Direct and Indirect control (4) are used to produce the required movements by pneumatic cylinders under certain conditions. LOGIC OPERATIONS (2) To sustain the actuation of the input elements Signal storage (2) Signal storage with double solenoid valve (3) Relay circuit with latching (2) control relay with a time delay built in. Their purpose is to control an event based on time. Circuit for evaluating control elements (2) PROCEDURE FOR DESIGNING A CONTROL CIRCUIT (2) Control-Specific Functions (2):
Feeding device with control elements
In the feeding device circuit, the control elements for (6): OPERATIONS of Feeding device with control elements (4) Operating functions: The following operating functions are specified for lifting device (3): The relay control system is designed in the following order (5):
DTC P0011 Camshaft Position "A" - Timing Over - Advanced or System Performance (BANK 1) DTC P0012 Camshaft Position "A" - Timing Over - Retarded (Bank 1)