer : CHEMPHIL LMG INC.


Country : San Pascual, Batangas Philippines
Position : Draftsman
Date of Employment : March 09, 1995 to July 31, 1995

DUTIES AND RESPONSIBILITIES


Made proper coordination to my superior regarding the drawing to be made.
Made actual field check and designate.
Detailing of assembly of mechanical, structural work.
Prepared piping plan drawing with detailed isometric.
Prepared list of materials.

Employer : METAPHIL, INC.


Project : Caltex Debottlenecking Project under the
management of Parson Intl
Country : Caltex Refinery, San Pascual, Batangas, Philippines
Position : Piping Draftsman / Field Engineer
Date of Employment : June 16, 1993 to January 19, 1995

DUTIES AND RESPONSIBILITIES


Responsible for field checking of existing piping location, demolition of existing,
modification of existing and installation of new piping.
Supervision of piping installation at site.
Monitoring the progress of job by mark-up and represent to my superior.
Separated and transferred isometric drawing based on general arrangement
(GAD).
Prepared materials take-off as per given project specification.
Made proper pipe spooling for efficient fabrication and installation.
Revised for isometric drawing if in case design changes or discrepancies with
actual field installation.

Employer : ATLANTIC GULF & PACIFIC (AG&P)


Project : Enron Power Plant under the management of
Flour Daniel
Country : Pinamucan, Batangas Philippines
Position : Pipe Fitter
Date Employment : March 20, 1993 to June 15, 1993

DUTIES AND RESPONSIBILITIES


Installation of fabricated spool at jobsite.
Modified piping as per actual field installation.
Checked list materials to withdraw for completion of line.
Reported daily work progress to the superior.

Employer : Cruzant Engineering


Project : Caltex Refinery Project
Country : San Pascual Batangas Philippines
Position : Draftsman
Date of Employment : August 1989 to December 20, 1992

DUTIES AND RESPONSIBILITIES


Prepared material take off as per given project specification.
Designated pipe routing at site.
Made proper checking of isometric drawing compare with the general plan and
P&ID
Made proper coordination to my superior regarding the monitoring of work
progress.
Conducted field check and sketch before draft.
Detailing of assembly drawing of mechanical, structural work.

I hereby certify that all the above information are true and correct to the best of my
knowledge and belief.

_____________________________
ALBERTO A. MARASIGAN
(Applicant)

Você também pode gostar